Loading...
HomeMy WebLinkAboutTerracon - 1/31/2018FIELD DENSITY TEST REPORT Irerracon Report Number: 95181011.0013 Service Date: 01/31/18 2501 E Loop 820 N Report Date: 02/07/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Lab Test Data Project Requirements Optimum Water Max. Lab Water Mat. Proctor Laboratory Content Density Content Compaction No. Ref. No. Classification and Description Test Method (%) (pcf) 1 95181011.0005 Dark Brown Sandy Clay ASTM D698 21.9 99.6 +3 94%+ 2 95181011.0004 Yellowish Brown Clayey Sand ASTM D698 18.4 106.2 +3 94%+ 3 95181011.0006 Dark Reddish Brown Sandy Clay ASTM D698 18.1 106.4 +3 94%+ Field Test Data Probe Wet Water Water Dry Percent Test Lift / Mat. Depth Density Content Content Density Compaction No. Test Location Elev. No. (in) (pcf) (pcf) (%) (pcf) (%) Parking Garage (P11.5 -P12.5/17-18) 1 P11.7/17.8 3 1 6 120.7 24.8 25.9 95.9 96 2 P12.2/17.4 3 1 6 120.7 25.3 26.5 95.4 96 3 P11.5/17.3 4 1 6 120.9 27.0 28.8 93.9 94 4 P12.1/17.6 4 1 6 122.7 26.9 28.1 95.8 96 5 P11.6/17.9 5 1 6 122.0 26.8 28.2 95.2 96 6 P12/17.5 5 1 6 121.2 26.6 28.1 94.6 95 7 P12/17.3 6 l 6 119.3 24.7 26.1 94.6 95 8 P12.4/5 6 1 6 119.2 25.6 27.3 93.6 94 9 P11.6/17.9 7 2 6 123.2 22.7 22.6 100.5 95 10 P12.3/17.3 7 2 6 123.2 23.1 23.1 100.1 94 (P12.5 -P13/17-18) 11 P12.7/17.8 1 1 6 119.0 25.1 26.7 93.9 94 12 P12.5/17.4 1 1 6 121.1 24.9 25.9 96.2 97 Datum: Moisture Condition. Serial No: Std. Cut. M:658 Std. Cut. D: 2067 Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition (ASTM D-6938). Terracon Rep.: Daniel Moreno Reported To: Contractor: Report Distribution: (1) Brooks Hospitality Consulting Corp, Mark (1) Manhattan Construction Co, Ben Jensen Reviewed By: Brooks Jo -. . T upa (1) Manhattan Construction Co, Brad (1) Manhattan Construction Co, Chase Pritchard Senior Project Manager Scheckelhoff (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CRoo07, 11-16-12, Rev.7 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0012 Service Date: 01/31/18 2501 E Loop 820 N Report Date: 03/09/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 9211 Supplier: Argos Batch Time: 1323 Plant: 123 Truck No.: 5037 Ticket No.: 12323954 Field Test Data Received 1 A Test Result Specification Slump (in): 61/2 6-8 Air Content (%): 2.0 0-3 Concrete Temp. (F): 65 45-95 Ambient Temp. (F): 70 36-100 Plastic Unit Wt. (pcf): 148.4 150.2 Yield (Cu. Yds.): 44.7 Laboratory Test Data Set Specimen Avg Diam. Area Date No. ID (in) (sq in) Received 1 A 4.00 12.57 02/01/18 1 B 4.00 12.57 02/01/18 1 C 4.00 12.57 02/01/18 1 D 4.00 12.57 02/01/18 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: 01/31/18 Sample Time: 1450 Daniel Blocker Clear 20 Batch Size (cy): 10 bucket Pier 2066, Grid Line P7/16) Drilled Piers, see report 95181011.0011 Age at Maximum Date Test Load Tested (days) (lbs) 02/07/18 7 55,090 02/28/18 28 68,260 02/28/18 28 79,340 02/28/18 28 72,890 Average (28 days) 1 E 02/01/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Strength Fracture (psi) Type 4,380 4 5,430 3 6,310 4 5,800 5 5,850 Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0012 Service Date: 01/31/18 Report Date: 03/09/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0012 Service Date: 01/31/18 2501 E Loop 820 N Report Date: 02/12/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 9211 Supplier: Argos Batch Time: 1323 Plant: 123 Truck No.: 5037 Ticket No.: 12323954 Field Test Data A 4.00 Test Result Specification Slump (in): 61/2 6-8 Air Content (%): 2.0 0-3 Concrete Temp. (F): 65 45-95 Ambient Temp. (F): 70 36-100 Plastic Unit Wt. (pcf): 148.4 150.2 Yield (Cu. Yds.): 44.7 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E Initial Cure: Outside Final Cure: Moist Comments: Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Area Date Date (sq in) Received Tested 12.57 02/01/18 02/07/18 12.57 02/01/18 02/28/18 12.57 02/01/18 02/28/18 12.57 02/01/18 02/28/18 02/01/18 Final Cure: Moist Room 01/31/18 Sample Time: 1450 Daniel Blocker Clear 20 Batch Size (cy): 10 bucket Pier 2066, Grid Line P7/16) Drilled Piers, see report 95181011.0011 Age at Maximum Test Load (days) (lbs) 7 55,090 28 28 28 Hold Compressive Strength Fracture (psi) Type 4,380 4 Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0012 Service Date: 01/31/18 Report Date: 02/12/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Report Number: 95181011.0011 Irerracon Service Date: 01/31/18 2501 E Loop 820 N Report Date: 07/02/18 Revision 1 - Change locations Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0011 Service Date: January 31, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Daniel Blocker Pier Identification P7/16 P6/16 P7/15.20 P7/15.28 Pier Diameter (in.) 48 48 24 24 Top of Ground Elevation (ft.) 622.86 622.82 622.25 622.25 Top of Pier Elevation (ft.) 619.08 619.08 619.08 619.08 Depth to Bearing Stratum from Ground (ft.) 18.0 18.0 18.5 19.5 Depth of Pier from Ground (ft.) 48.0 48.0 36.0 36.5 Required Penetration (ft.) 30.0 30.0 17.0 17.0 Actual Penetration (ft.) 30.0 30.0 17.5 17.0 Depth from Top of Concrete (ft.) 44.4 44.4 32.4 32.9 Condition of Bottom (wet or dry) Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Casing Diameter (in.) 50 50 26 26 Cased Depth (ft.) 20.0 20.0 20.0 20.0 Number of Vertical Bars (ea.) 16 16 8 8 Reinforcing Bar Size (#) 10 10 8 8 Length of Vertical Bars (ft.) 46.7 46.8 34.5 35.5 Time Drilling was Completed 12:30 PM 11:00 AM 2:18 PM 4:15 PM Time Concrete was Placed 3:00 PM 2:20 PM 5:00 PM 6:00 PM Page 1 of 1 Distribution Page Report Number: 95181011.0011 Service Date: 01/31/18 Report Date: 07/02/18 Revision 1 - Change locations Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Report Number: 95181011.0011 Irerracon Service Date: 01/31/18 2501 E Loop 820 N Report Date: 02/07/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Brooks Hospitality Consulting Corp Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 206 Oldenwood Ct Colleyville, TX 76034 Grapevine, TX 76051 Project Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: (1) Brooks Hospitality Consulting Corp, (1) Manhattan Construction Co, Ben Mark Brooks Jensen (1) Manhattan Construction Co, Brad (1) Manhattan Construction Co, Chase Reviewed By: Scheckelhoff Pritchard (1) Manhattan Construction Co, Daniel (1) Manhattan Construction Co, David �,Tupa Rideau Saiter (1) Manhattan Construction Co, Frederick (1) Manhattan Construction Co, Robert Senior Project Manager Moore Montaomery The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0011 Service Date: January 31, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Daniel Blocker Pier Identification P7/16 P6/16 P7/152.0 P7/152.8 Pier Diameter (in.) 48 48 24 24 Top of Ground Elevation (ft.) 622.86 622.82 622.25 622.25 Top of Pier Elevation (ft.) 619.08 619.08 619.08 619.08 Depth to Bearing Stratum from Ground (ft.) 18.0 18.0 18.5 19.5 Depth of Pier from Ground (ft.) 48.0 48.0 36.0 36.5 Required Penetration (ft.) 30.0 30.0 17.0 17.0 Actual Penetration (ft.) 30.0 30.0 17.5 17.0 Depth from Top of Concrete (ft.) 44.4 44.4 32.4 32.9 Condition of Bottom (wet or dry) Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Casing Diameter (in.) 50 50 26 26 Cased Depth (ft.) 20.0 20.0 20.0 20.0 Number of Vertical Bars (ea.) 16 16 8 8 Reinforcing Bar Size (#) 10 10 8 8 Length of Vertical Bars (ft.) 46.7 46.8 34.5 35.5 Time Drilling was Completed 12:30 PM 11:00 AM 2:18 PM 4:15 PM Time Concrete was Placed 3:00 PM 2:20 PM 5:00 PM 6:00 PM Page 1 of 1 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0008A Irerracon Service Date: 01/31/18 2501 E Loop 820 N Report Date: 02/07/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Brooks Hospitality Consulting Corp Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 206 Oldenwood Ct Colleyville, TX 76034 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5 Report No.: 95181011.0008 No. of Cylinders: 1 set of 5 cylinders (4x8) Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: Grapevine, TX 76051 Project Number: 95181011 (1) Brooks Hospitality Consulting Corp, (1) Manhattan Construction Co, Ben Mark Brooks Jensen (1) Manhattan Construction Co, Brad (1) Manhattan Construction Co, Chase Reviewed By: Scheckelhoff Pritchard (1) Manhattan Construction Co, Daniel (1) Manhattan Construction Co, David �,Tupa Rideau Saiter (1) Manhattan Construction Co, Frederick (1) Manhattan Construction Co, Robert Senior Project Manager Moore Montaomery The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of I