HomeMy WebLinkAboutTerracon - 3/07/2018CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0078A Irerracon Service Date: 03/07/18 2501 E Loop 820 N Report Date: 03/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5 Report No.: 95181011.0078 No. of Cylinders: 1 set of 5 (4 x 8) Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �,T Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of I Distribution Page Report Number: 95181011.0078A Service Date: 03/07/18 Report Date: 03/09/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 REINFORCING STEEL OBSERVATIONS REPORT Report Number: 95181011.0083 Irerracon Service Date: 03/07/18 2501 E Loop 820 N Report Date: 03/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 Services Requested By: David Saiter Connection Type/Description: columns/wall Visual Observation Elevation(s)/Location(s): GL( P7/16.1) — (P7/15) Type of Observation: initial Referenced Documents: PKS-100A Observation Results: Based on our visual observations, the connections observed at the referenced locations appeared to be the proper size, type, in the proper location and placed in general accordance with the identified referenced documents. Exceptions: Comments: Had one place where the steel needed to be tied better. Informed David, and the bars were promptly tightened. Services: Observation of Reinforcing Steel Placement Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �njupa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0019, 6-30-11, Rev.1 Page 1 of 1 Distribution Page Report Number: 95181011.0083 Service Date: 03/07/18 Report Date: 03/09/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0081 Service Date: 03/07/18 2501 E Loop 820 N Report Date: 04/11/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 9211 Supplier: Argos Batch Time: 1050 Plant: 123 Truck No.: 4027 Ticket No.: 12325212 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 61/2 6-8 1.9 0-3 62 50-95 65 36-100 Laboratory Test Data 44.5 Set Specimen Avg Diam. Area Date No. ID (in) (sq in) Received 1 A 4.00 12.57 03/08/18 1 B 4.00 12.57 03/08/18 1 C 4.00 12.57 03/08/18 1 D 4.00 12.57 03/08/18 Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: 03/07/18 Sample Time: 1145 Daniel Blocker Clear 10 Batch Size (cy): 10 PUMP Pier, Grid Line P12/17.8 Drilled Piers, see report 95181011.0080 Age at Maximum Date Test Load Tested (days) (lbs) 03/14/18 7 38,210 04/04/18 28 70,970 04/04/18 28 64,960 04/04/18 28 66,410 Average (28 days) Compressive Strength Fracture (psi) Type 3,040 5 5,650 4 5,170 5 5,280 3 5,370 1 E 03/08/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Terracon Services: Verify aggregate moisture contents and batch weight corrections, witness batching procedure, sample concrete, perform plastic concrete tests and cast cylinders for laboratory strength testing. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0081 Service Date: 03/07/18 Report Date: 04/11/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) City of Grapevine TX, Curtis A Bergthold (1) CMG Construction, Blake Cearley (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0081 Service Date: 03/07/18 2501 E Loop 820 N Report Date: 03/20/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 9211 Supplier: Argos Batch Time: 1050 Truck No.: 4027 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Plant: 123 Ticket No.: 12325212 Result Specification 61/2 6-8 1.9 0-3 62 50-95 65 36-100 Laboratory Test Data 44.5 Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E Initial Cure: Outside Final Cure: Moist Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Area Date Date (sq in) Received Tested 12.57 03/08/18 03/14/18 12.57 03/08/18 04/04/18 12.57 03/08/18 04/04/18 12.57 03/08/18 04/04/18 03/08/18 Final Cure: Moist Room Comments: Not tested for plastic unit weight. 03/07/18 Sample Time: 1145 Daniel Blocker Clear 10 Batch Size (cy): 10 PUMP Pier, Grid Line P12/17.8 Drilled Piers, see report 95181011.0080 Age at Maximum Test Load (days) (lbs) 7 38,210 28 28 28 Hold Compressive Strength Fracture (psi) Type 3,040 5 Samples Made By: Terracon Services: Verify aggregate moisture contents and batch weight corrections, witness batching procedure, sample concrete, perform plastic concrete tests and cast cylinders for laboratory strength testing. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0081 Service Date: 03/07/18 Report Date: 03/20/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Report Number: 95181011.0080 Irerracon Service Date: 03/07/18 2501 E Loop 820 N Report Date: 07/02/18 Revision 1 - Change locations Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0080 Service Date: March 7, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Daniel Blocker Pier Identification P12/17.8 P10/18 P3/16 P13/18 P1/16.45 P1/15 P2.2/15 Pier Diameter (in.) 36 36 48 24 24 36 36 Top of Ground Elevation (ft.) 626.85 628.00 629.80 626.32 630.38 631.55 631.19 Top of Pier Elevation (ft.) 622.58 623.58 631.08 622.58 626.55 631.08 631.08 Depth to Bearing Stratum from Ground (ft.) 27.0 25.0 26.0 25.0 27.0 27.0 26.0 Depth of Pier from Ground (ft.) 52.0 50.2 57.4 51.4 43.0 51.0 48.2 Required Penetration (ft.) 24.0 23.0 31.0 25.0 16.0 24.0 21.0 Actual Penetration (ft.) 25.0 25.2 31.4 26.4 16.0 24.0 22.2 Depth from Top of Concrete (ft.) 622.6 623.6 631.1 622.6 626.6 631.1 631.1 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 38 38 50 26 26 38 38 Cased Depth (ft.) 28.0 27.0 28.0 26.0 28.0 28.0 28.0 Number of Vertical Bars (ea.) 12 12 16 8 8 12 12 Reinforcing Bar Size (#) 9 9 10 8 8 9 9 Length of Vertical Bars (ft.) 50.2 48.2 61.8 50.2 41.3 53.0 50.7 Time Drilling was Completed 8:45 AM 9:30 AM 9:30 AM 12:45 PM 12:00 PM 3:20 PM 2:00 PM Time Concrete was Placed 12:45 PM 1:40 PM 2:45 PM 3:30 PM 3:45 PM 5:00 PM 5:30 PM Page 1 of 1 Distribution Page Report Number: 95181011.0080 Service Date: 03/07/18 Report Date: 07/02/18 Revision 1 - Change locations Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DRILLED PIER OBSERVATION REPORT Report Number: 95181011.0080 Irerracon Service Date: 03/07/18 2501 E Loop 820 N Report Date: 03/15/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet for recorded data. NOTE: Elevation data provided by others or taken from plans. Services: Drilled Pier Observation Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0080 Service Date: March 7, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Daniel Blocker Pier Identification P12/17.8 P10/18 P3/16 P13/18 P1/16.45 P1/15 P2.2/15 Pier Diameter (in.) 36 36 48 24 24 36 36 Top of Ground Elevation (ft.) 626.85 628.00 629.80 626.32 630.38 631.55 631.19 Top of Pier Elevation (ft.) 622.58 623.58 631.08 622.58 626.55 631.08 631.08 Depth to Bearing Stratum from Ground (ft.) 27.0 25.0 26.0 25.0 27.0 27.0 26.0 Depth of Pier from Ground (ft.) 52.0 50.2 57.4 51.4 43.0 51.0 48.2 Required Penetration (ft.) 24.0 23.0 31.0 25.0 16.0 24.0 21.0 Actual Penetration (ft.) 25.0 25.2 31.4 26.4 16.0 24.0 22.2 Depth from Top of Concrete (ft.) 622.6 623.6 631.1 622.6 626.6 631.1 631.1 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 38 38 50 26 26 38 38 Cased Depth (ft.) 28.0 27.0 28.0 26.0 28.0 28.0 28.0 Number of Vertical Bars (ea.) 16 16 16 8 8 16 16 Reinforcing Bar Size (#) 10 10 10 8 8 10 10 Length of Vertical Bars (ft.) 50.2 48.2 61.8 50.2 41.3 53.0 50.7 Time Drilling was Completed 8:45 AM 9:30 AM 9:30 AM 12:45 PM 12:00 PM 3:20 PM 2:00 PM Time Concrete was Placed 12:45 PM 1:40 PM 2:45 PM 3:30 PM 3:45 PM 5:00 PM 5:30 PM Page 1 of 1 Distribution Page Report Number: 95181011.0080 Service Date: 03/07/18 Report Date: 03/15/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0079A Irerracon Service Date: 03/07/18 2501 E Loop 820 N Report Date: 03/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5 Report No.: 95181011.0079 No. of Cylinders: 1 set of 5 (4 x 8) Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �,T Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of I Distribution Page Report Number: 95181011.0079A Service Date: 03/07/18 Report Date: 03/09/18 Task: Distribution List (1) Coury Hospitality, mark@brookshc.com (1)AECC Inc, leel@aeccinc.com (1) City of Grapevine TX, curtisb@grapevinetexas.gov (1) Manhattan Construction Co, bjensen@manhattanconstruction.com (1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com (1) Manhattan Construction Co, cpritchard@manhattanconstruction.com (1) Manhattan Construction Co, drideau@manhattanconstruction.com (1) Manhattan Construction Co, dsaiter@manhattanconstruction.com (1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com (1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600