HomeMy WebLinkAboutTerracon - 3/13/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0096
Service Date: 03/13/18 2501 E Loop 820 N
Report Date: 04/16/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Maximum
Material Information
Set Specimen Avg Diam.
Sample Information
Date Date
Specified Strength: 4,000
psi @ 28
days
Sample Date:
03/13/18 Sample Time: 1215
(sq in)
Received Tested
(days)
Sampled By:
Daniel Moreno
Mix ID:
1 A 4.00
12.57
Weather Conditions:
Clear/No wind
Supplier:
6,480
4
Accumulative Yards:
16/40 Batch Size (cy): 8
Batch Time: 1102
Plant:
97,450
Placement Method:
Direct Discharge
Truck No.: 0
Ticket No.:
12325606
Water Added Before (gal):
101,430
Field Test Data
2
1 D 4.00
Water Added After (gal):
04/10/18
28
99,680
7,930
Sample Location:
Pier- P11/16
Test
Result
Specification
Placement Location:
Pier- P11/16
Slump (in):
5
5-7
Hold
Air Content (%):
1.6
0-3
Initial Cure: Outside
Concrete Temp. (F):
70
50-95
Ambient Temp. (F):
55
36-100
Plastic Unit Wt. (pcf):
150.0
Yield (Cu. Yds.):
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days)
(lbs)
(psi)
Type By
1 A 4.00
12.57
03/20/18
7
81,470
6,480
4
1 B 4.00
12.57
04/10/18
28
97,450
7,750
4
1 C 4.00
12.57
04/10/18
28
101,430
8,070
2
1 D 4.00
12.57
04/10/18
28
99,680
7,930
5
Average
(28 days)
7,920
1 E
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0096
Service Date: 03/13/18
Report Date: 04/16/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0096
Service Date: 03/13/18 2501 E Loop 820 N
Report Date: 03/27/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
Supplier:
Batch Time: 1102 Plant:
Truck No.: 0 Ticket No.: 12325606
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
5
5-7
1.6
0-3
70
50-95
55
36-100
150.0
12.57
Laboratory Test Data
Set Specimen
Avg Diam.
Area
No. ID
(in)
(sq in)
1 A
4.00
12.57
1 B
4.00
12.57
1 C
4.00
12.57
1 D
4.00
12.57
1 E
Hold
Initial Cure: Outside
Comments:
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
03/13/18 Sample Time: 1215
Daniel Moreno
Clear/No wind
16/40 Batch Size (cy): 8
Direct Discharge
Pier- P11/16
Pier- P11/16
Age at Maximum
Date Date
Test
Load
Received Tested
(days)
(lbs)
03/20/18
7
81,470
04/10/18
28
04/10/18
28
04/10/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture
(psi) Type
6,480 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Moreno
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0096
Service Date: 03/13/18
Report Date: 03/27/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
DRILLED PIER OBSERVATION REPORT
Irerracon
Report Number: 95181011.0094
Service Date: 03/13/18 2501 E Loop 820 N
Report Date: 03/20/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On this date, a Terracon technician arrived at the above referenced jobsite as scheduled for Drilled Pier Observation. See attached sheet
for recorded data. Please note that during the concrete placement for the attached drilled shafts, the undersigned informed the drilling
contractor that a tremie pipe should be used during concrete placement. The drilling contractor elected not to use a tremie pipe and Brad
with Manhattan was contacted and informed of the situation. Brad informed the drilling contractor that a tremie pipe would be used
moving forward.
NOTE: Elevation data provided by others or taken from plans.
Services: Drilled Pier Observation
Terracon Rep.: Michael Jocius
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
se0001, 10-16-13, Rev.10 Page 1 of 1
DRILLED PIER OBSERVATION
Report Number: 95181011.0094
Service Date: March 13, 2018
Client: Brooks Hospitality Consulting Corp
Attn: Mark Brooks
206 Oldenwood Ct
Colleyville, TX 76034
Driller: CMG
1 rerracon
2501 E. Loop 820 North
Fort Worth, Texas 76118
817-268-8600 Reg No: F-3272
Project:
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project No.: 95181011
Technician: Michael Jocius/Daniel Moreno
Pier Identification
P11/16
P12/16
P12/15.7
P12/15.3
P13/15.3
P13/15.7
P13/15
Pier Diameter (in.)
48
48
24
24
24
24
36
Top of Ground Elevation (ft.)
629.45
629.00
629.50
629.33
629.33
628.92
629.40
Top of Pier Elevation (ft.)
627.50
627.50
627.50
627.50
627.50
627.50
627.50
Depth to Bearing Stratum from Ground (ft.)
30.0
26.6
25.0
23.5
23.0
23.0
22.0
Depth of Pier from Ground (ft.)
58.5
61.0
41.9
39.9
44.1
44.0
43.3
Required Penetration (ft.)
27.0
34.0
16.0
16.0
21.0
21.0
20.0
Actual Penetration (ft.)
28.5
34.4
16.9
16.4
21.1
21.0
21.3
Depth from Top of Concrete (ft.)
54.0
56.0
36.0
34.9
39.1
39.5
38.3
Condition of Bottom (wet or dry)
Dry
Dry
Dry
Dry
Dry
Dry
Dry
Plumb Within Tolerance (yes or no)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Casing Diameter (in.)
50
50
26
26
26
26
38
Cased Depth (ft.)
30.0
26.6
26.0
29.0
28.5
29.0
27.0
Number of Vertical Bars (ea.)
16
16
8
8
8
8
12
Reinforcing Bar Size (#)
10
10
8
8
8
8
9
Length of Vertical Bars (ft.)
55.6
59.0
39.3
37.7
41.6
42.4
41.0
Time Drilling was Completed
10:45 AM
1:10 PM
1:00 PM
1:10 PM
1:40 PM
1:20 PM
4:15 PM
Time Concrete was Placed
2:30 PM
3:30 PM
5:00 PM
5:35 PM
6:20 PM
4:00 PM
6:45 PM
Page 1 of 1
Distribution Page
Report Number: 95181011.0094
Service Date: 03/13/18
Report Date: 03/20/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0093A
Irerracon
Service Date: 03/13/18 2501 E Loop 820 N
Report Date: 03/20/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
TOTAL NUMBER OF CONCRETE CYLINDERS PICKED UP: 5
Report No.: 95181011.0093
No. of Cylinders: 1 set of 5
Services:
Terracon Rep.: Daniel Moreno
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,T
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of I
Distribution Page
Report Number: 95181011.0093A
Service Date: 03/13/18
Report Date: 03/20/18
Task:
Distribution List
(1) Coury Hospitality, mark@brookshc.com
(1)AECC Inc, leel@aeccinc.com
(1) City of Grapevine TX, curtisb@grapevinetexas.gov
(1) Manhattan Construction Co, bjensen@manhattanconstruction.com
(1) Manhattan Construction Co, bscheckelhoff@manhattanconstruction.com
(1) Manhattan Construction Co, cpritchard@manhattanconstruction.com
(1) Manhattan Construction Co, drideau@manhattanconstruction.com
(1) Manhattan Construction Co, dsaiter@manhattanconstruction.com
(1) Manhattan Construction Co, frederick.moore@manhattanconstruction.com
(1) Manhattan Construction Co, rmontgomery2@manhattanconstruction.com
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600