HomeMy WebLinkAboutTerracon - 6/15/2018FIELD DENSITY TEST REPORT Irerracon
Report Number: 95181011.0306
Service Date: 06/15/18 2501 E Loop 820 N
Report Date: 06/20/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Lab Test Data Project Requirements
Mat. Proctor
No. Ref. No.
1 95181011.0005
Field Test Data
Classification and Description
Dark Brown Sandy Clay
Test
No. Test Location
Laboratory
Test Method
ASTM D698
Optimum
Water
Max. Lab
Water
8
Content
Density
Content
Compaction
(%)
(pcf)
(%)
(%)
21.9
99.6
Min 25.9
Min 93
Probe Wet Water Water Dry Percent
Lift / Mat. Depth Density Content Content Density Compaction
Elev. No. (in) (pcf) (pcf) (%) (pcf) (%)
6" Grease Trap
84 See Attachment Test #1 F.G. 1 8 118.4 24.6 26.2 93.8 94
Retaining Wall
85 See Attachment Test #2
1 st Lift
1
8
119.9
24.7
25.9
95.2
96
86
2nd Lift
1
8
118.1
24.9
26.7
93.2
94
87
3rd Lift
1
8
120.4
25.1
26.3
95.3
96
88
4th Lift
1
8
119.5
25.7
27.4
93.8
94
89
5th Lift
1
8
119.8
26.3
28.1
93.5
94
Datum: Moisture Condition Std. Cut. M:2214 Std. Cut. D: 676
S/N: 31150 Make: Troxler Model: 3430 Last Cal. Date: 04/28/2017
Comments: Test and/or retest results on this report meet project requirements as noted above.
Contractor excavated down for density testing.
Services:
Terracon Rep.: Carlos Vela
Reported To: Doroteo w/Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Test Methods: ASTM D6938
Reviewed By: _
--Lto Tul
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cRoo07, 11-16-12, Rev.7 Page 1 of 1
FIELD DENSITY TESTING REPORT
Irerracon
Report Number: 95181011.0306
Service Date: 06/15/18 2501 E Loop 820 N
Report Date: 06/20/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
-
-1 5r
1k - fIM
_ � r'f �. � • : � � Fes' -'� �
1_•_ r
7 �r
est #1
r
r
Services:
Terracon Rep.: Carlos Vela
Reported To: Doroteo w/Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By: 2.
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
se0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0306
Service Date: 06/15/18
Report Date: 06/20/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0304
Service Date: 06/15/18 2501 E Loop 820 N
Report Date: 07/19/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
06/15/18 Sample Time: 0830
Sampled By:
Daniel Blocker
Mix ID: 9621
Weather Conditions:
Clear
Supplier: Argos
Accumulative Yards:
30 Batch Size (cy): 10
Batch Time: 0742
Plant:
123
Placement Method:
Pump
Truck No.: 5114
Ticket No.:
12329590
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Grid Line P7.5/16.7
Test
Result
Specification
Placement Location:
Garage, SOG, Grid Line P5 -P7/16-17
Slump (in):
6
5-7
and P7 -P9/16.3-17
Air Content (%):
5.0
3-6
Concrete Temp. (F):
90
50-95
Ambient Temp. (F):
88
Plastic Unit Wt. (pcf):
145.6
Yield (Cu. Yds.):
44.0
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
06/16/18
06/22/18 7 43,310
3,450 5
1 B 4.00
12.57
06/16/18
07/13/18 28 50,940
4,050 3
1 C 4.00
12.57
06/16/18
07/13/18 28 51,510
4,100 4
1 D 4.00
12.57
06/16/18
07/13/18 28 54,000
4,300 4
Average (28 days)
4,150
1 E
06/16/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0304
Service Date: 06/15/18
Report Date: 07/19/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0304
Service Date: 06/15/18 2501 E Loop 820 N
Report Date: 06/26/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
9621
Supplier:
Argos
Batch Time:
0742
Truck No.:
5114
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Plant: 123
Ticket No.: 12329590
Set Specimen Avg Diam.
Result
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
06/16/18
Initial Cure: Outside
7
Comments:
6
5.0
90
88
145.6
44.0
Specification
5-7
3-6
50-95
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
06/16/18
06/22/18
7
43,310
12.57
06/16/18
07/13/18
28
12.57
06/16/18
07/13/18
28
12.57
06/16/18
07/13/18
28
06/16/18
Hold
Final Cure: Moist Room
06/15/18 Sample Time: 0830
Daniel Blocker
Clear
30 Batch Size (cy): 10
Pump
Grid Line P7.5/16.7
Garage, SOG, Grid Line P5 -P7/16-17
and P7 -P9/16.3-17
Compressive
Strength Fracture Tested
(psi) Type By
3,450 5
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0304
Service Date: 06/15/18
Report Date: 06/26/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0302A
Service Date: 06/15/18
Report Date: 06/20/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On June, 15th, 2018, a representative of Terracon was present at the above referenced project to obtain # 1 set of 5
concrete test cylinders cast on June 14th, 2018. The samples were taken back to the Terracon laboratory where they were
cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0302.
Services:
Terracon Rep.: Daniel Blocker
Reported To:
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0302A
Service Date: 06/15/18
Report Date: 06/20/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600