HomeMy WebLinkAboutTerracon - 7/12/2018CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0350A
Service Date: 07/12/18
Report Date: 07/13/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 7, 12, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set(s) of 5 concrete
test cylinders cast on 7, 11, 2018. The samples were taken back to the Terracon laboratory where they were cured under
general accordance with ASTM C31 and will be reported under separate cover 95181011.0350
Services:
Terracon Rep.: Joshua Hernandez
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0350A
Service Date: 07/12/18
Report Date: 07/13/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0353
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/23/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9727
Supplier:
Argos
Batch Time:
1500 Plant:
Truck No.:
4027 Ticket No.: 12330577
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6 5-7
4.2 3-6
92
90
148.8
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Sample Date:
07/12/18 Sample Time: 1526
Sampled By:
Joshua Hernandez
Weather Conditions:
clear
Accumulative Yards:
10 Batch Size (cy): 10
Placement Method:
Direct Discharge
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
B.3/7
Placement Location:
First floor wall on the NE corner -
28
B/C 7
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
07/19/18
7
69,530
12.57
08/09/18
28
12.57
08/09/18
28
12.57
08/09/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
5,530 4
Comments: Concrete was schedule for 13:30. After getting to the job site. David w/ Manhatten came & told me concrete was pushed bacl
to 15:00
Samples Made By: Terracon
Services:
Terracon Rep.: Joshua Hernandez
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0353
Service Date: 07/12/18
Report Date: 07/23/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
POST -TENSION OBSERVATIONS REPORT
Report Number: 95181011.0352
Irerracon
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/23/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: PTO 1, PT02, PT03, PT04, PT05, PT06, PT07, PTO8, R02 -1G, R02 -1R, R02 -1Q, R02 -1K, R02 -1H
Locations/Items Observed: Pour 5 section North of pour strip
Test Method: Visual Observation
10:4201 A 9101 Z111111:144 ZIMIN 1161101
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Length and Shape
X
Column Tie Spacing &
Type
Bar and Cable Size
X
Proper Placement
X
Stirrup Spacing & Type
X
Bar and Cable Grade
X
Properly Tied
X
Cables Properly Wrapped
X
Rebar and Cables Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash & Debris Removed
X
Proper Supports
X
Lapped Splices
X
Number of Bars and
Cables
X
Proper Cover/Clearance
X
Proper Drape of Cables
X
Discrepancies/Comments:
(Fixed): Cable U108 and U039 switched at the live end
: Tendons missing in beam on 15 Line and Tendons U054B and U054C have been placed into the beam past the stairs. Calc. Elongations
will also not match due to the issue.
(Fixed): Extra "short" tendon added between U043 and U044 at the same starting grid line as U109
(Fixed): T043 live end was not properly attached to the forms.
(Fixed): P7/16 Cables were covered in dried concrete from previous pour.
T022A and T022B were cut and two new strands were continued.
T023A and T023B were not stressed prior to next area being poured.
Clearance issues on Girder along 18 Line
Services:
Terracon Rep.: Adam Wood
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 1 of 1
Distribution Page
Report Number: 95181011.0352
Service Date: 07/12/18
Report Date: 07/23/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0351
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/19/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9041
Supplier: Argos
Batch Time: 0810 Plant:
Truck No.: 4048 Ticket No.: 11029026
Field Test Data
Test Result Specification
Slump (in): 8 5-9
Air Content (%): 5.7 3-6
Concrete Temp. (F): 91
Ambient Temp. (F): 81
Plastic Unit Wt. (pcf): 149.3
Yield (Cu. Yds.):
Sample Date:
07/12/18 Sample Time: 0914
Sampled By:
Joshua Hernandez
Weather Conditions:
clear
Accumulative Yards:
36 Batch Size (cy): 9
Placement Method:
Direct Discharge
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
P5.1/15.7
Placement Location:
Paving for the garage on level 2
1
P7.3/P5.1 17/18, P4.1/P7.3 15.19/16
4.00
, P6 -P7 15/15.19
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date Date
Test
Load
Strength
Fracture Tested
No.
ID
(in)
(sq in)
Received Tested
(days)
(lbs)
(psi)
Type By
1
A
4.00
12.57
07/16/18
4
61,670
4,910
4
1
B
4.00
12.57
07/19/18
7
62,740
4,990
3
1
C
4.00
12.57
08/09/18
28
1
D
4.00
12.57
08/09/18
28
1
E
4.00
12.57
08/09/18
28
1
F
Hold
Initial
Cure: Outside
Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services:
Terracon Rep.: Joshua Hernandez
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0351
Service Date: 07/12/18
Report Date: 07/19/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0351A
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/19/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9041
Supplier:
Argos
Batch Time:
1100 Plant:
Truck No.:
7006 Ticket No.: 12330557
Field Test Data
Test
Result
Specification
Slump (in):
8
7.50 +/- 1.50
Air Content (%):
3.0
4.50 +/- 1.50
Concrete Temp. (F):
90
50-104
Ambient Temp. (F):
88
Sample Location:
Plastic Unit Wt. (pcf):
154.0
P/T Second Level Slab on deck
Yield (Cu. Yds.):
Sample Date:
07/12/18 Sample Time: 1130
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
131 Batch Size (cy): 5
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Gridline P5.2/15.3
Placement Location:
P/T Second Level Slab on deck
1
P4 -P7/17-18 and P4 -P7/15-16
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date Date
Test
Load
Strength
Fracture Tested
No.
ID
(in)
(sq in)
Received Tested
(days)
(lbs)
(psi)
Type By
1
A
4.00
12.57
07/16/18
4
52,740
4,200
5
1
B
4.00
12.57
07/19/18
7
59,610
4,740
2
1
C
4.00
12.57
08/09/18
28
1
D
4.00
12.57
08/09/18
28
1
E
4.00
12.57
08/09/18
28
1
F
Hold
Initial
Cure: Outside
Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0351A
Service Date: 07/12/18
Report Date: 07/19/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0351A
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9041
Supplier:
Argos
Batch Time:
1100 Plant:
Truck No.:
7006 Ticket No.: 12330557
Field Test Data
Test
Result
Specification
Slump (in):
8
7.50 +/- 1.50
Air Content (%):
3.0
4.50 +/- 1.50
Concrete Temp. (F):
90
50-104
Ambient Temp. (F):
88
Sample Location:
Plastic Unit Wt. (pcf):
154.0
P/T Second Level Slab on deck
Yield (Cu. Yds.):
Sample Date:
07/12/18 Sample Time: 1130
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
131 Batch Size (cy): 5
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Gridline P5.2/15.3
Placement Location:
P/T Second Level Slab on deck
07/16/18
P4 -P7/17-18 and P4 -P7/15-16
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date Date
Test Load
Strength Fracture Tested
No.
ID
(in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1
A
4.00
12.57
07/16/18
4 52,740
4,200 5
1
B
4.00
12.57
07/19/18
7
1
C
4.00
12.57
08/09/18
28
1
D
4.00
12.57
08/09/18
28
1
E
4.00
12.57
08/09/18
28
1
F
Hold
Initial
Cure: Outside
Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0351A
Service Date: 07/12/18
Report Date: 07/19/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0351
Service Date: 07/12/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9041
Supplier: Argos
Batch Time: 0810 Plant:
Truck No.: 4048 Ticket No.: 11029026
Field Test Data
Test Result Specification
Slump (in): 8 5-9
Air Content (%): 5.7 3-6
Concrete Temp. (F): 91
Ambient Temp. (F): 81
Plastic Unit Wt. (pcf): 149.3
Yield (Cu. Yds.):
Sample Date:
07/12/18 Sample Time: 0914
Sampled By:
Joshua Hernandez
Weather Conditions:
clear
Accumulative Yards:
36 Batch Size (cy): 9
Placement Method:
Direct Discharge
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
P5.1/15.7
Placement Location:
Paving for the garage on level 2
07/16/18
P7.3/P5.1 17/18, P4.1/P7.3 15.19/16
4,910 4
, P6 -P7 15/15.19
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date Date
Test Load
Strength Fracture Tested
No.
ID
(in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1
A
4.00
12.57
07/16/18
4 61,670
4,910 4
1
B
4.00
12.57
07/19/18
7
1
C
4.00
12.57
08/09/18
28
1
D
4.00
12.57
08/09/18
28
1
E
4.00
12.57
08/09/18
28
1
F
Hold
Initial
Cure: Outside
Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services:
Terracon Rep.: Joshua Hernandez
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0351
Service Date: 07/12/18
Report Date: 07/19/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600