HomeMy WebLinkAboutTerracon - 7/16/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0360
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 08/03/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
9727
Supplier:
Argos
Batch Time:
1500 Plant:
Truck No.:
5114 Ticket No.: 12330760
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result
Specification
6
5-7
4.4
3-6
91
50-95
98
4.00
147.6
20
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
20
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Sample Date:
07/16/18 Sample Time: 1500
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
7/7 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
20
Water Added After (gal):
0
Sample Location:
Parking Garage SOG P13/15.3
Placement Location:
Parking Garage SOG P13/15.3-17
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
07/23/18
7
54,090
12.57
08/13/18
28
12.57
08/13/18
28
12.57
08/13/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
4,300 5
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: 95181011.0360
Service Date: 07/16/18
Report Date: 08/03/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 08/14/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28 days Sample Date:
07/16/18 Sample Time: 1015
Sampled By:
Jeremy Washington
Mix ID: 9621
Weather Conditions:
clear
Supplier: Argos
Accumulative Yards:
20/100 Batch Size (cy): 10
Batch Time: 0930
Plant:
110 Placement Method:
Pump
Truck No.: 1714
Ticket No.:
11029181 Water Added Before (gal):
0
Water Added After (gal):
0
Field Test Data
Sample Location:
SOG Parking Garage -P12.5/17.3
Test
Result
Specification Placement Location:
SOG Parking Garage -P10-13/17-18
Slump (in):
7
5-7
Air Content (%):
3.7
3-6
Concrete Temp. (F):
89
50-95
Ambient Temp. (F):
87
Plastic Unit Wt. (pcf):
147.7
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
07/23/18 7 48,120
3,830 4
1 B 4.00
12.57
08/13/18 28 60,880
4,840 3
1 C 4.00
12.57
08/13/18 28 58,900
4,690 4
1 D 4.00
12.57
08/13/18 28 56,920
4,530 5
Average (28 days)
4,690
1 E 4.00
12.57
09/10/18 56
Initial Cure: Outside
Final Cure: Moist Room
Comments: * Average compressive strength of 28 day cylinders does not comply with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 08/14/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28 days Sample Date:
07/16/18 Sample Time: 1215
Sampled By:
Jeremy Washington
Mix ID: 9621
Weather Conditions:
clear
Supplier: Argos
Accumulative Yards:
100/100 Batch Size (cy): 10
Batch Time: 1127
Plant:
110 Placement Method:
Pump
Truck No.: 6282
Ticket No.:
11029191 Water Added Before (gal):
0
Water Added After (gal):
0
Field Test Data
Sample Location:
SOG Parking Garage -PI l/17.6
Test
Result
Specification Placement Location:
SOG Parking Garage -P10-13/17-18
Slump (in):
7
5-7
Air Content (%):
3.6
3-6
Concrete Temp. (F):
90
50-95
Ambient Temp. (F):
95
Plastic Unit Wt. (pcf):
146.6
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type By
2 A 4.00
12.57
07/23/18 7 44,530
3,540 2
2 B 4.00
12.57
08/13/18 28 59,160
4,710 2
2 C 4.00
12.57
08/13/18 28 60,910
4,850 4
2 D 4.00
12.57
08/13/18 28 60,870
4,840 5
Average (28 days)
4,800
2 E 4.00
12.57
09/10/18 56
Initial Cure: Outside
Final Cure: Moist Room
Comments: * Average compressive strength of 28 day cylinders does not comply with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Paae
Report Number: 95181011.0359
Service Date: 07/16/18
Report Date: 08/14/18 Revision 2 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
DEVIATION LOG
Report Date: 8/14/2018
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Deviation No. Report No. Service Service Date Description/Comments How Resolved Date Resolved Status
D000001
D000002
D000003
D000004
D000005
D000006
D000007
D000008
D000009
0047
Concrete Compressive
02/15/18
Slump does not comply, Set 1
Concrete met specified
Strength Test
strength
0212
Field Density Testing
04/26/18
Moisture content does not comply, Test
Retested
1
Comments: Low Moisture Content.
David with Manhattan was notified.
0212
Field Density Testing
04/26/18
Moisture content does not comply, Test
Retested
2
Comments: Low Moisture Content.
David with Manhattan was notified.
0212
Field Density Testing
04/26/18
Moisture content does not comply, Test
Retested
3
Comments: Low Moisture Content.
David with Manhattan was notified.
0212
Field Density Testing
04/26/18
Moisture content does not comply, Test
Retested
4
Comments: Low Moisture Content.
David with Manhattan was notified.
0212
Field Density Testing
04/26/18
Moisture content does not comply, Test
Retested
5
Comments: Low Moisture Content.
David with Manhattan was notified.
0169
Concrete Compressive
04/11/18
Average compressive strength does not
Strength Test
comply, Set 1 Age 28
0232
Concrete Compressive
05/08/18
Slump does not comply, Set 1
Concrete met strength
Strength Test
0249
Field Density Testing
05/16/18
Moisture content does not comply, Test
Retested
65
Page 1 of 4
02/22/18 Closed
04/27/18 Closed
04/27/18
04/27/18
04/27/18
Closed
Closed
Closed
04/27/18 Closed
Open
06/05/18 Closed
05/16/18 Closed
DEVIATION LOG
Report Date: 8/14/2018
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Deviation No. Report No. Service Service Date Description/Comments How Resolved Date Resolved Status
D000010
D000011
D000012
D000013
D000014
D000015
D000016
D000017
D000018
D000019
D000020
0271
0271
0271
0273
0273
0169
0332
Field Density Testing
Field Density Testing
Field Density Testing
Field Density Testing
Field Density Testing
Concrete Compressive
Strength Test
Post -Tension Stressing
0335 Concrete Compressive
Strength Test
0342 Concrete Compressive
Strength Test
0342
0342
Concrete Compressive
Strength Test
Concrete Compressive
Strength Test
05/30/18
Percent compaction does not comply,
Retested Same Day
Closed
Test 1
Closed
05/30/18
Percent compaction does not comply,
Retested Same Day
Closed
Test 2
Open
05/30/18
Percent compaction does not comply,
Retested Same Day
Test 3
05/31/18
Percent compaction does not comply,
Retested Same Day
Test 69
05/31/18
Percent compaction does not comply,
Retested Same Day
Test 71
04/11/18
Average compressive strength does not
comply, Set 1 Age 56
07/02/18
Post -Tension Stressing
Pending
Comments: David Saiter w/Manhattan
was notified and given a copy of the
field report.
07/03/18
Slump does not comply, Set 1
Pending compressive
Comments: excessive slump. Contractor
strength at 28 days.
was notified
07/07/18
Air content does not comply, Set 2
Comments: Pending 28 compressive
strength results
07/07/18
Air content does not comply, Set 3
Comments: Pending 28 compressive
strength results
07/07/18
Air content does not comply, Set 4
Comments: Pending 28 compressive
strength results
Page 2 of 4
05/30/18
Closed
05/30/18
Closed
05/30/18
Closed
05/31/18
Closed
05/31/18
Closed
Open
Open
Open
DEVIATION LOG
Report Date: 8/14/2018
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Deviation No. Report No. Service Service Date Description/Comments How Resolved Date Resolved Status
D000021
D000022
D000023
D000024
D000025
D000026
D000027
0342 Concrete Compressive
Strength Test
0344 Concrete Compressive
Strength Test
0359
0359
0362
0342
0342
Concrete Compressive
Strength Test
Concrete Compressive
Strength Test
Concrete Compressive
Strength Test
Concrete Compressive
Strength Test
Concrete Compressive
Strength Test
D000028 0387 Field Density Testing
07/07/18
Slump does not comply, Set 1
Comments: Pending 28 compressive
strength results
07/09/18
Slump does not comply, Set 1
Pending 28 day
Comments: 28 day compressive strength
compressive strength
obtained the required 4500 psi.
result
07/16/18
Slump does not comply, Set 1
Resolved at 28 day
compressive strength
results
07/16/18
Slump does not comply, Set 2
Resolved at 28 day
compressive strength
results
07/17/18
Slump does not comply, Set 1
Resolved once
Comments: Manhattan was notified of
compressive strength
excessive slump prior to placement.
of 5000 psi is obtained
07/07/18
Average compressive strength does not
comply, Set 2 Age 28
Comments: Low 28 day compressive
strength results
07/07/18
Average compressive strength does not
comply, Set 3 Age 28
Comments: Low 28 day compressive
strength results
07/30/18
Moisture content does not comply, Test
109
Comments: David Saiter was notified by
Terracon that moisture was low. Will
retest after area is reworked.
Page 3 of 4
08/06/18
Open
Closed
Open
Open
Open
Open
Open
Open
DEVIATION LOG
Report Date: 8/14/2018
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Deviation No. Report No.
Service
Service Date
Description/Comments
How Resolved Date Resolved
Status
D000029 0387
Field Density Testing
07/30/18
Moisture content does not comply, Test
Open
110
Comments: David Saiter was notified by
Terracon that moisture was low. Will
retest after area is reworked.
D000030 0396
Concrete Compressive
08/06/18
Slump does not comply, Set 1
Deviation will be
Open
Strength Test
Comments: Contractor was notified of
resolved once test
excessive slump pior to placement.
cylinders reach the 28
day design strength of
7000 psi.
D000031 0359
Concrete Compressive
07/16/18
Average compressive strength does not
Will review at 28 day
Open
Strength Test
comply, Set 1 Age 28
compressive strength
results
D000032 0359
Concrete Compressive
07/16/18
Average compressive strength does not
Will review at 28 day
Open
Strength Test
comply, Set 2 Age 28
compressive strength
results
Page 4 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier: Argos
Batch Time: 1000 Plant: 110
Truck No.: 1714 Ticket No.: 11029181
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
7
5-7
3.7
3-6
89
50-95
87
4.00
147.7
0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Sample Date:
07/16/18 Sample Time: 1000
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
20/100 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
SOG Parking Garage -P12.5/17.3
Placement Location:
SOG Parking Garage -P10-13/17-18
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
07/23/18
7
48,120
12.57
08/13/18
28
12.57
08/13/18
28
12.57
08/13/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
3,830 4
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier: Argos
Batch Time: 1200 Plant: 110
Truck No.: 6282 Ticket No.: 11029191
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
7
5-7
3.6
3-6
90
50-95
95
4.00
146.6
0
Laboratory Test Data
Set Specimen Avg Diam.
No. ID
(in)
2 A
4.00
2 B
4.00
2 C
4.00
2 D
4.00
2 E
0
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Sample Date:
07/16/18 Sample Time: 1000
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
100/100 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
SOG Parking Garage -PI l/17.6
Placement Location:
SOG Parking Garage -P10-13/17-18
Age at Maximum
Area
Date Date
Test
Load
(sq in)
Received Tested
(days)
(lbs)
12.57
07/23/18
7
44,530
12.57
08/13/18
28
12.57
08/13/18
28
12.57
08/13/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
3,540 2
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: 95181011.0359
Service Date: 07/16/18
Report Date: 08/03/18 Revision 1 - 7 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 07/17/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier: Argos
Batch Time: 1000 Plant:
Truck No.: 1714 Ticket No.: 11029181
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
7 5-7
3.7 3-6
89
87
147.7
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Sample Date:
07/16/18 Sample Time: 1000
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
20/100 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
SOG-P12.5/17.3
Placement Location:
SOG-P10-13/17-18
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
07/23/18
7
12.57
08/13/18
28
12.57
08/13/18
28
12.57
08/13/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0359
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 07/17/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 9621
Supplier: Argos
Batch Time: 1200 Plant:
Truck No.: 6282 Ticket No.: 11029191
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
7 5-7
3.6 3-6
90
95
146.6
No. ID
(in)
2 A
4.00
2 B
4.00
2 C
4.00
2 D
4.00
2 E
0
Initial Cure: Outside
0
Comments:
Sample Date:
07/16/18 Sample Time: 1000
Sampled By:
Jeremy Washington
Weather Conditions:
clear
Accumulative Yards:
100/100 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
SOG-P11/17.6
Placement Location:
SOG-P10-13/17-18
Age at Maximum
Area
Date Date
Test Load
(sq in)
Received Tested
(days) (lbs)
12.57
07/23/18
7
12.57
08/13/18
28
12.57
08/13/18
28
12.57
08/13/18
28
Hold
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
John, Tupa
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: 95181011.0359
Service Date: 07/16/18
Report Date: 07/17/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
POST -TENSION STRESSING REPORT
Report Number: 95181011.0358
Irerracon
Service Date: 07/16/18 2501 E Loop 820 N
Report Date: 07/20/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension
Stressing Operations on Level 2, Pour 5, North of Pour Strip. Please note that tendons highlighted in yellow are outside the
tolerance of +/-7%. See attached sheets for recorded data.
Services:
Terracon Rep.: Adam Wood
Reported To:
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
MEASURED ELONGATION
TENDON
MARK
CALC
ELONG
(in.)
End 1 End 2
(in.) (in.)
-7%
Total
Recorded
(in.)
Restress
(psi or
7% kips)
TOTAL
(in.)
% (+/-)
REMARKS
U019A
4.625
3.125
4.30
3.13
4.95
3.125
-32%
See Comments
U019B
4.625
3
4.30
3.00
4.95
3
-35%
See Comments
U101
2.375
2.375
2.21
2.38
2.54
2.375
0%
U020
4.625
3.25
4.30
3.25
4.95
3.25
-30%
See Comments
U021A
4.625
3.125
4.30
3.13
4.95
3.125
-32%
See Comments
U021B
4.625
3.375
4.30
3.38
4.95
3.375
-27%
See Comments
U022A
4.625
4.30
#VALUE!
4.95
#VALUE!
#VALUE!
See Comments
U022B
4.625
4.30
#VALUE!
4.95
#VALUE!
#VALUE!
See Comments
U102
2.375
2.5
2.21
2.50
2.54
2.5
5%
U023A
4.625
8.875
4.30
8.88
4.95
8.875
92%
See Comments
U023B
4.625
9.125
4.30
9.13
4.95
9.125
97%
See Comments
U024
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U103
2.375
2.375
2.21
2.38
2.54
2.375
0%
U025A
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U025B
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U026A
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U026B
4.625
3.125
4.30
3.13
4.95
3.125
-32%
U027A
4.625
3.75
4.30
3.75
4.95
3.75
-19%
U027B
4.625
3.125
4.30
3.13
4.95
3.125
-32%
U104
2.375
2.625
2.21
2.63
2.54
2.625
11%
U028
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U029A
4.625
3.125
4.30
3.13
4.95
3.125
-32%
U029B
4.625
3.125
4.30
3.13
4.95
3.125
-32%
U105
2.375
2.625
2.21
2.63
2.54
2.625
11%
U030A
4.625
3
4.30
3.00
4.95
3
-35%
U030B
4.625
3
4.30
3.00
4.95
3
-35%
U031A
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U031B
4.625
3.5
4.30
3.50
4.95
3.5
-24%
U032
4.625
3.625
4.30
3.63
4.95
3.625
-22%
U106
2.375
2.5
2.21
2.50
2.54
2.5
5%
U033A
4.625
3.25
4.30
3.25
4.95
3.25
-30%
U033B
4.625
3.375
4.30
3.38
4.95
3.375
-27%
U034
4.625
3.125
4.30
3.13
4.95
3.125
-32%
COMMENTS: Tendons U019 thru U034 will not match calculation elongation due to the pour area changing. U023A &
U023B were previously unstressed cables. U022A & U022B were the replaced strands after the concrete blowout.
SHEETTITLE:
ELONGATION RECORDS
Jack #1: MRE607
JOB/LOCATION: Grapevine
Main Phase I
Jack#2:
CONTRACTOR.
Jack #1 PSI: 7000
LEVEL/POUR: Level 2, Pour 5, North of Pour Strip
Jack #2 PSI:
DATE: 7/16/18
1 STRESS BY: K & A Rebar
VERIFIED BY: Adam Wood
PAGE 1 OF 5
MEASURED ELONGATION
TENDON
MARK
CALC
ELONG
(in.)
End 1 End 2
(in.) (in.)
-7%
Total
Recorded
(in.)
Restress
(psi or
7% kips)
TOTAL
(in.)
% (+/-)
REMARKS
U035A
4.658
4.375
4.33
4.38
4.98
4.375
-6%
U035B
4.625
4.5
4.30
4.50
4.95
4.5
-3%
U036A
4.625
4.875
4.30
4.88
4.95
4.875
5%
U036B
4.625
4.75
4.30
4.75
4.95
4.75
3%
U107
2.375
2.5
2.21
2.50
2.54
2.5
5%
U037
4.625
4.75
4.30
4.75
4.95
4.75
3%
U038A
4.625
4.875
4.30
4.88
4.95
4.875
5%
U038B
4.625
4.875
4.30
4.88
4.95
4.875
5%
U039
4.625
4.75
4.30
4.75
4.95
4.75
3%
U108
2.375
2.5
2.21
2.50
2.54
2.5
5%
U040A
4.625
4.875
4.30
4.88
4.95
4.875
5%
U040B
4.625
4.75
4.30
4.75
4.95
4.75
3%
U041
4.625
4.75
4.30
4.75
4.95
4.75
3%
U042A
4.625
4.75
4.30
4.75
4.95
4.75
3%
U042B
4.625
4.75
4.30
4.75
4.95
4.75
3%
U109
2.375
2.375
2.21
2.38
2.54
2.375
0%
U043
4.625
4.625
4.30
4.63
4.95
4.625
0%
U044A
4.625
4.875
4.30
4.88
4.95
4.875
5%
U044B
4.625
4.75
4.30
4.75
4.95
4.75
3%
U045
4.625
4.875
4.30
4.88
4.95
4.875
5%
U110
2.375
2.5
2.21
2.50
2.54
2.5
5%
U046A
4.625
4.625
4.30
4.63
4.95
4.625
0%
U046B
4.625
4.5
4.30
4.50
4.95
4.5
-3%
U047
4.625
4.625
4.30
4.63
4.95
4.625
0%
U111
2.375
2.5
2.21
2.50
2.54
2.5
5%
U048A
4.625
5
4.30
5.00
4.95
5
8%
U048B
4.625
4.5
4.30
4.50
4.95
4.5
-3%
U052A
1.25
1.5
1.16
1.50
1.34
1.5
20%
U052B
1.25
1.375
1.16
1.38
1.34
1.375
10%
U052C
1.25
1.625
1.16
1.63
1.34
1.625
30%
U053A
1.25
1.375
1.16
1.38
1.34
1.375
10%
U053B
1.25
1.625
1.16
1.63
1.34
1.625
30%
U054A
1.25
1.875
1.16
1.88
1.34
1.875
50%
U054B
1.25
1.875
1.16
1.88
1.34
1.875
50%
See Comments
U054C
1.25
1.875
1.16
1.88
1.34
1.875
50%
See Comments
COMMENTS: Strands U054B & U54C will not match due to the original placement changing.
SHEETTITLE:
ELONGATION RECORDS
Jack #1: MRE607
JOB/LOCATION: Grapevine Main Phase I
Jack#2:
CONTRACTOR:
Jack #1 PSI: 7000
LEVEL/POUR: Level 2, Pour 5, North of Pour Strip
Jack #2 PSI:
DATE: 7/16/18
1 STRESS BY: K & A Rebar
IVERIFIED BY: Adam Wood
PAGE 2 OF 5
MEASURED ELONGATION
CALC
TENDON ELONG
MARK (in.)
End 1 End 2
(in.) (in.)
-7%
Total
Recorded
(in.)
Restress
(psi or
7% kips)
TOTAL
(in.)
% (+/-)
REMARKS
T037 4.875
4.5
4.53
4.50
5.22
4.5
-8%
T038 4.875
4.75
4.53
4.75
5.22
4.75
-3%
T039 4.875
5
4.53
5.00
5.22
5
3%
T040 4.875
4.75
4.53
4.75
5.22
4.75
-3%
T041 4.875
4.625
4.53
4.63
5.22
4.625
-5%
T042 4.875
5
4.53
5.00
5.22
5
3%
T043 4.875
4.75
4.53
4.75
5.22
4.75
-3%
M012A 4.5
4.375
4.19
4.38
4.82
4.375
-3%
See Comments
M012B 4.5
43/8
4.19
4.38
4.82
4.375
-3%
M012C 4.5
4.5
4.19
4.50
4.82
4.5
0%
M012D 4.5
4.5
4.19
4.50
4.82
4.5
0%
M012E 4.5
4.375
4.19
4.38
4.82
4.375
-3%
M012F 4.5
4.5
4.19
4.50
4.82
4.5
0%
M012G 4.5
4.625
4.19
4.63
4.82
4.625
3%
M012H 4.5
4.75
4.19
4.75
4.82
4.75
6%
M0121 4.5
4.5
4.19
4.50
4.82
4.5
0%
M012J 4.5
5
4.19
5.00
4.82
5
11%
M012K 4.5
5
4.19
5.00
4.82
5
11%
M012L 4.5
5
4.19
5.00
4.82
5
11%
M012M 4.5
5
4.19
5.00
4.82
5
11%
M013A 4.5
4.625
4.19
4.63
4.82
4.625
3%
See Comments
M013B 4.5
4.5
4.19
4.50
4.82
4.5
0%
M013C 4.5
4.5
4.19
4.50
4.82
4.5
0%
M013D 4.5
4.5
4.19
4.50
4.82
4.5
0%
M013E 4.5
5
4.19
5.00
4.82
5
11%
M013F 4.5
4.75
4.19
4.75
4.82
4.75
6%
M013G 4.5
4.75
4.19
4.75
4.82
4.75
6%
M013H 4.5
4.625
4.19
4.63
4.82
4.625
3%
M0131 4.5
4.625
4.19
4.63
4.82
4.625
3%
M013J 4.5
4.875
4.19
4.88
4.82
4.875
8%
M013K 4.5
4.625
4.19
4.63
4.82
4.625
3%
M013L 4.5
4.75
4.19
4.75
4.82
4.75
6%
M013M 4.5
4.25
4.19
4.25
4.82
4.25
-6%
SEE COMMENTS: M012 & M013 were measured right to left, top to bottom.
SHEETTITLE:
ELONGATION RECORDS
Jack #1: MRE607
JOB/LOCATION: Grapevine Main Phase I
Jack#2:
CONTRACTOR:
Jack #1 PSI: 7000
LEVEL/POUR: Level 2, Pour 5, North of Pour Strip
Jack #2 PSI:
DATE: 7/16/18
1 STRESS BY: K & A Rebar
IVERIFIED BY: Adam Wood
PAGE 3 OF 5
MEASURED ELONGATION
TENDON
MARK
CALC
ELONG
(in.)
End 1 End 2
(in.) (in.)
-7%
Total
Recorded
(in.)
Restress
(psi or
7% kips)
TOTAL
(in.)
% (+/-)
REMARKS
M102A
4.625
3.25
4.30
3.25
4.95
3.25
-30%
See Comments
M102B
4.625
3
4.30
3.00
4.95
3
-35%
See Comments
M102C
4.625
3.25
4.30
3.25
4.95
3.25
-30%
See Comments
M103D
4.625
3.75
4.30
3.75
4.95
3.75
-19%
See Comments
M102E
4.625
3.25
4.30
3.25
4.95
3.25
-30%
See Comments
M102F
4.625
3.375
4.30
3.38
4.95
3.375
-27%
See Comments
M102G
4.625
3.125
4.30
3.13
4.95
3.125
-32%
See Comments
T044
4.875
4.875
4.88
4.875
0%
T045
4.875
5
4.53
5.00
5.22
5
3%
T046
4.875
5
4.53
5.00
5.22
5
3%
T047
4.875
4.375
4.53
4.38
5.22
4.375
-10%
T048
4.875
4.25
4.53
4.25
5.22
4.25
-13%
T049
4.875
4.25
4.53
4.25
5.22
4.25
-13%
T050
4.875
5.5
4.53
5.50
5.22
5.5
13%
T051
4.875
5.125
4.53
5.13
5.22
5.125
5%
T052
4.875
5.25
4.53
5.25
5.22
5.25
8%
T053
4
4.25
3.72
4.25
4.28
4.25
6%
M017A
3.875
4
3.60
4.00
4.15
4
3%
M017B
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M017C
3.875
3.875
3.60
3.88
4.15
3.875
0%
M017D
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M017E
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M017F
3.875
3.875
3.60
3.88
4.15
3.875
0%
M017G
3.875
4
3.60
4.00
4.15
4
3%
M017H
3.875
3.875
3.60
3.88
4.15
3.875
0%
M0171
3.875
4.125
3.60
4.13
4.15
4.125
6%
M018A
3.875
4
3.60
4.00
4.15
4
3%
M018B
3.875
3.875
3.60
3.88
4.15
3.875
0%
M018C
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M018D
3.875
3.875
3.60
3.88
4.15
3.875
0%
M018E
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M018F
3.875
4.125
3.60
4.13
4.15
4.125
6%
M018G
3.875
3.5
3.60
3.50
4.15
3.5
-10%
M018H
3.875
3.75
3.60
3.75
4.15
3.75
-3%
M0181
3.875
4
3.60
4.00
4.15
4
3%
M102 was measured right to left, top to bottom. M102 will not match calculation elongation because of the pour area
change. M017 & M018 were measured right to left, top to bottom.
SHEETTITLE:
ELONGATION RECORDS
Jack #1: MRE607
JOB/LOCATION: Grapevine
Main Phase I
Jack#2:
CONTRACTOR.
Jack #1 PSI: 7000
LEVEL/POUR: Level 2, Pour 5, North of Pour Strip
Jack #2 PSI:
DATE: 7/16/18
1 STRESS BY: K & A Rebar
VERIFIED BY: Adam Wood
PAGE 4 OF 5
MEASURED ELONGATION
TENDON
MARK
CALC
ELONG
(in.)
End 1 End 2
(in.) (in.)
-7%
Total
Recorded
(in.)
Restress
(psi or
7% kips)
TOTAL
(in.)
% (+/-)
REMARKS
M019A
4.5
5
4.19
5.00
4.82
5
11%
M019B
4.5
4.875
4.19
4.88
4.82
4.875
8%
M019C
4.5
4.875
4.19
4.88
4.82
4.875
8%
M019D
4.5
4.5
4.19
4.50
4.82
4.5
0%
M019E
4.5
5
4.19
5.00
4.82
5
11%
M019F
4.5
4.75
4.19
4.75
4.82
4.75
6%
M019G
4.5
4.875
4.19
4.88
4.82
4.875
8%
M019H
4.5
4.875
4.19
4.88
4.82
4.875
8%
M0191
4.5
47/8
4.19
4.88
4.82
4.875
8%
M008A
13
14 0.125
12.09
14.13
13.91
14.125
9%
M008B
13
13.875
12.09
13.88
13.91
13.875
7%
M008C
13
13.375
12.09
13.38
13.91
13.375
3%
M008D
13
13.5
12.09
13.50
13.91
13.5
4%
M008E
13
13.5
12.09
13.50
13.91
13.5
4%
M008F
13
13.875
12.09
13.88
13.91
13.875
7%
M008G
13
14
12.09
14.00
13.91
14
8%
M008H
13
14.25
12.09
14.25
13.91
14.25
10%
M0081
13
14.125
12.09
14.13
13.91
14.125
9%
M008J
13
14.25
12.09
14.25
13.91
14.25
10%
M009A
3.5
3.5
3.26
3.50
3.75
3.5
0%
M009B
3.5
3.875
3.26
3.88
3.75
3.875
11%
M009C
3.5
3.875
3.26
3.88
3.75
3.875
11%
M009D
3.5
3.625
3.26
3.63
3.75
3.625
4%
M009E
3.5
3.5
3.26
3.50
3.75
3.5
0%
M009F
3.5
3.375
3.26
3.38
3.75
3.375
-4%
M009G
3.5
3.75
3.26
3.75
3.75
3.75
7%
M032A
4.875
4.875
4.53
4.88
5.22
4.875
0%
M032B
4.875
4.875
4.53
4.88
5.22
4.875
0%
M032C
4.875
4.75
4.53
4.75
5.22
4.75
-3%
M032D
4.875
5.125
4.53
5.13
5.22
5.125
5%
M032E
4.875
4.875
4.53
4.88
5.22
4.875
0%
M032F
4.875
4.875
4.53
4.88
5.22
4.875
0%
M010
6.25
6.25
5.81
6.25
6.69
6.25
0%
M019 was measured left to right, top to bottom. West side M008 & M009 were measured right to left, top to bottom.
East side M008 & M0032 were measured left to right, top to bottom.
SHEETTITLE:
ELONGATION RECORDS
Jack #1: MRE607
JOB/LOCATION: Grapevine
Main Phase I
Jack#2:
CONTRACTOR.
Jack #1 PSI: 7000
LEVEL/POUR: Level 2, Pour 5, North of Pour Strip
Jack #2 PSI:
DATE: 7/16/18
1 STRESS BY: K & A Rebar
VERIFIED BY: Adam Wood
PAGE 5 OF 5
Distribution Page
Report Number: 95181011.0358
Service Date: 07/16/18
Report Date: 07/20/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600