Loading...
HomeMy WebLinkAboutTerracon - 8/01/2018FIELD DENSITY TEST REPORT Irerracon Report Number: 95181011.0392 Service Date: 08/01/18 2501 E Loop 820 N Report Date: 08/03/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Lab Test Data Project Requirements Mat. Proctor No. Ref. No. 1 95181011.0235 Field Test Data Classification and Description Brown Sandy Clay with Trace of LSF Test No. Test Location Hotel Ext. GB/Basement Wall Laboratory Test Method ASTM D698 Optimum Water Max. Lab Water Content Density Content Compaction (%) (pcf) (%) (%) 15.5 113.3 +3 >93 Probe Wet Water Water Dry Percent Lift / Mat. Depth Density Content Content Density Compaction Elev. No. (in) (pcf) (pcf) (%) (pcf) (%) 111 C.5/12.5 8' 1 10 129.1 20.5 18.9 108.6 96 112 C.5/13.5 8' 1 10 126.0 21.0 20.0 105.0 93 Datum: S/N: Make: Model: Last Cal. Date: Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Terracon Rep.: Adam Wood Reported To: David with Manhattan Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM D6938 Reviewed By: _ --Lto Tul Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cRoo07, 11-16-12, Rev.7 Page 1 of 1 Distribution Page Report Number: 95181011.0392 Service Date: 08/01/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 POST -TENSION STRESSING REPORT Report Number: 95181011.0391 Irerracon Service Date: 08/01/18 2501 E Loop 820 N Report Date: 08/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension Stressing Operations on Level 2, Pour 5 (P7.5 -P10.8/17-18). Please note that tendons highlighted in yellow are outside the tolerance of +/-7%. See attached sheets for recorded data. See attached sheets for recorded data. Services: Terracon Rep.: Adam Wood Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION TENDON MARK CALC ELONG (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS T054 4.875 4.75 4.53 4.75 5.22 4.75 -3% T055 4.875 4.875 4.53 4.88 5.22 4.875 0% T056 4.875 5 4.53 5.00 5.22 5 3% T057 4.875 4.875 4.53 4.88 5.22 4.875 0% T058 4.875 4.875 4.53 4.88 5.22 4.875 0% T059 4.875 4.875 4.53 4.88 5.22 4.875 0% T060 4.875 4.875 4.53 4.88 5.22 4.875 0% T061 4.875 4.75 4.53 4.75 5.22 4.75 -3% T062 4.875 4.875 4.53 4.88 5.22 4.875 0% T063 4.875 5 4.53 5.00 5.22 5 3% U055A 4.625 4.5 4.30 4.50 4.95 4.5 -3% U055B 4.625 4.5 4.30 4.50 4.95 4.5 -3% U056 4.625 4.75 4.30 4.75 4.95 4.75 3% U057A 4.625 4.375 4.30 4.38 4.95 4.375 -5% U057B 4.625 4.5 4.30 4.50 4.95 4.5 -3% U058A 4.625 4.625 4.30 4.63 4.95 4.625 0% U058B 4.625 4.25 4.30 4.25 4.95 4.25 -8% See Below U059A 4.625 4.5 4.30 4.50 4.95 4.5 -3% U059B 4.625 4.75 4.30 4.75 4.95 4.75 3% U060 4.625 4.5 4.30 4.50 4.95 4.5 -3% U061A 4.625 4.875 4.30 4.88 4.95 4.875 5% See Below U061B 4.625 4.75 4.30 4.75 4.95 4.75 3% See Below U062A 4.625 4.5 4.30 4.50 4.95 4.5 -3% See Below U062B 4.625 4.75 4.30 4.75 4.95 4.75 3% See Below U063A 4.625 4.625 4.30 4.63 4.95 4.625 0% See Below U063B 4.625 5 4.30 5.00 4.95 5 8% See Below U064 4.625 5 4.30 5.00 4.95 5 8% See Below U065A 4.625 4.625 4.30 4.63 4.95 4.625 0% U065B 4.625 4.75 4.30 4.75 4.95 4.75 3% U066A 4.625 4.25 4.30 4.25 4.95 4.25 -8% See Below U066B 4.625 4.75 4.30 4.75 4.95 4.75 3% See Below U067A 4.625 4.875 4.30 4.88 4.95 4.875 5% See Below U067B 4.625 4.75 4.30 4.75 4.95 4.75 3% See Below U068 4.625 4.25 4.30 4.25 4.95 4.25 -8% See Below Tendons U05813, U061A, U06113, U062A, U0626, U063A, U06313, U064, U066A, U06613, U067A, U067B & U068 had blow out several minutes (Approximately 20) after stressing was complete. SHEETTITLE: ELONGATION RECORDS Jack #1:MR607 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Jack #1 PSI: 7000 LEVEL/POUR: Level 2, Pour 5 (P7.5 -P10.8/17-18) Jack #2 PSI: DATE: 8/1/18 1 STRESS BY: K & A Rebar IVERIFIEDBY: Adam Wood PAGE 1 OF 4 MEASURED ELONGATION CALC TENDON ELONG MARK (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) 7% Restress (psi or kips) TOTAL (in.) % (+/-) REMARKS U069A 4.625 4.625 4.30 4.63 4.95 4.625 0% U069B 4.625 4.625 4.30 4.63 4.95 4.625 0% U070 4.625 4.375 4.30 4.38 4.95 4.375 -5% U112 2.375 2.25 2.21 2.25 2.54 2.25 -5% U113 2.375 2.5 2.21 2.50 2.54 2.5 5% U114 2.375 2.625 2.21 2.63 2.54 2.625 11% U115 2.375 2.5 2.21 2.50 2.54 2.5 5% U116 2.375 2.625 2.21 2.63 2.54 2.625 11% U117 2.375 2.25 2.21 2.25 2.54 2.25 -5% SHEETTITLE: ELONGATION RECORDS Jack #1:MR607 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Jack #1 PSI: 7000 LEVEL/POUR: Level 2, Pour 5 (137.5-1310.8/17-18) Jack #2 PSI: DATE: 8/1/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 2 OF 4 MEASURED ELONGATION TENDON MARK CALC ELONG (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS M014A 4.5 4.5 4.19 4.50 4.82 4.5 0% M014B 4.5 4.375 4.19 4.38 4.82 4.375 -3% M014C 4.5 4.25 4.19 4.25 4.82 4.25 -6% M014D 4.5 4.5 4.19 4.50 4.82 4.5 0% M014E 4.5 4.375 4.19 4.38 4.82 4.375 -3% M014F 4.5 4.125 4.19 4.13 4.82 4.125 -8% M014G 4.5 4.5 4.19 4.50 4.82 4.5 0% M014H 4.5 5 4.19 5.00 4.82 5 11% M0141 4.5 4.625 4.19 4.63 4.82 4.625 3% M014J 4.5 4.875 4.19 4.88 4.82 4.875 8% M014K 4.5 4.625 4.19 4.63 4.82 4.625 3% M014L 4.5 4.75 4.19 4.75 4.82 4.75 6% M014M 4.5 4.875 4.19 4.88 4.82 4.875 8% M015A 4.5 4.75 4.19 4.75 4.82 4.75 6% M015B 4.5 4.25 4.19 4.25 4.82 4.25 -6% M015C 4.5 4.75 4.19 4.75 4.82 4.75 6% M015D 4.5 4.5 4.19 4.50 4.82 4.5 0% M015E 4.5 4.375 4.19 4.38 4.82 4.375 -3% M015F 4.5 4.625 4.19 4.63 4.82 4.625 3% M015G 4.5 4.875 4.19 4.88 4.82 4.875 8% M015H 4.5 4.875 4.19 4.88 4.82 4.875 8% M0151 4.5 4.75 4.19 4.75 4.82 4.75 6% M015J 4.5 4.625 4.19 4.63 4.82 4.625 3% M015K 4.5 4.25 4.19 4.25 4.82 4.25 -6% M015L 4.5 4.625 4.19 4.63 4.82 4.625 3% M015M 4.5 4.75 4.19 4.75 4.82 4.75 6% M016A 4.5 4.625 4.19 4.63 4.82 4.625 3% M016B 4.5 4.375 4.19 4.38 4.82 4.375 -3% M016C 4.5 4.75 4.19 4.75 4.82 4.75 6% M016D 4.5 4.875 4.19 4.88 4.82 4.875 8% M016E 4.5 4.5 4.19 4.50 4.82 4.5 0% M016F 4.5 4.75 4.19 4.75 4.82 4.75 6% M016G 4.5 4.875 4.19 4.88 4.82 4.875 8% M016H 4.5 4.875 4.19 4.88 4.82 4.875 8% M0161 4.5 4.875 4.19 4.88 4.82 4.875 8% Beams measured from right to left, top to bottom on East side. SHEETTITLE: ELONGATION RECORDS Jack #1:MR607 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Jack #1 PSI: 7000 LEVEL/POUR: Level 2, Pour 5 (P7.5 -P10.8/17-18) Jack #2 PSI: DATE: 8/1/18 1 STRESS BY: K & A Rebar VERIFIED BY: Adam Wood PAGE 3 OF 4 MEASURED ELONGATION CALC TENDON ELONG MARK (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS M016J 4.5 4.75 4.19 4.75 4.82 4.75 6% M016K 4.5 4.625 4.19 4.63 4.82 4.625 3% M016L 4.5 4.5 4.19 4.50 4.82 4.5 0% M016M 4.5 4.5 4.19 4.50 4.82 4.5 0% M 107A 4.625 4.5 4.30 4.50 4.95 4.5 -3% M107B 4.625 4.625 4.30 4.63 4.95 4.625 0% M 107C 4.625 4.75 4.30 4.75 4.95 4.75 3% M 107D 4.625 4.5 4.30 4.50 4.95 4.5 -3% M107E 4.625 43/4 4.30 4.75 4.95 4.75 3% M 107F 4.625 4.875 4.30 4.88 4.95 4.875 5% M107G 4.625 4.5 4.30 4.50 4.95 4.5 -3% M107 measured right to left, top to bottom on South end. SHEETTITLE: ELONGATION RECORDS Jack #1:MR607 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR. Jack #1 PSI: 7000 LEVEL/POUR: Level 2, Pour 5 (137.5-1310.8/17-18) Jack #2 PSI: DATE: 8/1/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 4 OF 4 Distribution Page Report Number: 95181011.0391 Service Date: 08/01/18 Report Date: 08/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0390A Service Date: 08/01/18 Report Date: 08/03/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On August 1, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set(s) of 5 concrete test cylinders cast on July 31, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0390 Services: Terracon Rep.: Adam Wood Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0390A Service Date: 08/01/18 Report Date: 08/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600