Loading...
HomeMy WebLinkAboutTerracon - 6/28/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0328 Service Date: 06/28/18 2501 E Loop 820 N Report Date: 08/03/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Sample Date: 06/28/18 Sample Time: 1530 Sampled By: Jeremy Washington Mix ID: 9727 Weather Conditions: clear Supplier: Argos Accumulative Yards: 7 Batch Size (cy): 7 Batch Time: 1500 Plant: 104 Placement Method: Bucket & lift Truck No.: 5091 Ticket No.: 10437207 Water Added Before (gal): 15 Water Added After (gal): 0 Field Test Data Sample Location: pier cap P8/15 Test Result Specification Placement Location: Pier cap P8/15 P9/15 Slump (in): 5 3-5 Air Content (%): 0.0 0-3 Concrete Temp. (F): 93 50-95 Ambient Temp. (F): 97 Plastic Unit Wt. (pcf): 150.0 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 07/05/18 7 57,640 4,590 4 1 B 4.00 12.57 07/26/18 28 68,060 5,420 4 1 C 4.00 12.57 07/26/18 28 71,930 5,720 5 1 D 4.00 12.57 07/26/18 28 72,260 5,750 2 Average (28 days) 5,630 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0328 Service Date: 06/28/18 Report Date: 08/03/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0328 Service Date: 06/28/18 2501 E Loop 820 N Report Date: 07/09/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Mix ID: 9727 Supplier: Argos Batch Time: 1500 Plant: 104 Truck No.: 5091 Ticket No.: 10437207 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 5 3-5 0.0 0-3 93 50-95 97 4.00 150.0 57,640 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 57,640 Initial Cure: Outside 07/26/18 Comments: Samples Made By: Terracon Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/05/18 7 57,640 12.57 07/26/18 28 12.57 07/26/18 28 12.57 07/26/18 28 Hold Final Cure: Moist Room 06/28/18 Sample Time: 1530 Jeremy Washington clear 7 Batch Size (cy): 7 Bucket & lift 15 0 pier cap P8/15 Pier cap P8/15 P9/15 Compressive Strength Fracture Tested (psi) Type By 4,590 4 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0328 Service Date: 06/28/18 Report Date: 07/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 FIELD DENSITY TEST REPORT Irerracon Report Number: 95181011.0327 Service Date: 06/28/18 2501 E Loop 820 N Report Date: 07/02/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Lab Test Data Project Requirements Mat. Proctor No. Ref. No. 1 95181011.0253 Field Test Data Classification and Description Crushed Concrete Test No. Test Location Laboratory Test Method ASTM D698 Optimum Water Max. Lab Water Content Density Content Compaction (%) (pcf) (%) (%) 11.7 119.9 Opt + 98%+ Probe Wet Water Water Dry Percent Lift / Mat. Depth Density Content Content Density Compaction Elev. No. (in) (pcf) (pcf) (%) (pcf) (%) Building Pad 92 Grid Lines P8.2-15.4 F.G. 1 8 131.4 14.0 11.9 117.4 98 93 Grid Lines P9.5-16 F.G. 1 8 135.7 16.8 14.1 118.9 99 Datum: Flex Base Std. Cut. M:2229 Std. Cut. D: 668 S/N: 31150 Make: Troxler Model: 3430 Last Cal. Date: 04/28/2017 Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition (ASTM D-6938). Terracon Rep.: Carlos Vela Reported To: David with Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: __Lto Tul Senior Project Manager Test Methods: ASTM D6938 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cRoo07, 11-16-12, Rev.7 Page 1 of 1 Distribution Page Report Number: 95181011.0327 Service Date: 06/28/18 Report Date: 07/02/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 POST -TENSION OBSERVATIONS REPORT Report Number: 95181011.0325 Irerracon Service Date: 06/28/18 2501 E Loop 820 N Report Date: 07/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 PROJECT DATA Drawings Utilized: PKS-102, PKS-620, PTO 1, PT02, PT03, PT04, PT05, PT06, PT07 Locations/Items Observed: 2nd Level ramp P8.5 -P9/16-17 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape �( Column Tie Spacing & Type Bar and Cable Size X Proper Placement X Stirrup Spacing & Type X Bar and Cable Grade X Properly Tied X Cables Properly Wrapped Rebar and Cables Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Supports X Lapped Splices X Number of Bars and Cables X Proper Cover/Clearance X Proper Drape of Cables X Discrepancies/Comments: Talked with David w/ Manhattan about tendons T001 and T002 being shorter than shown on the plans. Awaiting an RFI Services: Terracon Rep.: Adam Wood Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �njupa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940004, 07-01-12, Rev.0 Page 1 of 1 Distribution Page Report Number: 95181011.0325 Service Date: 06/28/18 Report Date: 07/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600