HomeMy WebLinkAboutTerracon - 7/02/2018CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0331A Service Date: 07/02/18 Report Date: 07/09/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On July 2, 2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 5 concrete test cylinders cast on June 30, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0331A Services: Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0331A Service Date: 07/02/18 Report Date: 07/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0333 Service Date: 07/02/18 2501 E Loop 820 N Report Date: 08/03/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 3,000 psi @ 28 days Mix ID: 1877 Supplier: Argos Batch Time: 1530 Plant: 123 Truck No.: 5106 Ticket No.: 12330219 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 3-5 4.8 3.5-6.5 89 50-95 98 A 150.0 12.57 Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 4.00 12.57 1 B 4.00 12.57 1 C 4.00 12.57 1 D 4.00 12.57 Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 07/09/18 7 53,010 07/30/18 28 68,440 07/30/18 28 67,890 07/30/18 28 67,110 Average (28 days) 07/02/18 Sample Time: Jeremy Washington clear 6 Batch Size (cy): Bucket & lift 0 0 D/7 pier cap D/7 Pier cap Compressive 1600 Strength Fracture Tested (psi) Type By 4,220 4 5,450 3 5,400 4 5,340 5 5,400 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Late arrival, expected concrete at 2:00. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0333 Service Date: 07/02/18 Report Date: 08/03/18 Revision 2 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0333 Service Date: 07/02/18 2501 E Loop 820 N Report Date: 07/10/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Mix ID: 1877 Supplier: Argos Batch Time: 1530 Plant: 123 Truck No.: 5106 Ticket No.: 12330219 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 3-5 4.8 3.5-6.5 89 50-95 98 4.00 150.0 0 Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 0 Initial Cure: Outside 0 Comments: Sample Date: 07/02/18 Sample Time: 1600 Sampled By: Jeremy Washington Weather Conditions: clear Accumulative Yards: 6 Batch Size (cy): 6 Placement Method: Bucket & lift Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: D/7 pier cap Placement Location: D/7 Pier cap Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/09/18 7 53,010 12.57 07/30/18 28 12.57 07/30/18 28 12.57 07/30/18 28 Hold Final Cure: Moist Room Late arrival, expected concrete at 2:00. Samples Made By: Terracon Compressive Strength Fracture Tested (psi) Type By 4,220 4 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0333 Service Date: 07/02/18 Report Date: 07/10/18 Revision 1 - 7 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0333 Service Date: 07/02/18 2501 E Loop 820 N Report Date: 07/03/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 3,000 psi @ 28 days Mix ID: 1877 Supplier: Argos Batch Time: 1530 Plant: 123 Truck No.: 5106 Ticket No.: 12330219 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 3-5 4.8 3.5-6.5 89 50-95 98 4.00 150.0 0 Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 0 Initial Cure: Outside 0 Comments: Sample Date: 07/02/18 Sample Time: 1600 Sampled By: Jeremy Washington Weather Conditions: clear Accumulative Yards: 6 Batch Size (cy): 6 Placement Method: Bucket & lift Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: D/7 pier cap Placement Location: D/7 Pier cap Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/09/18 7 12.57 07/30/18 28 12.57 07/30/18 28 12.57 07/30/18 28 Hold Final Cure: Moist Room Late arrival, expected concrete at 2:00. Compressive Strength Fracture Tested (psi) Type By Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David with Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: John, Tupa Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0333 Service Date: 07/02/18 Report Date: 07/03/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 POST -TENSION STRESSING REPORT Report Number: 95181011.0332 Irerracon Service Date: 07/02/18 2501 E Loop 820 N Report Date: 07/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post -Tension Stressing Operations on Level 2, Pour 3. Please note that tendons T001, T002 and M0030 highlighted in green, are awaiting and RFI per David Saiter with Manhattan Constructions. Tendon marks highlighted in yellow were found to be outside the tolerance of +/-7%. David with Manhattan was informed of the stressing results. (Please see attached report.) Services: Terracon Rep.: Adam Wood Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION TENDON MARK CALC ELONG (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) 7% Restress (psi or kips) TOTAL (in.) % (+/-) REMARKS T001 5.25 3.5 4.88 3.500 5.62 3.5 -33% Pending RFI, David Saiter T002 5.25 3.25 4.88 3.250 5.62 1 -38% Pending RFI, David Salter T003 3.625 3.125 3.37 3.125 3.88 3.125 -14% T004 3.625 3.5 3.37 3.500 3.88 3.5 -3% T005 3.625 3.125 3.37 3.125 3.88 3.125 -14% T006 3.625 3.375 3.37 3.375 3.88 3.375 -7% T007 5.25 4.625 4.88 4.625 5.62 4.625 -12% T008 5.25 4.75 4.88 4.750 5.62 4.75 -10% T0010 5.25 4.5 4.88 4.500 5.62 4.5 -14% 0001A 4.625 4.25 4.30 4.250 4.95 4.25 -8% U00113 4.625 4.25 4.30 4.250 4.95 4.25 -8% 0002 4.625 4.25 4.30 4.250 4.95 4.25 -8% 0003A 4.625 4.125 4.30 4.125 4.95 4.125 -11% 00036 4.625 4.375 4.30 4.375 4.95 4.375 -5% 0004A 4.625 4.125 4.30 4.125 4.95 4.125 -11% 0004B 4.625 4.375 4.30 4.375 4.95 4.375 -5% 0005 4.625 4.625 4.30 4.625 4.95 4.625 0% 0006A 4.625 4.25 4.30 4.250 4.95 4.25 -8% 00066 4.625 4.875 4.30 4.875 4.95 4.875 5% 0007A 4.625 4.375 4.30 4.375 4.95 4.375 -5% 0007B 4.625 4.25 4.30 4.250 4.95 4.25 -8% 0008 4.625 4.25 4.30 4.250 4.95 4.25 -8% 0009A 4.625 4.625 4.30 4.625 4.95 4.625 0% 0009B 4.625 4.5 4.30 4.500 4.95 4.5 -3% U010A 4.625 4.375 4.30 4.375 4.95 4.375 -5% U01013 4.625 4.5 4.30 4.500 4.95 4.5 -3% U011 4.625 4.5 4.30 4.500 4.95 4.5 -3% U012A 4.625 4.5 4.30 4.500 4.95 4.5 -3% U012B 4.625 4.25 4.30 4.250 4.95 4.25 -8% U013A 1.75 1.375 1.63 1.375 1.87 1.375 -21% U013B 1.75 1.5 1.63 1.500 1.87 1.5 -14% U014 1.75 1.75 1.63 1.750 1.87 1.75 0% SHEETTITLE: ELONGATION RECORDS Jack #1: MRE052 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Manhattan Jack #1 PSI: 5400 LEVEL/POUR: Level 2, Pour 3 Jack #2 PSI: DATE: 7/2/18 1 STRESS BY: K & A Rebar VERIFIED BY: Adam Wood PAGE 1 OF 3 MEASURED ELONGATION TENDON MARK CALC ELONG (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) 7% Restress (psi or kips) TOTAL (in.) % (+/-) REMARKS U015A 1.75 1.875 1.63 1.875 1.87 1.875 7% U015B 1.75 1.375 1.63 1.375 1.87 1.375 -21% U016A 1.75 1.5 1.63 1.500 1.87 1.5 -14% U016B 1.75 2 1.63 2.000 1.87 2 14% U017 1.75 1.875 1.63 1.875 1.87 1.875 7% U018 1.75 2 1.63 2.000 1.87 2 14% M001A 3.625 3.375 3.37 3.375 3.88 3.375 -7% M0016 3.625 3.5 3.37 3.500 3.88 3.5 -3% M001C 3.625 3.375 3.37 3.375 3.88 3.375 -7% M001D 3.625 3.5 3.37 3.500 3.88 3.5 -3% M001E 3.625 3.625 3.37 3.625 3.88 3.625 0% M001F 3.625 3.25 3.37 3.250 3.88 3.25 -10% M001G 3.625 3.625 3.37 3.625 3.88 3.625 0% M001H 3.625 3.375 3.37 3.375 3.88 3.375 -7% M0011 3.625 3.25 3.37 3.250 3.88 3.25 -10% M002A 4.875 4.625 4.53 4.625 5.22 4.625 -5% M002B 4.875 4.625 4.53 4.625 5.22 4.625 -5% M002C 4.875 4.625 4.53 4.625 5.22 4.625 -5% M002D 4.875 5 4.53 5.000 5.22 5 3% M002E 4.875 4.875 4.53 4.875 5.22 4.875 0% M002F 4.875 4.75 4.53 4.750 5.22 4.75 -3% M002G 4.875 4.75 4.53 4.750 5.22 4.75 -3% M002H 4.875 5.5 4.53 5.500 5.22 5.5 13% M0021 4.875 5 4.53 5.000 5.22 5 3% M002J 4.875 5.375 4.53 5.375 5.22 5.375 10% M002K 4.875 4.875 4.53 4.875 5.22 4.875 0% M002L 4.875 4.5 4.53 4.500 5.22 4.5 -8% M002M 4.875 4.875 4.53 4.875 5.22 4.875 0% M002N 4.875 4.875 4.53 4.875 5.22 4.875 0% M0020 4.875 4.5 4.53 4.500 5.22 4.5 -8% M003A 4.875 4.875 4.53 4.875 5.22 4.875 0% M003B 4.875 4.5 4.53 4.500 5.22 4.5 -8% M003C 4.875 4.25 4.53 4.250 5.22 4.25 -13% M003D 4.875 4.75 4.53 4.750 5.22 4.75 -3% M003E 4.875 4.875 4.53 4.875 5.22 4.875 0% SHEETTITLE: ELONGATION RECORDS Jack #1: MRE052 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Manhattan Jack #1 PSI: 5400 LEVEL/POUR: Level 2, Pour 3 Jack #2 PSI: DATE: 7/2/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 2 OF 3 MEASURED ELONGATION CALC TENDON ELONG End 1 End 2 MARK (in.) (in.) (in.) -7% Total Recorded (in.) 7% Restress (psi or kips) TOTAL (in.) % (+/-) REMARKS M003F 4.875 4.75 4.53 4.750 5.22 4.75 -3% M003G 4.875 4.75 4.53 4.750 5.22 4.75 -3% M003H 4.875 4.75 4.53 4.750 5.22 4.75 -3% M0031 4.875 5 4.53 5.000 5.22 5 3% M003J 4.875 5 4.53 5.000 5.22 5 3% M003K 4.875 5 4.53 5.000 5.22 5 3% M003L 4.875 5 4.53 5.000 5.22 5 3% M003M 4.875 4.875 4.53 4.875 5.22 4.875 0% M003N 4.875 51/4 4.53 5.250 5.22 5.25 8% M003O .875 3.375 4.53 3.375 3.3 -31% Pending RFI, David Saiter SHEETTITLE: ELONGATION RECORDS Jack #1: MRE052 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Manhattan Jack #1 PSI: 5400 LEVEL/POUR: Level 2, Pour 3 Jack #2 PSI: DATE: 7/2/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 3 OF 3 Distribution Page Report Number: 95181011.0332 Service Date: 07/02/18 Report Date: 07/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 DEVIATION LOG Report Date: 7/9/2018 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste400 Tulsa, OK 74136 Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Deviation No. Report No. Service Service Date Description/Comments How Resolved Date Resolved Status D000001 0047 Concrete Compressive Strength Test D000002 0212 Field Density Testing D000003 0212 Field Density Testing D000004 0212 Field Density Testing D000005 0212 Field Density Testing D000006 0212 Field Density Testing D000007 0169 Concrete Compressive Strength Test D000008 0232 Concrete Compressive Strength Test D000009 0249 Field Density Testing 02/15/18 Slump does not comply, Set 1 Concrete met specified strength 04/26/18 Moisture content does not comply, Test 1 Retested Comments: Low Moisture Content. David with Manhattan was notified. 04/26/18 Moisture content does not comply, Test2 Retested Comments: Low Moisture Content. David with Manhattan was notified. 04/26/18 Moisture content does not comply, Test Retested Comments: Low Moisture Content. David with Manhattan was notified. 04/26/18 `Moisture content does not comply, Test4 Retested Comments: Low Moisture Content. David with Manhattan was notified. 04/26/18 Moisture content does not comply, Test Retested Comments: Low Moisture Content. David with Manhattan was notified. 04/11/18 Average compressive strength does not comply, Set 1 Age 28 05/08/18 Slump does not comply, Set 1 Concrete met strength 05/16/18 Moisture content does not comply, Test Retested 65 Page 1 of 2 02/22/18 Closed 04/27/18 Closed 04/27/18 04/27/18 04/27/18 Closed Closed Closed 04/27/18 Closed Open 06/05/18 Closed 05/16/18 Closed DEVIATION LOG Report Date: 7/9/2018 Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste400 Tulsa, OK 74136 Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Deviation No. Report No. Service Service Date Description/Comments How Resolved Date Resolved Status D000010 0271 Field Density Testing 05/30/18 Percent compaction does not comply, Retested Same Day 05/30/18 Closed Test 1 13000011 0271 Field Density Testing 05/30/18 Percent compaction does not comply, Retested Same Day 05/30/18 Closed Test 2 D000012 0271 Field Density Testing 05/30/18 Percent compaction does not comply, Retested Same Day 05/30/18 Closed Test 3 D000013 0273 Field Density Testing 05/31/18 Percent compaction does not comply, Retested Same Day 05/31/18 Closed Test 69 D000014 0273 Field Density Testing 05/31/18 Percent compaction does not comply, Retested Same Day 05/31/18 Closed Test 71 D000015 0169 Concrete Compressive 04/11/18 Average compressive strength does not Open Strength Test comply, Set 1 Age 56 D000016 0332 Post -Tension Stressing 07/02/18 Post -Tension Stressing Pending Open Comments: David Saiter w/Manhattan was notified and given a copy of the field report. D000017 0335 Concrete Compressive 07/03/18 Slump does not comply, Set 1 Pending compressive Open Strength Test Comments: excessive slump. Contractor strength at 28 days. was notified Page 2 of 2