HomeMy WebLinkAboutTerracon - 7/06/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0340
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
07/06/18 Sample Time: 1611
Sampled By:
Taylor Henson
Mix ID: 1792
Weather Conditions:
Overcast
Supplier: Argos
Accumulative Yards:
10/20 Batch Size (cy): 10
Batch Time: 1525
Plant:
Placement Method:
Bucket & lift
Truck No.: 5120
Ticket No.:
12330327
Water Added Before (gal):
0
Water Added After (gal):
0
Field Test Data
Sample Location:
Grade Beam from at P13/17. Refer to
Test
Result
Specification
PKS-100, see attached
Slump (in):
41/2
3 -5
Placement Location:
Grade Beam from P11-14/16.9-17.
Air Content (%):
2.4
0 - 3
Refer to PKS-100, see attached
Concrete Temp. (F):
92
Ambient Temp. (F):
91
Plastic Unit Wt. (pcf):
146.4
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
07/07/18
07/13/18 7 59,390
4,730 5
1 B 4.00
12.57
07/07/18
08/03/18 28 76,660
6,100 4
1 C 4.00
12.57
07/07/18
08/03/18 28 77,940
6,200 5
1 D 4.00
12.57
07/07/18
08/03/18 28 76,310
6,070 3
Average (28 days)
6,130
1 E
07/07/18
Hold
Initial Cure: Outside
Final Cure:
Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services:
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: 95181011.0340
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
Services:
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0340
Service Date: 07/06/18
Report Date: 08/03/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0340
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 1792
Supplier: Argos
Batch Time: 1525 Plant:
Truck No.: 5120 Ticket No.: 12330327
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
41/2 3 -5
2.4 0 - 3
92
91
146.4
No. ID
(in)
1 A
4.00
1 B
4.00
1 C
4.00
1 D
4.00
1 E
0
Initial Cure: Outside
0
Comments:
Samples Made By: Terracon
Services:
Sample Date:
07/06/18 Sample Time: 1611
Sampled By:
Taylor Henson
Weather Conditions:
Overcast
Accumulative Yards:
10/20 Batch Size (cy): 10
Placement Method:
Bucket & lift
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Grade Beam from at P13/17. Refer to
07/07/18
PKS-100, see attached
Placement Location:
Grade Beam from P11-14/16.9-17.
12.57
Refer to PKS-100, see attached
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.57
07/07/18
07/13/18
7
59,390
12.57
07/07/18
08/03/18
28
12.57
07/07/18
08/03/18
28
12.57
07/07/18
08/03/18
28
07/07/18
Hold
Final Cure: Moist Room
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Compressive
Strength Fracture Tested
(psi) Type By
4,730 5
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: 95181011.0340
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
Services:
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0340
Service Date: 07/06/18
Report Date: 07/19/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0339
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
Task: 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
07/06/18 Sample Time: 1314
Sampled By:
Taylor Henson
Mix ID: 9727
Weather Conditions:
Clear
Supplier: Argos
Accumulative Yards:
7/13 Batch Size (cy): 7
Batch Time:
Plant:
Placement Method:
Bucket & lift
Truck No.: 0
Ticket No.:
12330319
Water Added Before (gal):
0
Water Added After (gal):
0
Field Test Data
Sample Location:
Column at P11/15. Refer to PKS-100.
Test
Result
Specification
See Attachment.
Slump (in):
7
5 -7
Placement Location:
Columns from Grade Beam to Mid
Air Content (%):
3.4
3 - 6
2nd Tier at P12/15 & P12/16.
Concrete Temp. (F):
93
Columns from Grade Beam to 2nd
Ambient Temp. (F):
92
Tier at P11/16, P11/15 & P13/17.6.
Plastic Unit Wt. (pcf):
145.7
Columns from Inclining Ramp
Yield (Cu. Yds.):
Elevationm to 2nd Tier at P9/17,
P8/17, P7/17, P6/17. Refer to
PKS-100, see attached
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type By
1 A 4.00
12.57
07/07/18
07/13/18 7 55,200
4,390 3
1 B 4.00
12.57
07/07/18
08/03/18 28 67,830
5,400 4
1 C 4.00
12.57
07/07/18
08/03/18 28 68,970
5,490 2
1 D 4.00
12.57
07/07/18
08/03/18 28 71,650
5,700 3
Average (28 days)
5,530
1 E
07/07/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: 95181011.0339
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 08/03/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0339
Service Date: 07/06/18
Report Date: 08/03/18 Revision 1 - 28 -day results
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0339
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
Task: 817-268-8600 Reg No: F-3272
Client
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Material Information
Specified Strength: 5,000 psi @
Mix ID: 9727
Supplier: Argos
Batch Time:
Truck No.: 0
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Sample Information
28 days Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Plant:
Ticket No.: 12330319
Result Specification
7 5 -7
3.4 3-6
93
92
145.7
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
07/06/18 Sample Time: 1314
Taylor Henson
Clear
7/13 Batch Size (cy): 7
Bucket & lift
0
0
Column at P11/15. Refer to PKS-100.
See Attachment.
Columns from Grade Beam to Mid
2nd Tier at P12/15 & P12/16.
Columns from Grade Beam to 2nd
Tier at P11/16, P11/15 & P13/17.6.
Columns from Inclining Ramp
Elevationm to 2nd Tier at P9/17,
P8/17, P7/17, P6/17. Refer to
PKS-100, see attached
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam. Area Date
Date Test
Load
Strength Fracture Tested
No. ID (in) (sq in) Received
Tested (days)
(lbs)
(psi) Type By
1 A
4.00
12.57
07/07/18 07/13/18
7 55,200 4,390 3
1 B
4.00
12.57
07/07/18 08/03/18
28
1 C
4.00
12.57
07/07/18 08/03/18
28
1 D
4.00
12.57
07/07/18 08/03/18
28
1 E
07/07/18
Hold
Initial Cure: Outside
Final Cure: Moist Room
Comments:
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: 95181011.0339
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/19/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: 95181011.0339
Service Date: 07/06/18
Report Date: 07/19/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
REINFORCING STEEL OBSERVATIONS REPORT
Report Number: 95181011.0338
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/09/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: Structural Sheets GM S3.11 Detail 4, GM S3.11 Detail 5, & GM S3.12 Detail 3
Locations/Items Observed: Wall from B -E.2/5-5.3. Refer to GM.S1.01A
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Bar Length and Shape
X
Column Tie Spacing & Type
Bar Size
X
Proper Bar Placement
X
Stirrup Spacing & Type
X
Bar Grade
X
Properly Tied
X
Welded Splices
Rebar Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash & Debris Removed
X
Proper Ber Supports
X
Lapped Splices
X
Number of Bars
X
Proper Cover/Clearance
X
Discrepancies/Comments:
No discrepancies were noted at the time of this observation.
Services: Observation of Reinforcing Steel Placement
Terracon Rep.: Taylor Henson
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001, 5-5-10, Rev.7 Page 1 of 1
Distribution Page
Report Number: 95181011.0338
Service Date: 07/06/18
Report Date: 07/09/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
POST -TENSION OBSERVATIONS REPORT
Report Number: 95181011.0337
Irerracon
Service Date: 07/06/18 2501 E Loop 820 N
Report Date: 07/13/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: Post tension drawings, PT03,04,05,06,07,08/ Various details/ 04-09-18; Reinforcing steel drawings,
R02-11-1, 1L,1M, 1N, 1Q, 1R/ Various details/ 05-25-18
Locations/Items Observed: Level 2 Parking Garage P1 -P5.5/ 15-18
Test Method: Visual Observation
10:4201 A 9101 Z111111:144 ZIMIN 1161101
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Length and Shape
X
Column Tie Spacing &
Type
N/A
Bar and Cable Size
X
Proper Placement
X
Stirrup Spacing & Type
X
Bar and Cable Grade
X
Properly Tied
X
Cables Properly Wrapped
X
Rebar and Cables Clean
X
Dowel Bars in Place
X
Mechanical Splices
N/A
Trash & Debris Removed
X
Proper Supports
X
Lapped Splices
X
Number of Bars and
Cables
X
Proper Cover/Clearance
X
Proper Drape of Cables
X
Discrepancies/Comments:
No discrepancies were noted at the time of this observation.
• The reinforcing steel crew was finishing installing the forms along grid line 18. Some of the anchors have not been installed since
the forms were not erected prior to the finish of the observation. There are some temperature cables waiting to be installed at the
anchor points that are not in place prior to finishing the observation.
Services:
Terracon Rep.: Daniel Wright
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 1 of 1
Distribution Page
Report Number: 95181011.0337
Service Date: 07/06/18
Report Date: 07/13/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600
CONCRETE SAMPLE PICK-UP REPORT
Report Number: 95181011.0336A
Service Date: 07/06/18
Report Date: 07/09/18
Irerracon
2501 E Loop 820 N
Fort Worth. TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On 07/06/2018, a representative of Terracon was present at the above referenced project to obtain 1 set of 5 concrete test
cylinders cast on 07/05/2018. The samples were taken back to the Terracon laboratory where they were cured under
general accordance with ASTM C31 and will be reported under separate cover 95181011.0336.
Services:
Terracon Rep.: Daniel Wright
Reported To: David with Manhattan
Contractor:
Report Distribution:
See attached distribution list.
Reviewed By:
�Mn,
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cT0001, 9-28-10, Rev.8 Page 1 of 1
Distribution Page
Report Number: 95181011.0336A
Service Date: 07/06/18
Report Date: 07/09/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Brad Scheckelhoff
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Robert Montgomery
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600