Loading...
HomeMy WebLinkAboutTerracon - 7/09/2018CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0341A Service Date: 07/09/18 Report Date: 07/19/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On July 9th, 2018, a representative of Terracon was present at the above referenced project to obtain # 4 set of 6 concrete test cylinders cast on July 8th, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0341. Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0341A Service Date: 07/09/18 Report Date: 07/19/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0344 Service Date: 07/09/18 2501 E Loop 820 N Report Date: 08/08/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,500 psi @ 28 days Mix ID: 9908 Supplier: Argos Batch Time: 1453 Plant: 123 Truck No.: 7101 Ticket No.: 12330433 Field Test Data Test Result Specification Slump (in): 7 1/2 * 3-5 Air Content (%): 2.0 0-3 Concrete Temp. (F): 92 50-104 Ambient Temp. (F): 90 Sample Location: Plastic Unit Wt. (pcf): 151.2 Station Basement Wall @ Grid Line Yield (Cu. Yds.): 45.4 07/10/18 07/16/18 7 * = Field Test Results do not meet project specifications. Sample Date: 07/09/18 Sample Time: 1545 Sampled By: Daniel Blocker Weather Conditions: Clear Accumulative Yards: 36 Batch Size (cy): 9 Placement Method: Bucket Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Grid Line B/5 Placement Location: Station Basement Wall @ Grid Line 1 A 4.00 B -E.2/5 & B/5-5.3 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 07/10/18 07/16/18 7 107,550 8,560 2 1 B 4.00 12.57 07/10/18 08/06/18 28 133,750 10,640 2 1 C 4.00 12.57 07/10/18 08/06/18 28 132,140 10,520 3 1 D 4.00 12.57 07/10/18 08/06/18 28 128,520 10,230 4 Average (28 days) 10,460 1 E 07/10/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Contractor was notified of excessive slump. Specification for basement wall is 4+/-1 inch per GM.S0.01. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0344 Service Date: 07/09/18 Report Date: 08/08/18 Revision 2 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0344 Service Date: 07/09/18 2501 E Loop 820 N Report Date: 07/16/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,500 psi @ 28 days Mix ID: 9908 Supplier: Argos Batch Time: 1453 Plant: 123 Truck No.: 7101 Ticket No.: 12330433 Field Test Data Test Result Specification Slump (in): 7 1/2 6-9 Air Content (%): 2.0 0-3 Concrete Temp. (F): 92 50-104 Ambient Temp. (F): 90 Sample Location: Plastic Unit Wt. (pcf): 151.2 Station Basement Wall @ Grid Line Yield (Cu. Yds.): 45.4 12.57 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 0 Initial Cure: Outside 0 Sample Date: 07/09/18 Sample Time: 1545 Sampled By: Daniel Blocker Weather Conditions: Clear Accumulative Yards: 36 Batch Size (cy): 9 Placement Method: Bucket Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Grid Line B/5 Placement Location: Station Basement Wall @ Grid Line 28 B -E.2/5 & B/5-5.3 Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/10/18 07/16/18 7 107,550 12.57 07/10/18 08/06/18 28 12.57 07/10/18 08/06/18 28 12.57 07/10/18 08/06/18 28 07/10/18 Hold Final Cure: Moist Room Compressive Strength Fracture Tested (psi) Type By 8,560 2 Comments: Contractor was notified of excessive slump. Specification for basement wall is 4+/-1 inch per GM.S0.01. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0344 Service Date: 07/09/18 Report Date: 07/16/18 Revision 1 - 7 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0344 Service Date: 07/09/18 2501 E Loop 820 N Report Date: 07/10/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 4,500 psi @ 28 days Mix ID: 9908 Supplier: Argos Batch Time: 1453 Plant: 123 Truck No.: 7101 Ticket No.: 12330433 Field Test Data Test Result Specification Slump (in): 7 1/2 * 3-5 Air Content (%): 2.0 0-3 Concrete Temp. (F): 92 50-95 Ambient Temp. (F): 90 Sample Location: Plastic Unit Wt. (pcf): 151.2 Station Basement Wall @ Grid Line Yield (Cu. Yds.): 45.4 12.57 * = Field Test Results do not meet project specifications. Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 0 Initial Cure: Outside 0 Sample Date: 07/09/18 Sample Time: 1545 Sampled By: Daniel Blocker Weather Conditions: Clear Accumulative Yards: 36 Batch Size (cy): 9 Placement Method: Bucket Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Grid Line B/5 Placement Location: Station Basement Wall @ Grid Line 08/06/18 B -E.2/5 & B/5-5.3 Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/10/18 07/16/18 7 12.57 07/10/18 08/06/18 28 12.57 07/10/18 08/06/18 28 12.57 07/10/18 08/06/18 28 07/10/18 Hold Final Cure: Moist Room Compressive Strength Fracture Tested (psi) Type By Comments: Contractor was notified of excessive slump. Specification for basement wall is 4+/-1 inch per GM.S0.01. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: John, Tupa Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0344 Service Date: 07/09/18 Report Date: 07/10/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0342A Service Date: 07/09/18 Report Date: 07/19/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On July 9th, 2018, a representative of Terracon was present at the above referenced project to obtain # 1 of 5 concrete test cylinders cast on july 8th, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0342. Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0342A Service Date: 07/09/18 Report Date: 07/19/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600