HomeMy WebLinkAboutTerracon - 7/10/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0346 Service Date: 07/10/18 2501 E Loop 820 N Report Date: 08/09/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 07/10/18 Sample Time: 1345 Sampled By: Daniel Blocker Mix ID: 9727 Weather Conditions: slight rain Supplier: Argos Accumulative Yards: 6 Batch Size (cy): 6 Batch Time: 1242 Plant: 111 Placement Method: bucket Truck No.: 9030 Ticket No.: 11120826 Water Added Before (gal): Field Test Data Water Added After (gal): Sample Location: Parking Garage column @ P9/17 Test Result Specification Placement Location: Parking Garage columns @ GL Slump (in): 61/2 5-7 (P9/17 and P12/17) on Ramp to 2nd Air Content (%): 5.0 3-6 floor. (P12/16.4) ground to 2nd Concrete Temp. (F): 91 50-95 Ambient Temp. (F): 88 Plastic Unit Wt. (pcf): 143.6 Yield (Cu. Yds.): 43.5 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 07/17/18 7 62,470 4,970 3 1 B 4.00 12.57 08/07/18 28 77,370 6,160 2 1 C 4.00 12.57 08/07/18 28 79,530 6,330 4 1 D 4.00 12.57 08/07/18 28 79,510 6,330 5 Average (28 days) 6,270 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0346 Service Date: 07/10/18 Report Date: 08/09/18 Revision 1 - 28 -day results Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0346 Service Date: 07/10/18 2501 E Loop 820 N Report Date: 07/19/18 Fort Worth, TX 76118-6978 Task: 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9727 Supplier: Argos Batch Time: 1242 Truck No.: 9030 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Plant: Ticket No.: 11120826 Set Specimen Avg Diam. Result No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 1 D 4.00 1 E 62,470 Initial Cure: Outside 08/07/18 Comments: 61/2 5.0 91 88 143.6 43.5 Specification 5-7 3-6 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 07/17/18 7 62,470 12.57 08/07/18 28 12.57 08/07/18 28 12.57 08/07/18 28 Hold Final Cure: Moist Room 07/10/18 Sample Time: 1345 Daniel Blocker slight rain 6 Batch Size (cy): 6 bucket column @ P9/17 columns @ GL (P9/17 and P12/17) on Ramp to 2nd floor. (P12/16.4) ground to 2nd Compressive Strength Fracture Tested (psi) Type By 4,970 3 Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Report Number: 95181011.0346 Service Date: 07/10/18 Report Date: 07/19/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 POST -TENSION STRESSING REPORT Report Number: 95181011.0345 Irerracon Service Date: 07/10/18 2501 E Loop 820 N Report Date: 07/16/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension Stressing Operations on Level 2, Pour 4. Please note that tendons highlighted in yellow are outside of the tolerance of +/-7%. See attached sheets for recorded data. Services: Terracon Rep.: Adam Wood Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION CALC TENDON ELONG MARK (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS T011 5.25 4.875 4.88 4.88 5.62 4.875 -7% T012 5.25 5 4.88 5.00 5.62 5 -5% T013 5.25 4.5 4.88 4.50 5.62 4.5 -14% T014 5.25 4.25 4.88 4.25 5.62 4.25 -19% T015 5.25 4.5 4.88 4.50 5.62 4.5 -14% T016 5.25 4.5 4.88 4.50 5.62 4.5 -14% T017 5.25 4.875 4.88 4.88 5.62 4.875 -7% T018 5.25 3.625 4.88 3.63 5.62 3.625 -31% T019 5.25 4.25 4.88 4.25 5.62 4.25 -19% T020 4.875 4.5 4.53 4.50 5.22 4.5 -8% T021 4.875 4.625 4.53 4.63 5.22 4.625 -5% T022 4.875 4.75 4.53 4.75 5.22 4.75 -3% T023 14 13.875 13.02 13.88 14.98 13.875 -1% T024 14 13.875 13.02 13.88 14.98 13.875 -1% T025 14 13.375 13.02 13.38 14.98 13.375 -4% T026 14.875 14.5 13.83 14.50 15.92 14.5 -3% T027 14.875 13.875 13.83 13.88 15.92 13.875 -7% T028 14.875 13.875 13.83 13.88 15.92 13.875 -7% T029 14.875 14.125 13.83 14.13 15.92 14.125 -5% T030 14.875 14.25 13.83 14.25 15.92 14.25 -4% T031 4.875 4.75 4.53 4.75 5.22 4.75 -3% T032 4.875 4.5 4.53 4.50 5.22 4.5 -8% T033 4.875 5.25 4.53 5.25 5.22 5.25 8% T034 4.875 4.75 4.53 4.75 5.22 4.75 -3% T035 4.875 4.75 4.53 4.75 5.22 4.75 -3% T036 4.875 5 4.53 5.00 5.22 5 3% Parallel to Beam Slab Tendons SHEETTITLE: ELONGATION RECORDS Jack #1: MRE052 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR. Jack #1 PSI: 5400 LEVEL/POUR: Level 2, Pour 4 Jack #2 PSI: DATE: 7/10/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 1 OF 2 MEASURED ELONGATION TENDON MARK CALC ELONG End 1 End 2 (in.) (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS U051C 3.125 4.25 2.91 4.25 3.34 4.25 36% U051B 3.125 4 2.91 4.00 3.34 4 28% U051A 3.125 4 2.91 4.00 3.34 4 28% U050B 3.125 4.5 2.91 4.50 3.34 4.5 44% U050A 3.125 3.75 2.91 3.75 3.34 3.75 20% U049C 3.125 4.375 2.91 4.38 3.34 4.375 40% U049B 4.875 4.25 4.53 4.25 5.22 4.25 -13% U049A 4.875 4.5 4.53 4.50 5.22 4.5 -8% U048B 4.875 5.25 4.53 5.25 5.22 5.25 8% U048A 4.875 4.75 4.53 4.75 5.22 4.75 -3% U047 4.875 5 4.53 5.00 5.22 5 3% U046B 4.875 5 4.53 5.00 5.22 5 3% U046A 4.875 5 4.53 5.00 5.22 5 3% U045 4.875 4.75 4.53 4.75 5.22 4.75 -3% U044B 4.875 4.5 4.53 4.50 5.22 4.5 -8% U044A 4.875 5 4.53 5.00 5.22 5 3% U043 4.875 5 4.53 5.00 5.22 5 3% U042B 4.875 5 4.53 5.00 5.22 5 3% U042A 4.875 5 4.53 5.00 5.22 5 3% U041 4.875 5 4.53 5.00 5.22 5 3% U040B 4.875 4.875 4.53 4.88 5.22 4.875 0% U040A 4.875 4.75 4.53 4.75 5.22 4.75 -3% U039 4.875 4.75 4.53 4.75 5.22 4.75 -3% U038B 4.875 4.375 4.53 4.38 5.22 4.375 -10% U038A 4.875 4.5 4.53 4.50 5.22 4.5 -8% U037 4.875 4.375 4.53 4.38 5.22 4.375 -10% U036B 4.875 4.875 4.53 4.88 5.22 4.875 0% U036A 4.875 4.5 4.53 4.50 5.22 4.5 -8% U035B 4.875 4.875 4.53 4.88 5.22 4.875 0% U035A 4.875 4.75 4.53 4.75 5.22 4.75 -3% U019A 4.875 6.125 4.53 6.13 5.22 6.125 26% See comments U019B 4.875 5.875 4.53 5.88 5.22 5.875 21% See comments U020 4.875 6 4.53 6.00 5.22 6 23% U021A 4.875 6 4.53 6.00 5.22 6 23% U021B 4.875 6 4.53 6.00 5.22 6 23% Perpendicular to Beams Slab Tendons U022A & U022B had a "blow out" while stressing on the live end. Tendons U019 & U034 will not match the calculation elongation due to the pour moving from P4 to PS SHEETTITLE: ELONGATION RECORDS Jack #1: MRE052 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR. Jack #1 PSI: 5400 LEVEL/POUR: Level 2, Pour 4 Jack #2 PSI: DATE: 7/10/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 2 OF 2 Distribution Page Report Number: 95181011.0345 Service Date: 07/10/18 Report Date: 07/16/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600 CONCRETE SAMPLE PICK-UP REPORT Report Number: 95181011.0344A Service Date: 07/10/18 Report Date: 07/19/18 Irerracon 2501 E Loop 820 N Fort Worth. TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 On July 10, 2018, a representative of Terracon was present at the above referenced project to obtain # 1 set of 5 concrete test cylinders cast on July 9, 2018. The samples were taken back to the Terracon laboratory where they were cured under general accordance with ASTM C31 and will be reported under separate cover 95181011.0344. Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: �Mn, Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cT0001, 9-28-10, Rev.8 Page 1 of 1 Distribution Page Report Number: 95181011.0344A Service Date: 07/10/18 Report Date: 07/19/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Robert Montgomery Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600