Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 1/27/2017 (2)Iry �i .erp t p�rn�r a)xM iri c': _. -m...... �. - _ l eL 7.212rn� 7 - Dal00 k s214-352-4811a1?.5 n+" u1 REPORT OF FIELD COMPACTION Pagel oft Tested For: JLB Partners, LP Date Performed: 1/27/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Gra evine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth:8 Inches Moisture -Density Relations Proctor No. Material Description Opt. MC(%) Max DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcfi Moisture Density 393 SG BLDG. PAD 2 GRID POINT K,1-37.3 (S SITE GRID) 3 96.2 23.6 93,3 394 SG BLDG, PAD 2 GRID POINT L..5-37,6 (S. SITE GRID) 3 95.9 23.4 93 395 1ST BLDG. PAD 2 GRID POINT K,1 -37A (S SITE GRID) 3 97.8 23.8 94.9 396 2ND BLDG. PAD 2 GRID POINT K.5-37,6 (S SITE GRID) 3 97.1 23.4 94.2 397 1ST BLDG. PAD 2 GRID POINT L.6-37.8 (S. SITE GRID) 3 96.9 23.6 94 398 2ND BLDG, PAD 2 GRID POINT L4-37,5 (S, SITE GRID) 3 97.3 24 94,4 399 3RD BLDG, PAD 2 GRID POINT K.6-371 (S. SITE GRID) 3 97 23.3 94.1 400 4TH BLDG PAD 2 GRID POINT K,1-37,4 (S. SITE GRID) 3 96.5 24.2 93.6 401 3RD BLDG, PAD 2 GRID POINT L.1-37,6 (S.. SITE GRID) 3 96.1 24.4 93.2 402 4TH BLDG, PAD 2 GRID POINT L,7-37,4 (S. SITE GRID) 3 97.4 23.9 94.5 403 5TH BLDG. PAD 2 GRID POINT K 3-37.5 (S. SITE GRID) 3 96.4 23.7 93.5 404 6TH BLDG. PAD 2 GRID POINT K,137 57 (S, SITE GRID) 1 98.9 23 93.7 405 5TH BLDG, PAD 2 GRID POINT L.4-37„8 (S, SITE GRID) 3 95.9 24,1 93 406 6TH BLDG PAD 2 GRID POINT L,6-37,2 (S. SITE GRID) 3 96.3 23.4 93.4 407 7TH BLDG, PAD 2 GRID POINT K.1-37.6 (S. SITE GRID) 1 99.2 23.2 94 408 7TH BLDG. PAD 2 GRID POINT L.7-37,7 (S, SITE GRID) 3 96.8 23.8 93.9 409 SG BLDG, PAD 18 GRID POINT K..3-21,1 (S. SITE GRID) 3 95.9 24.5 93 410 SG BLDG. PAD 18 GRID POINT L.3-21.6 (S, SITE GRID) 3 96.3 24.2 93.4 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office "fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnicall-.'nyineerin ® Construction Materials Tesling - Environmental S•emices www. dallus(arkyo. com ns AxGO apr e° u.usas,, urve ` 2324 . 21bc352Z41€9diiaalx y214-352 Xs 7522S } 4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 1/27/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Graj)eville, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No (Lift Location No. (Pcf) Moisture Density 411 1ST BLDG, PAD 18 GRID POINT K,4-21.7 (S. SITE GRID) 4 93.9 26.4 97 412 2ND BLDG, PAD 18 GRID POINT K.1-21.1 (S SITE GRID) 3 96.9 24.4 94 413 1ST BLDG, PAD 18 GRID POINT L 6-21 (S, SITE GRID) 3 97.1 24.6 94.2 414 2ND BLDG. PAD 18 GRID POINT L..4-21,4 (S.. SITE GRID) 4 91.1 26.9 94.1 415 3RD BLDG. PAD 18 GRID POINT K,6-21,7 (S, SITE GRID) 4 93.6 26.6 96.7 416 4TH BLDG. PAD 18 GRID POINT K.8-21.1 (S, SITE GRID) 3 97 24.5 94.1 417 3RD BLDG. PAD 18 GRID POINT L,6-21.6 (S. SITE GRID) 3 97.7 24.6 94.8 418 4TH BLDG. PAD 18 GRID POINT L.4-21„1 (S.. SITE GRID) 1 98.3 22.9 93.2 419 5TH BLDG, PAD 18 GRID POINT K.7-21 (S. SITE GRID) 3 97.4 23.3 94.5 420 5TH BLDG. PAD 18 GRID POINT L.3-21.4 (S. SITE GRID) 3 97,2 23.5 94.3 421 6TH BLDG, PAD 18 GRID POINT K.1-21,8 (S. SITE GRID) 4 94 26.5 97.1 422 7TH BLDG, PAD 18 GRID POINT K,6-21,4 (S. SITE GRID) 3 96.8 24.2 93.9 423 6TH BLDG, PAD 18 GRID POINT L,7-21.5 (S.. SITE GRID) 4 91 ,8 26.9 94.8 424 7TH BLDG, PAD 18 GRID POINT L,1-21.1 (S, SITE GRID) 3 96.1 24 93.2 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, l^"rtrs��o �'oNh.'4ldlt its, lirm Test result with asterisk (*), iil'any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. ' Cl ry Moore, t T °lateriale l avang Division The lnforri¢ation and rCSUIts shown on this 'report are for the exctusivc Use of dw dient and the chent's d s1gnated recipienCs on file in our office. Test results are based on C1ata obtained from specific sample's tested at parficuk r Iocations noted and are Liot indicative. of the quahtieS of apparently identical or s9nlllar specimens, composition, performance, oc. The Use of our name and tCs YCSUILS Mus[ receive our Written approval. Rcports rm[St be reproduced in their en.brel'T Geotechnical Engineering , Construction Materials Testing e Environmental Services www. dallasfarfo. com