Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 1/21/2017��rtalros -�- _ __ 21241 14 352-4100 Fax. 214-3521.."i2 rp.+ r.ro^w. 114 0, IcL 214 81 bens Rd. L)allas 1 a x rs 4817 REPORT OF FIELD COMPACTION Page 1 of Tested For: JLB Partners, LP Date Performed: 1/21/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Gra evine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: IIS -5001 EZ Probe Depth: 8 Inches Moisture -Density Relations Proctor No. Material Description Opt MC(Vo) Max DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcfi Moisture Density 282 5TH BLDG, PAD 1 GRID POINT Z.3-27.4 (S. SITE GRID) 1 100.1 23.6 94.9 283 5TH BLDG. PAD 1 GRID POINT Y.5-24.5 (S. SITE GRID) 1 98.6 24 93.5 284 6TH BLDG. PAD 1 GRID POINT Z..4-36 5 (S. SITE GRID) 1 99.2 24.3 94 285 6TH BLDG. PAD 1 GRID POINT Z,1-27.1 (S. SITE GRID) 1 99,4 24.8 94.2 286 6TH BLDG, PAD 1 GRID POINT Y.1-24.4 IS, SITE GRID) 1 98.8 24.2 93.6 287 7TH BLDG, PAD 1 GRID POINT Z.5-36.8 (S.. SITE GRID) 1 99.6 23.8 94,4 288 7TH BLDG„ PAD 1 GRID POINT Z.1-27.1 (S.. SITE GRID) 1 100 23.4 94.8 289 7TH BLDG, PAD 1 GRID POINT Y.4-24.6 (S. SITE GRID) 1 100.6 24.2 95.4 290 8TH BLDG. PAD 1 GRID POINT Z,5-36.1 (S, SITE GRID) 1 99.5 23,8 94.3 291 8TH BLDG. PAD 1 GRID POINT Z-27.4 (S. SITE GRID) 1 99.1 23.6 93.9 292 8TH BLDG. PAD 1 GRID POINT Y.1-24,7 (S, SITE GRID) 1 98.8 23,9 93.6 293 9TH BLDG, PAD 1 GRID POINT Z,5-36 1 (S. SITE GRID) 1 99.6 24.2 94.4 294 9TH BLDG. PAD 1 GRID POINT Z1-27.6 (S. SITE GRID) 1 99.9 24 94.7 295 9TH BLDG, PAD 1 GRID POINT Y,7-24,5 (S, SITE GRID) 1 100.6 24.1 95.4 296 10TH BLDG. PAD 1 GRID POINT Z.1-36 (S, SITE GRID) 1 98.9 23,8 93.7 297 10TH BLDG. PAD 1 GRID POINT Z,6-27.1 (S.. SITE GRID) 1 100.1 23,5 94.9 298 10TH BLDG, PAD 1 GRID POINT Y.4-24.7 IS, SITE GRID) 3 96.8 24.2 93.9 299 11TH BLDG. PAD 1 GRID POINT Z.1-36.4 (S., SITE GRID) 3 97.1 23.5 94.2 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geoteehnieal Engineering ® Construction Materials Te i irtg , En )ironmental.S'err ices www.dallai-larpo.com bene Rd. 7522 r`ae.darCIONSrar,.tANT91,Yirai &cl 21� 81 q �fs�..41G)iS C a.d, ?IB �`">2 4$1t REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 1/21/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 GraLe�vin , Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS -5001 EZ Probe Depth:8 Inches Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No. (pcf) Moisture Density 300 11TH BLDG, PAD 1 GRID POINT Z.6-27.1 (S. SITE GRID) 3 96.7 24.5 93.8 301 11TH BLDG. PAD 1 GRID POINTY 6-24A (S. SITE GRID) 3 99.4 25.2 96.4 302 12TH BLDG, PAD 1 GRID POINT Z.5-36.6 (S. SITE GRID) 3 100.3 23.3 97.3 303 12TH BLDG, PAD 1 GRID POINT Z..2-27.1 (S. SITE GRID) 3 99.1 23.9 96.1 304 12TH BLDG. PAD 1 GRID POINT Y.4-24.4 (S. SITE GRID) 3 97.2 24.7 94.3 305 13TH BLDG, PAD 1 GRID POINT Z.6-36.1 (S. SITE GRID) 3 96.8 23.4 93.9 306 13TH BLDG. PAD 1 GRID POINT Z.4-27,3 (S. SITE GRID) 3 100.5 25.7 97.5 307 13TH BLDG. PAD 1 GRID POINT Y.1-24.4 (S, SITE GRID) 3 99.6 25.4 96.6 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Forgo d °onvult ruts:, life. Test result with asterisk (*), if'ony, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. l� Moore, f"TY 1G' lrrterials Testing Division 'Clic information anr.:l results s}t<.wn on this rcport are for the exclusive use ofthe client: and the client's designated recipients on file in our office. Test st: results are: based on data obtained from specific samples testcd at particular locations noted and are not indicativc of the qualities of apparently identical or similar specimens, composition, performance, ct:c. The use of our narne and test results inust receive our written approval. Reports must be rep.rodr rccd in thens entirety. Geotechnical Engineering , Construction Materials Testing e Environmental Services www.dallarfarffo.com