Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 2/10/20172324 Pabcns Rd. • Dallas 'l Texas 7522: mVcc) 1gSU >ra'Nrs, INC. Tel. 214-352-4100 Pax. 214-352-4811 REPORT OF FIELD COMPACTION Page I oft Tested For: JLB Partners, LP Date Performed: 2/10/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com Moisture -Density Relations Proctor No. Material Description Opt. MC(Yo) Max. DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (P Ci) Moisture Density 748 13TH BLDG. PAD 12 GRID POINT K-29-1 (N- SITE GRID) 1 98.2 23.9 93.1 749 13TH BLDG. PAD 12 GRID POINT K.3-31.4 (N. SITE GRID) 1 99 23.7 93.8 750 SG BLDG, PAD 13 GRID POINT 0.4-21.4 (N. SITE GRID) 4 92.1 26.4 95.1 751 SG BLDG. PAD 13 GRID POINT 0.2-24.6 (N. SITE GRID) 4 92.3 26.5 95.4 752 7TH BLDG- PAD 12 GRID POINT M.4-29.4 (N. SITE GRID) 4 92.4 26.8 95,5 753 7TH BLDG. PAD 12 GRID POINT M.3-31 (N. SITE GRID) 4 92.3 26.4 95.4 754 8TH BLDG. PAD 12 GRID POINT M.1-29,7 (N SITE GRID) 4 92.2 26.5 95.2 755 8TH BLDG- PAD 12 GRID POINT M.5-31.6 (N. SITE GRID) 4 92.3 26.6 95.4 756 9TH BLDG. PAD 12 GRID POINT M.1-29.4 (N. SITE GRID) 3 96.7 23.5 93.8 757 9TH BLDG- PAD 12 GRID POINT M.4-31.6 (N SITE GRID) 3 96.8 23.4 93.9 758 10TH BLDG- PAD 12 GRID POINT M.6-29.4 (N SITE GRID) 1 99.2 23.1 94 759 10TH BLDG. PAD 12 GRID POINT M-31.1 (N. SITE GRID) 1 99 23.2 93.8 760 11TH BLDG. PAD 12 GRID POINT M.1-29,7 (N. SITE GRID) 4 92.3 26.7 95.4 761 11TH BLDG- PAD 12 GRID POINT M.5-31.1 (N. SITE GRID) 4 92.4 26.6 95.5 762 12TH BLDG. PAD 12 GRID POINT M.8-29.6 (N. SITE GRID) 1 99.4 22.9 94.2 763 12TH BLDG. PAD 12 GRID POINT M.3-31.7 (N. SITE GRID) 1 99.1 23.1 93.9 764 13TH BLDG. PAD 12 GRID POINT M.1-29 (N. SITE GRID) 3 97.4 23.6 94.5 765 13TH BLDG, PAD 12 GRID POINT M.6-31.7 (N. SITE GRID) 3 97.7 23.4 94.8 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com 2324 Fabcns Rd. • Dallas, Tc\as 75225 ray.do CON turraxTs, rpll�. Tel. 214-352-4100 Fax. 214-352-4811 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo ans Fargo Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. 4 Test locations are referenced using an in-house system and are approximate. [ L�e�e G Moore, CET aterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 2/10/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth:8 Inches Test Elevation Proctor DryDensity Percent Percent (Lift Location No. (pcf) Moisture Density No. 766 6TH BLDG. PAD 13 GRID POINT M.1-21.4 (N. SITE GRID) 4 93.9 26.5 97 767 6TH BLDG. PAD 13 GRID POINT M.7-23.1 (N. SITE GRID) 4 93.7 26.4 96.8 768 7TH BLDG. PAD 13 GRID POINT M.6-21.7 (N. SITE GRID) 1 99.2 23.1 94 769 7TH BLDG. PAD 13 GRID POINT M.1-23.6 (N. SITE GRID) 1 99.4 23 94.2 770 8TH BLDG. PAD 13 GRID POINT M.7-21.4 (N. SITE GRID) 3 97.1 23.5 94.2 771 8TH BLDG. PAD 13 GRID POINT M.6-23.7 (N. SITE GRID) 3 97.2 23.7 94.3 772 9TH BLDG. PAD 13 GRID POINT M.1-21.3 (N. SITE GRID) 1 98.9 23 93.7 773 9TH BLDG. PAD 13 GRID POINT M.6-23.4 (N. SITE GRID) 1 99.1 22.9 93.9 774 10TH BLDG. PAD 13 GRID POINT M.6-21.1 (N. SITE GRID) 1 99.6 22.9 94.4 775 10TH BLDG. PAD 13 GRID POINT M.7-23.1 (N. SITE GRID) 1 99.3 23.1 94.1 776 11TH BLDG. PAD 13 GRID POINT M.1-21.7 (N. SITE GRID) 4 92.7 26.5 95.8 777 11TH BLDG. PAD 13 GRID POINT M.6-23.6 (N. SITE GRID) 4 92.5 26.4 95.6 778 12TH BLDG. PAD 13 GRID POINT M.1-21 (N. SITE GRID) 3 96.8 23.5 93.9 779 12TH BLDG. PAD 13 GRID POINT M-23.1 (N. SITE GRID) 3 96.9 23.6 94 780 13TH BLDG. PAD 13 GRID POINT M.7-21.1 (N. SITE GRID) 1 99.8 23 94.6 781 13TH BLDG. PAD 13 GRID POINT M.6-23 (N. SITE GRID) 1 99.6 23.1 94.4 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo ans Fargo Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. 4 Test locations are referenced using an in-house system and are approximate. [ L�e�e G Moore, CET aterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com