Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 2/13/2017 (2)RZ00 mmm -; FARO CONSULTANTS. INC. 2324 1 �abens Rd. - Dallas Texas..7522: Tel. 214-352-4100 Fax. ax. 214-352-4811 REPORT OF FIELD COMPACTION Page I oft Tested For: JLB Partners, LP Date Performed: 2/13/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth:8 Inches Test Elevation No. /Lift 796 3RD 797 3RD 798 4TH 799 4TH 800 5TH 801 5TH 802 6TH 803 6TH 804 7TH 805 7TH 806 8TH 807 8TH 808 9TH 809 9TH 810 3RD 811 3RD 812 4TH Location BLDG. PAD 12 GRID POINT 0.3-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.4-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.1-28.7 (N. SITE GRID) BLDG PAD 12 GRID POINT 0.3-31.6 (N. SITE GRID) BLDG PAD 12 GRID POINT 0.1-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.6-31.3 (N. SITE GRID) BLDG_ PAD 12 GRID POINT 0.4-28.7 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.3-28.7 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.6-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.1-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.3-31.9 (N. SITE GRID) BLDG, PAD 12 GRID POINT 0.1-28.9 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.7-31.4 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.3-21.6 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.1-24.4 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.6-21.6 (N. SITE GRID) Proctor DryDensity No Moisture -Density Relations 3 96.3 3 Proctor No. Material Description Opt. MC(%) Max DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 100.3 Field Test Results 99.1 1 98.8 Test Elevation No. /Lift 796 3RD 797 3RD 798 4TH 799 4TH 800 5TH 801 5TH 802 6TH 803 6TH 804 7TH 805 7TH 806 8TH 807 8TH 808 9TH 809 9TH 810 3RD 811 3RD 812 4TH Location BLDG. PAD 12 GRID POINT 0.3-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.4-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.1-28.7 (N. SITE GRID) BLDG PAD 12 GRID POINT 0.3-31.6 (N. SITE GRID) BLDG PAD 12 GRID POINT 0.1-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.6-31.3 (N. SITE GRID) BLDG_ PAD 12 GRID POINT 0.4-28.7 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.3-28.7 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.6-31.3 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.1-28.4 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.3-31.9 (N. SITE GRID) BLDG, PAD 12 GRID POINT 0.1-28.9 (N. SITE GRID) BLDG. PAD 12 GRID POINT 0.7-31.4 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.3-21.6 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.1-24.4 (N. SITE GRID) BLDG. PAD 13 GRID POINT 0.6-21.6 (N. SITE GRID) Proctor DryDensity No (pcfl 3 96.3 3 96.5 1 99.1 1 98.9 4 92.7 4 92.5 3 97.2 3 98.1 1 99.6 1 99.5 5 99.7 5 99.6 1 100.1 1 100.3 1 99.1 1 98.8 3 97.3 Percent Percent Moisture Density 23.4 93.4 23.3 93.6 23 93.9 23.2 93.7 26.4 95.8 26.5 95.6 23.9 94.3 23.5 95.2 23.1 94.4 23.3 94.3 21.2 94 21.5 93.9 23.1 94.9 22.9 951 23.1 93.9 23.3 93.6 23.5 94.4 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval, Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www. dallasfamo. com F2324 Fabens Rd. - Dallas Texas 75225 FAnUO CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo o►rs a►rLs, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. ymarterials y Moore, CET Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materialr Testing • Environmental Services www.dallasfarFo.com REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 2/13/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No. (Lift Location No. (pcfi Moisture Density 813 4TH BLDG PAD 13 GRID POINT 0.7-24 (N. SITE GRID) 3 97.4 23.3 94.5 814 5TH BLDG. PAD 13 GRID POINT 0.3-21.7 (N. SITE GRID) 1 99.3 23 94.1 815 5TH BLDG. PAD 13 GRID POINT 0.4-24.6 (N. SITE GRID) 1 99.4 23.2 94.2 816 6TH BLDG. PAD 13 GRID POINT 0.3-21.3 (N. SITE GRID) 1 99.2 22.9 94 817 6TH BLDG. PAD 13 GRID POINT 0.7-24.7 (N. SITE GRID) 1 98.9 23.3 93.7 818 7TH BLDG. PAD 13 GRID POINT 0.1-21.3 (N. SITE GRID) 3 98.2 23.5 95.2 819 7TH BLDG. PAD 13 GRID POINT 0.3-24.5 (N. SITE GRID) 3 97.8 23.6 94,9 820 8TH BLDG. PAD 13 GRID POINT 0.7-21.4 (N. SITE GRID) 5 99.4 21 93.7 821 8TH BLDG. PAD 13 GRID POINT 0.4-24.8 (N. SITE GRID) 5 99.1 21.2 93.4 822 9TH BLDG. PAD 13 GRID POINT 0-21 (N. SITE GRID) 3 97.7 23.4 94.8 823 9TH BLDG. PAD 13 GRID POINT 0.3-24.4 (N. SITE GRID) 3 97.4 23.6 94.5 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo o►rs a►rLs, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. ymarterials y Moore, CET Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materialr Testing • Environmental Services www.dallasfarFo.com