Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 3/10/2017M�Go� 2324 Fabcns Rd. • DDallax, Texas 7522: VA nO ❑ CON F3L7LTA��iTB. nqa� _-�- 'Vel. 214-3 52-4100 1 � ax. 214-352-4811 REPORT OF FIELD COMPACTION Page I oft Tested For: JLB Partners, LP Date Performed: 3/10/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth:8 Inches Moisture -Density Relations Proctor No. Material Description Opt. MC(016) Max. DD (pcn DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 8 Reddish Brown and Tan CLAYEY SAND 13 115 Min. 95 -2 to +2 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcf} Moisture Density 1384 5TH BLDG. PAD 19 GRID POINT N.1-36.5 (N. SITE GRID) 1 100.3 22.9 95.1 1385 6TH BLDG. PAD 19 GRID POINT 0.6-36.3 (N SITE GRID) 3 98.1 23.4 95.2 1386 7TH BLDG. PAD 19 GRID POINT 0.4-36.7 (N SITE GRID) 3 99.2 23.6 96.2 1387 8TH BLDG. PAD 19 GRID POINT N.6-36.8 (N. SITE GRID) 1 99.8 22.9 94.6 1388 9TH BLDG. PAD 19 GRID POINT N-36 5 (N. SITE GRID) 1 100.5 23.1 95.3 1389 10TH BLDG. PAD 19 GRID POINT 0.1-36.3 (N. SITE GRID) 3 97.8 23.4 94.9 1390 11TH BLDG. PAD 19 GRID POINT 0.7-36.7 (N. SITE GRID) 3 97.4 23.6 94.5 1391 12TH BLDG. PAD 19 GRID POINT N,7-36.3 (N. SITE GRID) 1 99.5 23.2 94.3 1392 13TH BLDG. PAD 19 GRID POINT N-36.4 (N SITE GRID) 1 100.1 23.5 94.9 1393 SG BLDG. PAD 19 GRID POINT N.6-37.3 (N. SITE GRID) 4 91.3 26.4 94.3 1394 1ST BLDG. PAD 11 GRID POINT U 4-34.7 (N. SITE GRID) 8 110.1 14.8 95.7 1395 2ND BLDG. PAD 11 GRID POINT U.9-34.6 (N. SITE GRID) 5 101.7 21.5 95.9 1396 3RD BLDG. PAD 11 GRID POINT U.7-34.4 (N. SITE GRID) 5 100.4 22.3 94.6 1397 4TH BLDG. PAD 11 GRID POINT U.9-34 6 (N. SITE GRID) 5 102.1 21.5 96.2 1398 5TH BLDG. PAD 11 GRID POINT U.1-34.7 (N. SITE GRID) 5 102.8 21.2 96.9 1399 6TH BLDG. PAD 11 GRID POINT U.7-34.3 (N. SITE GRID) 5 102.2 20.9 96.3 1400 7TH BLDG. PAD 11 GRID POINT U.9-34.1 (N. SITE GRID) 5 99.3 22.8 93.6 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval, Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfar,go.com �0 2324 Fabens Rd- • Dollxs Texas 7522; Faoxrgtrrxnxzs. xric Tei. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 3/10/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Gra evine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent ILirt Location No. (pcfi Moisture Density No. 1401 8TH BLDG. PAD 11 GRID POINT U.1-34.6 (N. SITE GRID) 5 98.9 23 93.2 1402 9TH BLDG. PAD 11 GRID POINT U.9-34.1 (N. SITE GRID) 5 99.1 22.6 93.4 1403 10TH BLDG. PAD 11 GRID POINT LIA-34.2 (N. SITE GRID) 3 97.4 24.4 94.5 1404 1ST BLDG. PAD 19 GRID POINT N.9-37.5 (N. SITE GRID) 4 90.7 27.8 93.7 1405 2ND BLDG. PAD 19 GRID POINT N.7-37,3 (N. SITE GRID) 4 92.4 26.6 95.5 1406 3RD BLDG. PAD 19 GRID POINT N-37,8 (N. SITE GRID) 3 96.1 24.5 93.2 1407 4TH BLDG. PAD 19 GRID POINT N.6-37,4 (N, SITE GRID) 3 97.7 23.3 94.8 1408 5TH BLDG. PAD 19 GRID POINT N.7-37.4 (N. SITE GRID) 3 97.4 23.6 94.5 1409 6TH BLDG. PAD 19 GRID POINT N.4-37.6 (N. SITE GRID) 3 99.9 23.5 96.9 1410 7TH BLDG. PAD 19 GRID POINT N,6-37.4 (N. SITE GRID) 1 98.7 23.1 93.6 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo Consultants, Inc Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. �f ! CET ;;77mooLre, aterials Testing Division I The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotecbnical Engineering • Construction Alatet-ials Testing • Environmental Services www.dallasfarivo.com