HomeMy WebLinkAboutFargo Consultants, Inc. - 3/27/2017a?c 2324 Pabens Rd. nDallas Texas 7522; uaao CGVATiZ,TANRB, rHv. 'Fel. 214-352-4100 Pax. 214-352-4811 REPORT OF FIELD COMPACTION Page 1 oft Tested For: JLB Partners, LP Date Performed: 3/27/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Moisture -Density Relations Proctor No. Material Description Opt. MC(%) Max. DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 7 Brown CLAYEY SAND - Select Fill 14.3 114 Min. 95 -2 to +2 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (P Cf) Moisture Density 1674 10TH BLDG. PAD 8 GRID POINT M 5-47.6 (N. SITE GRID) 4 92.2 26.8 95.2 1675 10TH BLDG. PAD 8 GRID POINT N.1-48.1 (N. SITE GRID) 4 91 26.9 94 1676 11TH BLDG. PAD 8 GRID POINT M 3-487 (N. SITE GRID) 4 92.8 27 95.9 1677 11TH BLDG. PAD 8 GRID POINT N-48.5 2 (N SITE GRID) 4 93 27.1 96.1 1678 12TH BLDG. PAD 8 GRID POINT M_4-47.7 (N. SITE GRID) 1 100.6 23.2 95.4 1679 12TH BLDG. PAD 8 GRID POINT N.1-48 (N. SITE GRID) 1 101 23 95.7 1680 13TH BLDG. PAD 8 GRID POINT M.9-48.5 (N. SITE GRID) 1 99.2 23.8 94 1681 13TH BLDG. PAD 8 GRID POINT N,148.1 (N. SITE GRID) 1 99 23.7 93.8 1682 10TH BLDG. PAD 16 GRID POINT Z.6-14 (S, SITE GRID) 1 100.3 23.6 95.1 1683 10TH BLDG. PAD 16 GRID POINT Y-14.5 (S. SITE GRID) 1 100 24.1 94.8 1684 11TH BLDG. PAD 16 GRID POINT Z.6-14 (S. SITE GRID) 1 101 24 95.7 1685 11TH BLDG. PAD 16 POINT Y-14.5 (S, SITE GRID) 1 99.6 23.8 94.4 1686 12TH BLDG. PAD 16 GRID POINT Z.6-14 (S. SITE GRID) 1 100.4 24.1 95.2 1687 12TH BLDG. PAD 16 GRID POINT Y-14.5 (S. SITE GRID) 1 101.4 23.5 96.1 1688 13TH BLDG. PAD 16 GRID POINT Z.4.6-14 (S, SITE GRID) 1 1008 23.8 95.5 1689 13TH BLDG. PAD 16 GRID POINT Y-14.5 (S. SITE GRID) 1 100.8 23.3 95.5 1690 SG BLDG. PAD 16 GRID POINT Y-16.2 (S, SITE GRID) 4 91.2 27.5 94.2 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www.dallasfarfo.com C7 2324 habens Rd. Dallas Texas 7522; FAnGO CONSUETANTs, MC. 'rel. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 3/27/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M 16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No. ILift Location No. (pcfi Moisture Density 1691 1ST BLDG. PAD 16 GRID POINT Y.1-16.5 (S. SITE GRID) 3 97.1 23.8 94.2 1692 2ND BLDG. PAD 16 GRID POINT Y.5-16.1 (S. SITE GRID) 3 96.8 24.1 93.9 1693 3RD BLDG. PAD 16 GRID POINT Y.4-16.6 (S. SITE GRID) 1 98.3 23.6 93.2 1694 4TH BLDG. PAD 16 GRID POINT Y.616.7 (S. SITE GRID) 1 994 23.1 94.2 1695 5TH BLDG. PAD 16 GRID POINT Y.7-16,1 (S. SITE GRID) 1 101.1 22.9 95.8 1696 SG BLDG, PAD 8 GRID POINT 0.6-49.7 (N. SITE GRID) 3 96.2 27.5 93.3 1697 1ST BLDG. PAD 8 GRID POINT 0.7-49.2 (N. SITE GRID) 3 96.6 24 93.7 1698 2ND BLDG. PAD 8 GRID POINT 0.6-49.6 (N. SITE GRID) 3 96.8 24.6 93.9 1699 3RD BLDG. PAD 8 GRID POINT 0.1-49.9 (N. SITE GRID) 3 97 24.4 94.1 1700 4TH BLDG. PAD 8 GRID POINT 0.6-49 (N. SITE GRID) 3 97.5 23.7 94.6 1701 5TH BLDG. PAD 8 GRID POINT 0.7-49.1 (N. SITE GRID) 5 98.7 23.1 93 1702 FG BLDG. PAD 19 GRID POINT 0,1-36.8 (N. SITE GRID) 7 109.6 14.9 96.1 1703 FG BLDG. PAD 19 GRID POINT N.5-374 (N. SITE GRID) 7 109.3 15.3 95.9 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Farg9lCoUsUllalits, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. X11W Ga Moore, CET atcrials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or sirrlar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Conslruclion Malerials Tesling • Environmental Servic•es www.dallasfarffo.com