Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 3/7/2017 (2)_.00 F•nxu+n anrasrn�:rn�'rs.nga. 2324 Fabens Rd. - I)allas,'Pexas 75225 "Pel. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page 1 oft Tested For: JLB Partners, LP Date Performed: 3/7/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www.dallasfarfo.com Moisture -Density Relations Proctor No. Material Description Opt. MC(Yo) Max. DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcf) Moisture Density 1305 11TH BLDG. PAD 17 GRID POINT S.1-8.1 (S. SITE GRID) 3 96.9 23.9 94 1306 12TH BLDG. PAD 17 GRID POINT S.6-8 (S. SITE GRID) 1 98.5 23.1 93.4 1307 11TH BLDG. PAD 17 GRID POINT S.5-9.5 (S. SITE GRID) 3 96.1 24.3 93.2 1308 12TH BLDG. PAD 17 GRID POINT S.6-9.2 (S. SITE GRID) 3 96.6 23.8 93.7 1309 13TH BLDG. PAD 17 GRID POINT S.1-8.7 (S. SITE GRID) 1 98.2 23 93.1 1310 13TH BLDG. PAD 17 GRID POINT S.7-9.6 (S. SITE GRID) 3 97.9 23.5 95 1311 SG BLDG. PAD 17 GRID POINT U-8.2 (S. SITE GRID) 4 92.7 26.8 95.8 1312 SG BLDG. PAD 17 GRID POINT U.6-9.4 (S. SITE GRID) 4 91.9 26.5 94.9 1313 1ST BLDG. PAD 17 GRID POINT U.2-8.5 (S. SITE GRID) 1 99.8 23 94.6 1314 2ND BLDG. PAD 17 GRID POINT U.6-8.7 (S. SITE GRID) 3 97.1 23.4 94.2 1315 1 DT BLDG. PAD 17 GRID POINT U.2-9.6 (S. SITE GRID) 1 98.6 22.9 93.5 1316 2ND BLDG. PAD 17 GRID POINT U.4-9.7 (S. SITE GRID) 1 98.1 23.2 93 1317 6TH BLDG. PAD 11 GRID POINT X.6-34 (N. SITE GRID) 5 103.1 21 97.2 1318 7TH BLDG. PAD 11 GRID POINT x7-34.6 (N. SITE GRID) 5 100.2 23.4 94.4 1319 6TH BLDG PAD 11 GRID POINT W.3-35.4 (N. SITE GRID) 5 102.4 21.2 96.5 1320 7TH BLDG. PAD 11 GRID POINT W.1-35.8 (N. SITE GRID) 5 99.4 23.6 93.7 1321 8TH BLDG. PAD 11 GRID POINT X-34.2 (N. SITE GRID) 5 101.1 21.1 95.3 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www.dallasfarfo.com 2324 Fabens Rd. • Dallas,'1'exas 7522: FATco corrsvr.TA vTs, INC. 1 el. 214-352-4100 1':1x. 214-352-4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 3/7/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS -5001 EZ Probe Depth:8 Inches Test Elevation Proctor DryDensity Percent Percent No. (Lift Location No. (pcf) Moisture Density 1322 9TH BLDG. PAD 11 GRID POINT X.7-34.6 (N. SITE GRID) 5 99.6 23.2 93.9 1323 8TH BLDG. PAD 11 GRID POINT W.6-35,1 (N. SITE GRID) 5 100.6 22,3 94.8 1324 9TH BLDG. PAD 11 GRID POINT W.2-35.8 (N. SITE GRID) 5 100.9 21.7 95.1 1325 10TH BLDG. PAD 11 GRID POINT X,3-34,4 (N. SITE GRID) 5 102.2 20.8 96.3 1326 11TH BLDG. PAD 11 GRID POINT X 7-34 (N. SITE GRID) 5 100.7 21.1 94.9 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo onsultants, fire.Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. IM: y Moore, CET ierials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com