Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 5/16/2017 (2)� L00 *AAdo a strurANra, rrrc 2324 1 �abens Rd. - Dallas, Texas 7522; Tel. 214-352-4100 Pax. 214-352-4811 REPORT OF FIELD COMPACTION Page 1 of 1 Tested For: JLB Partners, LP Date Performed: 5/16/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Source of Compaction Requirements: Geotechnical Report Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. Proctor DryDensity No (pct Moisture -Density Relations Test Elevation Proctor No. Material Description Opt. MQ%o) Max DD (pcj) DD Range (%) MC Range 6 Tannish Brown CLAYEY SAND - Select Fill 11.1 116.8 Min. 95 -2 to +2 7 Brown CLAYEY SAND - Select Fill 14.3 114 Min. 95 -2 to +2 8 Reddish Brown and Tan CLAYEY SAND 13 115 Min. 95 -2 to +2 Source of Compaction Requirements: Geotechnical Report Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. Proctor DryDensity No (pct Field Test Results Test Elevation 109.3 6 112.8 Location No. ILift 111.6 2372 FG BLDG. PAD 5 RETEST FOR TEST #2303, REPORT DATE 5-16-2017 2373 FG BLDG PAD 5 GRID POINT H-45 (N. SITE GRID) 2374 FG BLDG PAD 5 RETEST FOR TEST #2304, REPORT DATE 5-16-2017 2375 FG BLDG PAD 5 RETEST FOR TEST #2305, REPORT DATE 5-16-2017 2376 FG BLDG PAD 4 GRID POINT 1 B-55.5 (S. SITE GRID) 2377 FG BLDG. PAD 4 GRID POINT Z-54.5 (S, SITE GRID) 2378 FG BLDG. PAD 4 GRID POINT Y.5-53.5 (S SITE GRID) 2379 FG BLDG. PAD 4 GRID POINT X-53 (S SITE GRID) Source of Compaction Requirements: Geotechnical Report Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. Proctor DryDensity No (pct 8 109.5 8 109.3 6 112.8 6 111.7 7 111.6 7 109.1 7 109.7 7 110.3 Percent Percent Moisture Density 11.1 95.2 11.7 95 9.3 96.6 10.4 95.6 16.3 97.9 12" 95.7 12.8 96.2 13.7 96.8 Respectfully Submitted, Fargo nsultants, Inc. G Y1 foore, CET aterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services w)vw. dallasfargo. com