Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 3/3/2017 (3).= _.. 2324 Fabcns Rd. ' Dallas, Tcxas 75225 7�5snpo aorrsvrTAN- n, rtrr.. Tel. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page I oft Tested For: JLB Partners, LP Date Performed: 3/3/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dalla.ffarffo.com Moisture -Density Relations Proctor No. Material Description Opt. MC(%) Max DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcfi Moisture Density 1229 3RD BLDG PAD 17GRID POINT Q.1-9 (S SITE GRID) 4 93.1 27.7 96.2 1230 4TH BLDG PAD 17 GRID POINT Q 5-9 4 (S SITE GRID) 3 97.3 23.9 94.4 1231 3RD BLDG. PAD 17 GRID POINT Q 2-8.4 (S SITE GRID) 4 93.5 26.4 96.6 1232 4TH BLDG. PAD 17 GRID POINT Q.7-8.9 (S SITE GRID) 3 96.1 23.4 932 1233 5TH BLDG PAD 17 GRID POINT Q.6-9.1 (S SITE GRID) 3 96.7 23.7 93.8 1234 6TH BLDG PAD 17 GRID POINT Q 6-9.4 (S. SITE GRID) 3 96.9 23.5 94 1235 5TH BLDG. PAD 17 GRID POINT Q 1-8.6 (S SITE GRID) 3 97.2 238 943 1236 6TH BLDG. PAD 17 GRID POINT Q 7-8.7 (S SITE GRID) 3 97 23.6 94.1 1237 7TH BLDG. PAD 17 GRID POINT Q 6-9 1 (S. SITE GRID) 3 96.2 24.4 93.3 1238 8TH BLDG. PAD 17 GRID POINT Q-9.6 (S SITE GRID) 3 96.8 23.5 93.9 1239 7TH BLDG. PAD 17 GRID POINT Q.4-8.1 (S. SITE GRID) 3 96 24.8 93.1 1240 8TH BLDG PAD 17 GRID POINT Q 4-3,5 (S. SITE GRID) 3 97.3 24.2 944 1241 9TH BLDG. PAD 17 GRID POINT Q.6-9.7 (S. SITE GRID) 1 98.2 231 93.1 1242 10TH BLDG PAD 17 GRID POINT Q.7-9.4 (S. SITE GRID) 3 97.8 24.2 94.9 1243 9TH BLDG. PAD 17 GRID POINT Q./-8 9 (S SITE GRID) 3 98 24 95.1 1244 10TH BLDG PAD 17 GRID POINT Q.4-8 (S SITE GRID) 1 98.4 22.9 93.3 1245 11TH BLDG. PAD 17 GRID POINT Q 4-9.7 (S SITE GRID) 1 98.1 23.2 93 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dalla.ffarffo.com j2z? 0 2324 Pabens Rd.. Dallas,1'exas 7522; Fanao corrsuT,TANTs, Trrc, 'fel. 214-352-4100 Pax. 214-352-4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 3/3/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No. ILift Location No. (pcf) Moisture Density 1246 12TH BLDG. PAD 17 GRID POINT Q-9.9 (S. SITE GRID) 1 98.5 22.9 93.4 1247 11TH BLDG. PAD 17 GRID POINT Q.4-8.7 (S. SITE GRID) 3 99.3 23.8 96.3 1248 12TH BLDG. PAD 17 GRID POINT Q.8-8.1 (S. SITE GRID) 1 98.2 23.3 93.1 1249 3RD BLDG, PAD 11 GRID POINT Z.1-35.8 (N. SITE GRID) 5 99.8 21.6 94.1 1250 4TH BLDG. PAD 11 GRID POINT Z.6-35 (N. SITE GRID) 5 100.2 21.2 94.4 1251 3RD BLDG. PAD 11 GRID POINT Y.4-36,1 (N. SITE GRID) 5 101.4 21.4 95.6 1252 4TH BLDG. PAD 11 GRID POINT Y-36.4 (N. SITE GRID) 5 101:9 20.9 96 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargn onsultanls, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. 7at Moore, CET erials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geoleelinical En,gineerin� • COnJtillctiOYl Matetzah Teatin� • Lnuironmentul Services www.dallasfarQo.com