Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 2/17/2017 (5)F GO FARP❑ CONSULTAKT& IINO, 2324 Fabens Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: Jackson Constru. LTD Ticket No.: 12310738 Ambient Temp. (°F): 54 Concrete Temp. (°F): 68 Time Batched: 8:50 AM Time Sampled: 9:40 AM Weather Condition: Clear SAMPLE DATE 2/17/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Argos Plant/Truck: 123 / 0 Mix Id Number: 1619 Air Content (%): 3.7 (ASTM C231) Water Added (gal): 0 Slump (inches) 41 /2 (ASTM C143) Location of Placement: Inlet Box - Line B-2, Station 2+75 and Line B, Station 1+01 Inlet Top - Line B-4, Station 1+06 Mix Design Strength of Concrete ( 3600 psi/28 days) Cylinder Number Age (days) I Date Tested Total Load (pounds) Compressive Strength (psi) 1A 7 2/24/2017 51950 4130 1B 28 3/17/2017 65030 5180 1 C 28 3/17/2017 64880 5160 1D Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Technician S. Clark Fargo Consultants, Inc. Checked By �r Davis Udeogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.daBasfargo.com