HomeMy WebLinkAboutFargo Consultants, Inc. - 3/10/2017 (3)FWGO FARCIO CCNBUIZANTS. INC. 2324 Fabens Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: FX Concrete Ticket No.: 3844400 Ambient Temp. (°F): 59 Concrete Temp. (°F): 71 Time Batched: 5:59 AM Time Sampled: 6:55 AM SAMPLE DATE 3/10/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Martin Marietta Plant/Truck: 141 / 1003 Mix Id Number: 9506 Air Content (%): 1.3 (ASTM C231) Water Added (gal): 0 Slump (inches) 41/2 (ASTM C143) Weather Condition: Cloudy Location of Placement: Floor Slab, Bldg. 1 Pour 3 - Grid Point T-27 Mix Design Strength of Concrete (3000 psi/28 days) Cylinder Number Age (days) Date Tested I Total Load (pounds) Compressive Strength (psi) 1 A 3 3/13/2017 26240 2090 1 B 7 3/17/2017 53060 4220 1 C 28 4/7/2017 60070 4780 1 D 28 4/7/2017 67900 5400 1 E Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Test locations are referenced using an in-house system and are approximate. Technician R. Franco Fargo Consultants, Inc. Checked 133 61 6r< ­ Davis Udcogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval, Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www dallasfargo. com M300 FAROO CONSULTANTS, INC, 2324 Fabens Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: FX Concrete Ticket No.: 3844714 Ambient Temp. (OF): 71 Concrete Temp. (OF): 77 Time Batched: 7:34 AM Time Sampled: 7:56 AM SAMPLE DATE 3/10/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Martin Marietta Plant/Truck: 141 / 1004 Mix Id Number: 9506 Air Content (%): 1.5 (ASTM C231) Water Added (gal): 0 Slump (inches) 4 1/2 (ASTM C143) Weather Condition: Cloudy Location of Placement: Floor Slab, Bldg. 1 Pour 3 - Grid Point U-25 Mix Design Strength of Concrete (3000 psi/28 days) Cylinder Number Age (days) Date Tested Total Load Compressive (pounds) Strength (psi) 2A 3 1 3/13/2017 27080 2160 2B 1 7 1 3/17/2017 53010 4220 2C 28 4/7/2017 70360 5600 2D 28 4/7/2017 72040 5730 2E Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Test locations are referenced using an in-house system and are approximate. Technician R. Franco Fargo Consultants, Inc. Checked By Davis Udeogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.daRasfargo.com F97C70 INNIME- FAROO CONSULTANTS, INC. 2324 Fabens Rd. , Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: FX Concrete Ticket No.: 3844936 Ambient Temp. (OF): 66 Concrete Temp. (OF): 76 Time Batched: 8:21 AM Time Sampled: 8:50 AM Weather Condition: Cloudy SAMPLE DATE 3/10/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Martin Marietta Plant/Truck: 141 / 1003 Mix Id Number: 9506 Air Content (%): 1.7 (ASTM C231) Water Added (gal): 0 Slump (inches) 4 (ASTM C143) Location of Placement: Floor Slab, Bldg. 1 Pour 3 - Grid Point S-24 Mix Design Strength of Concrete (3000 psi/28 days) Cylinder Number Age Date Tested I Total Load Compressive (days) (pounds) Strength (psi) 3A 3 3/13/2017 30190 2400 3B 7 3/17/2017 44230 3520 3C 28 4/7/2017 56160 4470 3D 28 4/7/2017 53190 4230 3E Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Test locations are referenced using an in-house system and are approximate. Technician R. Franco Fargo Consultants, Inc. Checked By Davis Udeogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.daBasfargo.com FGD FARGO 002413ULTANTS, rNO. 2324 Fabens Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: FX Concrete Ticket No.: 3845336 Ambient Temp. (°F): 66 Concrete Temp. (°F): 74 Time Batched: 9:49 AM Time Sampled: 10:20 AM SAMPLE DATE 3/10/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Martin Marietta Plant/Truck: 141 / 1006 Mix Id Number: 9506 Air Content (%): 2.2 (ASTM C231) Water Added (gal): 0 Slump (inches) 41 /2 (ASTM C143) Weather Condition: Cloudy Location of Placement: Floor Slab, Bldg. 1 Pour 3 - Grid Point R-25 Mix Design Strength of Concrete (3000 psi/28 days) Cylinder Number Age (days) Date Tested I Total Load (pounds) Compressive Strength (psi) 4A 3 3/13/2017 39660 3160 4B 7 3/17/2017 45570 3630 4C 28 4/7/2017 55150 4390 4D 28 4/7/2017 55850 4440 4E Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Test locations are referenced using an in-house system and are approximate. Technician R. Franco Fargo Consultants, Inc. Checked By Davis Udeogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. "fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www, daPasfargo, com ► 60 numbo- FAROO CONSULTANTS, INC. 2324 Fabens Rd. • Dallas, Texas 75229 Tel. 214-352-4100 Fax. 214-352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: JLB Partners, LP PROJECT: Grapevine Bluffs Grapevine, Texas Contractor: FX Concrete Ticket No.: 3845600 Ambient Temp. (OF): 66 Concrete Temp. (OF): 75 Time Batched: 10:55 AM Time Sampled: 11:15 AM SAMPLE DATE 3/10/2017 JOB NO.: M16-4962 CONCRETE INFORMATION Concrete Supplier: Martin Marietta Plant/Truck: 141 / 1006 Mix Id Number: 9506 Air Content (%): 1.8 (ASTM C231) Water Added (gal): 0 Slump (inches) 4 1/2 (ASTM C143) Weather Condition: Cloudy Location of Placement: Floor Slab, Bldg. 1 Pour 3 - Grid Point Q-27 Mix Design Strength of Concrete (3000 psi/28 days) Cylinder Number 1. Age Date Tested Total Load Compressive (days) (pounds) Strength (psi) 5 A 3 3/13/2017 38990 3100 5B 7 3/17/2017 39370 3130 5 C 28 4/7/2017 55630 4430 5D_ 28 4/7/2017 50500 4020 5 E Hold Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39) Remarks: Informed superintendent of all field test results. Test locations are referenced using an in-house system and are approximate. Technician R. Franco Fargo Consultants, Inc. Checked By Davis Udeogu Project Manager The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www. dallasfargo. com