CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 3965024
Ambient Temp. (OF): 65
Concrete Temp. (OF): 75
Time Batched: 5:21 AM
Time Sampled: 5:50 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: Martin Marietta
Plant/Truck: 141 / 346
Mix Id Number: F9506
Air Content (%): 1.8 (ASTM C231)
Water Added (gal): 10
Slump (inches) 6 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point M-30
Mix Design Strength of Concrete (3000 psi/28 days)
Cylinder Number
Age
(days)
D ate Tested
Total Load
(pounds)
Compressive
Strength (psi)
1 A
3
5/11/2017
28950
2300
1B
7
5/15/2017
32190
2560
1 C
28
6/5/2017
51740
4120
1 D
28
6/5/2017
49745
3960
1 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. "Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dafiasfargo.com
R 0
FAROO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 3965027
Ambient Temp. (OF): 64
Concrete Temp. (OF): 75
Time Batched: 5:37 AM
Time Sampled: 6:31 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: Martin Marietta
Plant/Truck: 141 / 220
Mix Id Number: F9506
Air Content (%): 1.1 (ASTM C231)
Water Added (gal): 10
Slump (inches) 5 1/2 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point 0-31
Mix Design Strength of Concrete (3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
2A
3
5/11/2017
31475 L
2500
2B
7
5/15/2017
34405
2740
2 C
28
6/5/2017
49880
3970
2 D
t 28
1 6/5/2017 1
51505
4100
2 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By kl�
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Envitonmental Services
www.daBasfargo.com
RWG0
FARCO CONSULTANTS, INC!.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 3965235
Ambient Temp. (OF): 66
Concrete Temp. (OF): 75
Time Batched: 6:50 AM
Time Sampled: 7:20 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: Martin Marietta
Plant/Truck: 141 / 346
Mix Id Number: F9506
Air Content (%): 1.5 (ASTM C231)
Water Added (gal): 10
Slump (inches) 5 3/4 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point Q-30
Mix Design Strength of Concrete (3000 psi/28 days)
Cylinder Number
Age-1Date
(days)
Tested
Total Load
(pounds)
Compressive
Strength (psi)
3A
1 3
5/11/2017
32590
2590
3 B
7
5/15/2017 37960
3020
3 C
28
6/5/2017
52240
4160
3 D
28
6/5/2017
48135 3830
3 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By (�i
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.daffasfargo.com
Flq-?GG
FARGO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 391
Ambient Temp. (°F): 72
Concrete Temp. (OF): 75
Time Batched: 7:18 AM
Time Sampled: 8:40 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material
Plant/Truck: 1 / 1003
Mix Id Number: F9506
Air Content (%): 1.1 (ASTM C231)
Water Added (gal): 10
Slump (inches) 8 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point N-30
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age-1Date
(days)
Tested
Total Load
(pounds)
Compressive
Strength (psi)
4A
3
5/11/2017
30470
2420
4B
7
5/15/2017
41145
3270
4 C
28
6/5/2017
50535
4020
4D
28
6/5/2017
49835
3970
4 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By
Davis Ude
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dallasfargo.com
GL/
Rq7
FAROO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 396
Ambient Temp. (OF): 73
Concrete Temp. (OF): 75
Time Batched: 8:26 AM
Time Sampled: 9:23 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.7 (ASTM C231)
Water Added (gal): 10
Slump (inches) 61 /2 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point P-31
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
5 A
3
5/11/2017 30665
2440
5B 7
5/15/2017
41665
3320
5 C 28
6/5/2017
51230
4080
5 D 28
6/5/2017 44650
3550
5 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc. 1
Checked By
Davis Udeo
0
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on File in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.daffasfatgo.com
FRRG0
PAP[.❑ C D N S 1.1 T.TA NTS, Citic.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 402
Ambient Temp. (°F): 76
Concrete Temp. (°F): 76
Time Batched: 9:35 AM
Time Sampled: 10:30 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material
Plant/Truck: 1 / 1003
Mix Id Number: F9506
Air Content (%): 1.2 (ASTM C231)
Water Added (gal): 10
Slump (inches) 6 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point Q-29
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
I Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
6A
3
5/11/2017
33705
2680
6B
7
5/15/2017
42805
3410
6C
28
6/5/2017
54995
4380
6D
28
6/5/2017
57350
4560
6E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.daffasfargo.com
FIRGO
FAROO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 407
Ambient Temp. (OF): 78
Concrete Temp. (OF): 76
Time Batched: 10:31 AM
Time Sampled: 11:16 AM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.6 (ASTM C231)
Water Added (gal): 10
Slump (inches) 5 1/2 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point 0-28
Mix Design Strength of Concrete (3000 psi/28 days)
Cylinder Number
Age I
(days)
Date Tested
I Total Load
(pounds)
Compressive
Strength (psi)
7 A
1 3
1 5/11/2017
17330 1
1380
7 B
7
5/15/2017
33830
2690
7 C
28
6/5/2017
52640 1
4190
7 D
28
6/5/2017
53740
4280
7E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked By
Davis Udeo
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.daBasfa,rgo.com
RWG0
FARGO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 415
Ambient Temp. (°F): 81
Concrete Temp. (OF): 78
Time Batched: 11:54 AM
Time Sampled: 12:30 PM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material
Plant/Truck: 1 / 1003
Mix Id Number: F9506
Air Content (%): 1.8 (ASTM C231)
Water Added (gal): 10
Slump (inches) 5 3/4 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point P-27
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
I Total Load
(pounds)
Compressive
Strength (psi)
8 A
3
5/11/2017
33480
2660
8B
7
5/15/2017 42320 3370
8 C
28 6/5/2017
54360
4330
8D
28 6/5/2017
53390
4250
8E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Checked 13
Davis Ude 1
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.daffasfargo.com
RR
00
a
FARW ODUSLTi7ANTS. INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 417
Ambient Temp. (°F): 82
Concrete Temp. (°F): 77
Time Batched: 12:15 PM
Time Sampled: 1:20 PM
Weather Condition: Clear
SAMPLE DATE 5/8/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 2.1 (ASTM C231)
Water Added (gal): 10
Slump (inches) 6 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 12 Pour 2 - Grid Point 0-31
Mix Design Strength of Concrete (3000 psi/28 days)
Cylinder Number Age I Date Tested Total Load Compressive
(days) (pounds) Strength (psi)
9 A
3 5/11/2017
25010
1990
9 B
7
5/15/2017
33845
2690
9 C
28 6/5/2017
57210 4550
9 D 28
6/5/2017
53850 4290
9 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, 1 C.
Checked B
Davis Lldeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. "fest results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www dallasfargo. com