Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 4/10/2017 (4)J r" ,AIWO 00143VLTANT13, ITC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PHI -3671 Gauge No.: R-72 Location: Floor Slab Building 18 (Type V) Pour H Report Date: 4/10/2017 Stressed Date: 4/10/2017 Project No: M16-4962 Calibration Date: 2/22/2017 Pump No.: 362596 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in oda Elongation Final Pressure (PSI) T1 67 5.38 4.84 5.91 5.7 5.7 6 5500 T2 67 5.38 4.84 5.91 5.7 5.7 6 5500 T3 67 5.38 4.84 5.91 5.6 5.6 4 5500 T4 67 5.38 4.84 5.91 5.6 5.6 4 5500 T5 67 5.38 4.84 5.91 1 5.5 5.5 2 5500 T6 70 5.50 4.95 6.05 5.3 5.3 -4 5500 T7 70 5.50 4.95 6.05 5.5 5.5 0 5500 T8 68 5.38 4.84 1 5.91 5.8 5.8 8 5500 T9 68 5.38 4.84 5.91 5.5 5.5 2 5500 T10 68 5.38 4.84 5.91 5.5 5.5 2 5500 T11 68 5.38 4.84 5.91 5.5 5.5 2 5500 T12 68 5.38 4.84 1 5.91 5.7 5.7 6 5500 T13 68 5.38 4.84 5.91 5.6 5.6 4 5500 T14 68 5.38 4.84 5.91 5.6 5.6 4 5500 T15 68 5.38 4.84 5.91 5.6 5.6 4 5500 T16 70 5.50 4.95 1 6.05 5.7 5.7 4 5500 T17 70 5.50 4.95 6.05 5.8 5.8 5 5500 T18 68 5.38 4.84 5.91 5.4 5.4 0 5500 T19 68 5.38 4.84 5.91 5.6 5.6 4 5500 T20 68 5.38 4.84 1 5.91 5.6 5.6 4 5500 T21 69 5.50 4.95 6.05 5.7 5.7 4 5500 T22 69 5.50 4.95 6.05 5.5 5.5 0 5500 T23 61 4.88 4.39 5.36 5.1 5.1 5 5500 T24 61 4.88 4.39 5.36 5.1 5.1 5 5500 T25 72 5.75 5.18 6.33 5.5 5.5 -4 5500 T26 72 5.75 5.18 6.33 5.5 5.5 -4 1 5500 T27 69 1 5.50 1 4.95 1 6.05 1 5.5 1 5.5 0 1 5500 Page 1 of 3 www.dallasfargo.com Checked By: fk ARGO CONSULTANTS INC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PHI -3671 Gauge No.: R-72 Location: Floor Slab Building 18 (Type V) Pour H Report Date: 4/10/2017 Stressed Date: 4/10/2017 Project No: Ml 6-4962 Calibration Date: 2/22/2017 Pump No.: 362596 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in oho Elon ation Final Pressure (PSI) T28 69 5.50 4.95 6.05 5.3 5.3 -4 5500 T29 1 69 5.50 4.95 6.05 5.4 5.4 1 -2 5500 T30 75 6.13 5.51 6.74 6.1 6.1 0 5500 T31 75 6.13 5.51 6.74 6.0 6.0 -2 5500 T32 72 5.75 5.18 6.33 6.0 6.0 4 5500 T33 72 5.75 5.18 6.33 5.8 5.8 1 5500 T34 72 5.75 5.18 6.33 5.8 5.8 1 5500 T35 72 5.75 5.18 6.33 5.6 5.6 -3 5500 T36 72 5.75 5.18 6.33 5.6 5.6 -3 5500 T37 72 5.75 5.18 6.33 5.9 5.9 3 5500 T38 73 5.88 5.29 1 6.46 5.6 5.6 -5 5500 T39 73 5.88 5.29 6.46 5.6 5.6 -5 5500 T39 30 2.25 2.03 2.48 2.3 2.3 2 5500 T40 30 2.25 2.03 2.48 2.3 1 2.3 2 5500 T41 30 2.25 2.03 1 2.48 2.4 2.4 7 5500 T42 91 7.25 6.53 7.98 7.2 7.2 -1 5500 T43 91 7.25 6.53 7.98 7.0 7.0 -3 5500 T44 91 7.25 6.53 7.98 7.0 7.0 -3 5500 T45 91 7.25 6.53 1 7.98 7.2 7.2 -1 5500 T46 91 7.25 6.53 7.98 7.2 7.2 -1 5500 T47 91 7.25 6.53 7.98 7.3 7.3 1 5500 T48 91 7.25 6.53 7.98 7.1 7.1 -2 5500 T49 91 7.25 6.53 7.98 7.4 7.4 2 5500 T50 91 7.25 6.53 7.98 7.2 7.2 -1 5500 T51 91 7.25 6.53 7.98 7.1 7.1 -2 5500 T52 93 7.50 1 6.75 8.25 7.4 1 7.4 -1 1 5500 T53 93 7.50 6.75 8.25 7.3 1 7.3 1 -3 1 5500 Page 2 of 3 www.dallasfargo.com Checked By. FAitGooNU.ANC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PHI -3671 Gauge No.: R-72 Location: Floor Slab Building 18 (Type V) Pour II Report Date: 4/10/2017 Stressed Date: 4/10/2017 Project No: M16-4962 Calibration Date: 2/22/2017 Pump No.: 362596 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T54 93 7.50 6.75 8.25 7.4 7.4 -1 5500 T55 1 93 7.50 6.75 8.25 7.4 7.4 -1 5500 T56 93 7.50 6.75 8.25 7.5 7.5 0 5500 T57 93 7.50 6.75 8.25 7.4 7.4 -1 5500 T58 93 7.50 6.75 8.25 7.3 7.3 -3 5500 T59 93 7.50 6.75 8.25 7.6 7.6 1 5500 T60 93 7.50 6.75 8.25 7.4 7.4 -1 5500 T61 93 7.50 6.75 8.25 7.6 7.6 1 5500 T62 93 7.50 6.75 8.25 7.7 7.7 3 5500 T63 93 7.50 6.75 8.25 7.4 7.4 -1 5500 T64 93 7.50 6.75 8.25 7.6 7.6 1 5500 T65 93 7.50 6.75 8.25 7.7 7.7 3 5500 T66 91 7.25 6.53 7.98 7.5 7.5 3 5500 T67 91 7.25 6.53 7.98 7.4 7.4 2 5500 T68 91 7.25 6.53 7.98 7.4 7.4 2 5500 T69 91 7.25 6.53 7.98 7.5 7.5 3 5500 T70 91 7.25 6.53 1 7.98 7.4 7.4 2 5500 T71 30 2.25 2.03 2.48 2.3 2.3 2 5500 T72 30 2.25 2.03 2.48 2.3 2.3 2 5500 T73 30 2.25 2.03 2.48 2.2 2.2 -2 5500 T74 14 0.88 0.79 0.96 0.9 0.9 3 5500 T75 14 0.88 0.79 0.96 0.9 0.9 3 5500 T76 52 4.13 3.71 1 4.54 4.1 4.1 -1 5500 T77 52 4.13 3.71 4.54 4.3 4.3 4 5500 T76 52 4.13 3.71 4.54 4.3 4.3 4 5500 Page 3 of 3 www.dallasfargo.com Checked By: ai Ready Cable ine. 4416 Keller Hicks Rd., Fort Worth, TX 76244 817.379.6553 Main 817.379.4007 Fax REPORT: EMILIO RAM S/N: PHI -3671 GAUGE: R-72 PUMP S/N: 362596 DATE: 2/22/2017 CALIBRATION STANDARD: P-3500 STRAIN INDICATOR 0148342 LOAD CELL 50 KIPS 070202 Gauge Pressure (PSI) Load Cell Readings Average of Three Readings #1 #2 #3 1,000 6,400 6,540 6,660 6,533 2,000 12,720 12,840 12,980 12,847 3,000 18,600 18,720 18,860 18,727 4,000 5,000 24,660 30,420 24,780 30,540 24,900 30,660 24,780 30,540 6,000 36,680 36,800 36,940 1 36,807 40000 a 35000 w 30000 U 25000 O CL 20000 N 15000 N W 10000 F U) 5000 0 0 1000 2000 3000 4000 GAUGE PRESSURE (psi) 5000 6000 7000 For a stressing force of 33,050 pounds, a gauge pressure of 5,500 is required. TECH: J. Hernandez L . laGA y = 6.0143x + 655 56