HomeMy WebLinkAboutFargo Consultants, Inc. - 1/9/2018FARGO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Grapevine
Ticket No.: 4436481
Ambient Temp. (OF): 41
Concrete Temp. (OF): 57
Time Batched: 8:30 AM
Time Sampled: 9:58 AM
Weather Condition: Cloudy
Location of Placement: Sidewalk - Grid Point L.9-33
SAMPLE DATE 1/9/2018
JOB NO.: M16-4962
Concrete Supplier: Marietta Martin
Plant/Truck: 141/1001
Mix Id Number: 8204
Air Content (%): 1.5 (ASTM C231)
Water Added (gal): 0
Slump (inches) 5 1/2 (ASTM C143)
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
1 A
7
1/16/2018
30945
2460
1 B
28
2/6/2018
46980
3740
1 C
28
2/6/2018
44980
3580
1 D
28
2/6/2018
44340
3530
1 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Informed superintendent of all field test results.
Test locations are referenced using an in-house system and are approximate.
Technician H. Hedayat
Fargo Consultants, Inc.
r-_DW__,5_
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
wwwdallasfargo. com
FARGO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: Jackson Construction, LTD
Ticket No.: 25766366
Ambient Temp. (OF): 40
Concrete Temp. (OF): 51
Time Batched: 8:04 AM
Time Sampled: 9:10 AM
SAMPLE DATE 1/9/2018
JOB NO.: M16-4962
Concrete Supplier: Redi-Mix Concrete
Plant/Truck: 259/0000
Mix Id Number: 1OJ11524
Air Content (%): 2.9 (ASTM C231)
Water Added (gal): 0
Slump (inches) 4 (ASTM C143)
Weather Condition: Cloudy
Location of Placement: Sidewalk - Grid Point M.8-20 to M.8-13
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
2A
7
1/16/2018
37820
3010
2B
28
2/6/2018
54735
4360
2 C
28
2/6/2018
50500
4020
2D
28
2/6/2018
54175
4310
2 E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Informed superintendent of all field test results.
Test locations are referenced using an in-house system and are approximate.
Technician H. Hedayat
Fargo Consultants, Inc.
r-_DW__,5_
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
wwwdallasfargo. com