HomeMy WebLinkAboutFargo Consultants, Inc. - 11/30/2017FARGO CONSULTANTS, INC.
2324 Fabens Rd. • Dallas, Texas 75229
Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Grapevine
Ticket No.: 4377356
Ambient Temp. (OF): 50
Concrete Temp. (OF): 58
Time Batched: 7:37 AM
Time Sampled: 8:20 AM
Weather Condition: Clear
Location of Placement: Sidewalk Grid Point P-36
SAMPLE DATE 11 /30/2017
JOB NO.: M16-4962
Concrete Supplier: Martin Marietta
Plant/Truck: 141 / 1005
Mix Id Number: 8204
Air Content (%): 3.5 (ASTM C231)
Water Added (gal): 0
Slump (inches) 4 1/4 (ASTM C143)
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
1 A
1 7
1 12/7/2017 1
42705 1
3400
1 B
28
12/28/2017
46705 1
3720
1 C
1 28
12/28/2017 1
46110 1
3670
1 D
28
12/28/2017
49815 1
3960
1 E
HOLD
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Informed superintendent of all field test results.
Test locations are referenced using an in-house system and are approximate.
Technician A. Maya
Fargo Consultants, Inc.
r-_DW__,5_
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
wwwdallasfargo. com