HomeMy WebLinkAboutFargo Consultants, Inc. - 6/17/20172324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1117
Ambient Temp. (°F): 82
Concrete Temp. (°F): 83
Time Batched: 7:51 AM
Time Sampled: 8:45 AM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osbur
Mix Id Number: F9506
Air Content (%): 1.2 (ASTM C231)
Water Added (gal): 0
Slump (inches) 7 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point K-45
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
1A
3
6/20/2017
25785
2050
1B
7
6/24/2017
40005
3180
1 C
28
7/15/2017
51775
4120
1D
28
7/15/2017
52255
4160
1E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1123
Ambient Temp. (°F): 83
Concrete Temp. (°F): 83
Time Batched: 8:25 AM
Time Sampled: 9:20 AM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osbur
Mix Id Number: F9506
Air Content (%): 1.5 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 1/2 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point L-46
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
2A
3
6/20/2017
33830
2690
2B
7
6/24/2017
45775
3640
2C
28
7/15/2017
67170
5350
2D
28
7/15/2017
61620
4900
2E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1136
Ambient Temp. (°F): 85
Concrete Temp. (°F): 85
Time Batched: 9:46 AM
Time Sampled: 10:35 AM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osbur
Mix Id Number: F9506
Air Content (%): 1.9 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point M-47
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
3A
3
6/20/2017
28825
2290
3B
7
6/24/2017
42395
3370
3C
28
7/15/2017
58450
4650
3D
28
7/15/2017
64580
5140
3E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1142
Ambient Temp. (°F): 88
Concrete Temp. (°F): 86
Time Batched: 10:31 AM
Time Sampled: 11:25 AM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osbur
Mix Id Number: F9506
Air Content (%): 1.4 (ASTM C231)
Water Added (gal): 0
Slump (inches) 7 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point K-48
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
4A
3
6/20/2017
39965
3180
4B
7
6/24/2017
47055
3740
4C
28
7/15/2017
62180
4950
4D
28
7/15/2017
60315
4800
4E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1153
Ambient Temp. (°F): 91
Concrete Temp. (°F): 85
Time Batched: 11:53 AM
Time Sampled: 12:45 PM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osbur
Mix Id Number: F9506
Air Content (%): 1.6 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 1/4 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point M-49
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
5A
3
6/20/2017
43710
3480
5B
7
6/24/2017
47110
3750
5C
28
7/15/2017
59735
4750
5D
28
7/15/2017
60180
4790
5E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1172
Ambient Temp. (°F): 94
Concrete Temp. (°F): 86
Time Batched: 3:05 PM
Time Sampled: 3:50 PM
Weather Condition: Clear
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / 1005
Mix Id Number: F9506
Air Content (%): 1.5 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 (ASTM C143)
Location of Placement: Floor Slab, Bldg. 3 Pour 1 - Grid Point M-47
Mix Design Strength of Concrete ( 3000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
6A
3
6/20/2017
26060
2070
6B
7
6/24/2017
45690
3640
6C
28
7/15/2017
49345
3930
6D
28
7/15/2017
56220
4470
6E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1110
Ambient Temp. (°F): 78
Concrete Temp. (°F): 85
Time Batched: 7:06 AM
Time Sampled: 8:00 AM
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / 1001
Mix Id Number: F8205
Air Content (%): 5 (ASTM C231)
Water Added (gal): 15
Slump (inches) 7 1/2 (ASTM C143)
Weather Condition: Cloudy
Location of Placement: Fire Lane - South Site Grid Point R-39.5
Mix Design Strength of Concrete ( 4000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
7A
3
6/20/2017
26805
2130
7B
7
6/24/2017
43860
3490
7C
28
7/15/2017
63120
5020
7D
28
7/15/2017
60235
4790
7E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician C. Whitmore
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1130
Ambient Temp. (°F): 83
Concrete Temp. (°F): 92
Time Batched: 9:11 AM
Time Sampled: 10:00 AM
Weather Condition: Cloudy
Location of Placement: Fire Lane - South Site Grid Point R-44
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / 1001
Mix Id Number: F8205
Air Content (%): 5 (ASTM C231)
Water Added (gal): 10
Slump (inches) 5 1/2 (ASTM C143)
Mix Design Strength of Concrete ( 4000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
8A
3
6/20/2017
24765
1970
813
7
6/24/2017
50025
3980
8C
28
7/15/2017
70275
5590
8D
28
7/15/2017
73105
5820
SE
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician C. Whitmore
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
Contractor: FX Concrete
Ticket No.: 1148
Ambient Temp. (°F): 84
Concrete Temp. (°F): 95
Time Batched: 11:23 AM
Time Sampled: 12:15 PM
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
CONCRETE INFORMATION
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / 1001
Mix Id Number: F8205
Air Content (%): 5 (ASTM C231)
Water Added (gal): 20
Slump (inches) 6 1/2 (ASTM C143)
Weather Condition: Cloudy
Location of Placement: Fire Lane - South Site Grid Point U.5-39.5
Mix Design Strength of Concrete ( 4000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
9A
3
6/20/2017
25880
2060
9B
7
6/24/2017
46720
3720
9C
28
7/15/2017
62995
5010
9D
28
7/15/2017
59685
4750
9E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician C. Whitmore
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
SAMPLE DATE 6/17/2017
JOB NO.: M16-4962
Contractor: FX Concrete Concrete Supplier: FX Material, LLC
Ticket No.: 1168 Plant/Truck: 1 / 1001
Ambient Temp. (°F): 92 Mix Id Number: F8205
Concrete Temp. (°F): 95 Air Content (%): 5 (ASTM C231)
Time Batched: 1:33 PM Water Added (gal): 0
Time Sampled: 2:35 PM Slump (inches) 6 (ASTM C143)
Weather Condition: Cloudy
Location of Placement: Fire Lane - South Site Grid Point Y-45
Mix Design Strength of Concrete ( 4000 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
10A
3
6/20/2017
29375
2340
10B
7
6/24/2017
44010
3500
10C
28
7/15/2017
59965
4770
10D
28
7/15/2017
56100
4460
10E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician C. Whitmore
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com