HomeMy WebLinkAboutFargo Consultants, Inc. - 6/23/20172324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1224
Ambient Temp. (°F): 83
Concrete Temp. (°F): 76
Time Batched: 7:37 AM
Time Sampled: 8:30 AM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 - Grid Point F-44
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.5 (ASTM C231)
Water Added (gal): 0
Slump (inches) 5 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
1A
3
6/26/2017
29555
2350
1B
7
6/30/2017
30925
2460
1 C
28
7/21/2017
57705
4590
1D
28
7/21/2017
55740
4440
1E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1230
Ambient Temp. (°F): 84
Concrete Temp. (°F): 77
Time Batched: 8:17 AM
Time Sampled: 9:12 AM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 - Grid Point H-45
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.6 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 1/4 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
2A
3
6/26/2017
25440
2020
2B
7
6/30/2017
35000
2790
2C
28
7/21/2017
56775
4520
2D
28
7/21/2017
58040
4620
2E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1240
Ambient Temp. (°F): 87
Concrete Temp. (°F): 78
Time Batched: 9:32 AM
Time Sampled: 10:25 AM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 -Grid Point J-46
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.9 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 1/2 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
3A
3
6/26/2017
27725
2210
3B
7
6/30/2017
37725
3000
3C
28
7/21/2017
56815
4520
3D
28
7/21/2017
54900
4370
3E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1251
Ambient Temp. (°F): 90
Concrete Temp. (°F): 79
Time Batched: 10:43 AM
Time Sampled: 11:35 AM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 - Grid Point F-41
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 2.1 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 3/4 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
4A
3
6/26/2017
29850
2380
4B
7
6/30/2017
34460
2740
4C
28
7/21/2017
54340
4320
4D
28
7/21/2017
54960
4370
4E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1257
Ambient Temp. (°F): 93
Concrete Temp. (°F): 79
Time Batched: 11:27 AM
Time Sampled: 12:20 PM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 - Grid Point I-45
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.4 (ASTM C231)
Water Added (gal): 0
Slump (inches) 6 1/2 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
5A
3
6/26/2017
31550
2510
5B
7
6/30/2017
36760
2930
5C
28
7/21/2017
53358
4250
5D
28
7/21/2017
55525
4420
5E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com
2324 Fabens Rd. • Dallas, Texas 75229
r
Fnxaa CONSULTANTS, INC. Tel. 214-352-4100 Fax. 214-352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: JLB Partners, LP
PROJECT: Grapevine Bluffs
Grapevine, Texas
CONCRETE INFORMATION
Contractor: FX Concrete
Ticket No.: 1270
Ambient Temp. (°F): 96
Concrete Temp. (°F): 81
Time Batched: 12:56 PM
Time Sampled: 1:50 PM
Weather Condition: Clear
Location of Placement: Floor Slab, Bldg. 5 - Grid Point H-46
SAMPLE DATE 6/23/2017
JOB NO.: M16-4962
Concrete Supplier: FX Material, LLC
Plant/Truck: 1 / Osburn
Mix Id Number: F9506
Air Content (%): 1.7 (ASTM C231)
Water Added (gal): 0
Slump (inches) 5 1/2 (ASTM C143)
Mix Design Strength of Concrete ( 3500 psi/28 days)
Cylinder Number
Age
(days)
Date Tested
Total Load
(pounds)
Compressive
Strength (psi)
6A
3
6/26/2017
26880
2140
6B
7
6/30/2017
31055
2470
6C
28
7/21/2017
57275
4560
6D
28
7/21/2017
51420
4090
6E
Hold
Cylinder Type: Nominal Cylinder Size (ASTM C39) 4 -inch by 8 -inch
Test Methods: Making and Curing (ASTM C31) Testing Methods (ASTM C39)
Remarks: Concrete was conveyed via concrete pump truck.
Test locations are referenced using an in-house system and are approximate.
Technician M. Strom
Fargo Consultants, Inc.
Davis Udeogu
Project Manager
The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on
data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition,
performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety.
Geotechnical Engineering • Construction Materials Testing • Environmental Services
www.dagasfargo.com