Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 1/12/2017■ ■":1?C70 2324 Fabcns Rd. • Dallas,'1'exas 75225 yr _•`• FARC:O coNSUI.TANTs; INQzm4, "1'cl. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page l oft Tested For: JLB Partners, LP Date Performed: 1/12/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Moisture -Density Relations Proctor No. Material Description Opt. MC(%) Max. DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcl) Moisture Density 90 3RD BLDG. PAD 1 GRID POINT T.5-27.1 (S. SITE GRID), 1 99,5 22.9 94.3 91 3RD BLDG. PAD 1 GRID POINT T.4-25.4 (S. SITE GRID) 1 98.3 23.1 93.2 92 4TH BLDG, PAD 1 GRID POINT T.7-27.1 (S. SITE GRID) 3 96.3 23.5 93.4 93 4TH BLDG. PAD 1 GRID POINT T.5-25.5 (S. SITE GRID) 3 96 23.9 93.1 94 5TH BLDG. PAD 1 GRID POINT T.6-27.2 (S. SITE GRID) 3 96,3 24.3 93.4 95 5TH BLDG. PAD 1 GRID POINT T,4-25.7 (S. SITE GRID) 3 96.9 23.8 94 96 6TH BLDG. PAD 1 GRID POINT T.3-25 (S. SITE GRID) 3 97.3 23.8 94.4 97 6TH BLDG. PAD 1 GRID POINT T.1-27.4 (S. SITE GRID) 3 95.9 24.1 93 98 7TH BLDG. PAD 1 GRID POINT T.7-25.5 (S, SITE GRID) 3 96.2 24.4 93.3 99 7TH BLDG. PAD 1 GRID POINT T.8-27.1 (S. SITE GRID) 3 96.4 23.7 93.5 100 SG BLDG. PAD 1 GRID POINT T.5-33 7 (S. SITE GRID) 1 102.2 23.8 96.9 101 SG BLDG. PAD 1 GRID POINT T.5-35.3 (S. SITE GRID) 1 101.9 24.1 96.6 102 1ST BLDG. PAD 1 GRID POINT T.6-33.4 (S. SITE GRID) 3 100.3 23.8 97.3 103 1ST BLDG. PAD 1 GRID POINT T.4-35.7 (S. SITE GRID) 3 99.7 24.2 96.7 104 2ND BLDG PAD 1 GRID POINT T2-33.4 (S. SITE GRID) 3 97 24 94.1 105 2ND BLDG. PAD 1 GRID POINT T.8-35.6 (S. SITE GRID) 3 97.1 23.6 94.2 106 3RD BLDG. PAD 1 GRID POINT T.4-33.4 (S. SITE GRID) 3 97.3 23.8 94.4 107 3RD BLDG. PAD 1 GRID POINT T.6-35.3 (S. SITE GRID) 3 96.8 24 93.9 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental5'ervices www.dallasfarfo.com F.n700 2324 Fabens Rd. - Dallas, Texas 75225 FA7tGO CONSUz.TANTs, T140 Tel- 214-352-4100 Fax. 214-352-4811 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, FarzMoore, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. - Glaterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 1/12/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No. (Lift Location No. (pcfi Moisture Density 108 4TH BLDG, PAD 1 GRID POINT T.5-33 (S. SITE GRID) 1 99.2 23 94 109 4TH BLDG. PAD 1 GRID POINT T.5-35.7 (S. SITE GRID) 1 98.5 23.5 93.4 110 5TH BLDG. PAD 1 GRID POINT T.7-33.4 (S. SITE GRID) 3 97.8 23.8 949 111 5TH BLDG. PAD 1 GRID POINT T.6-35.6 (S. SITE GRID) 3 98 23.3 95.1 112 6TH BLDG. PAD 1 GRID POINT T.9-33.1 (S. SITE GRID) 3 97.3 24.8 94.4 113 6TH BLDG. PAD 1 GRID POINT T.4-35.6 (S. SITE GRID) 3 97.6 24.1 94.7 114 7TH BLDG PAD 1 GRID POINT T.5-33,7 (S. SITE GRID) 3 96 24.4 93.1 115 7TH BLDG. PAD 1 GRID POINT T.8-35.4 (S. SITE GRID) 3 97.1 23.8 94.2 116 8TH BLDG. PAD 1 GRID POINT T.6-33.6 (S. SITE GRID) 3 96.8 25.1 93.9 117 8TH BLDG. PAD 1 GRID POINT T.2-35.4 (S SITE GRID) 3 96.4 24 93.5 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, FarzMoore, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines. Test locations are referenced using an in-house system and are approximate. - Glaterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. 'fest results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing • Environmental Services www.dallasfarffo.com