Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 5/31/2017 (2)FARGO COM- -=TANTS. INC. DAILY FIELD REPORT Client: JLB Partners, LP Project Name: Grapevine Bluffs Project Location: Grapevine, Texas Service(s) Provided: Fire Proofing Thickness Determination Service(s) Performed By: BKH Inspection Services 2324 Fabens Rd. • Daflas, Texas 75229 Tel 214-352-4100 Fax 214352-4811 Date Performed: 5/31/2017 FARGO Job No: M16-4962 Respectfully Submitted, Fargo Consultants, Inc. The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnica/Engineering • Construction Materials Testing • Environmental Services www.dallasfa,tgo.com BKH INSPECTION SERVICES, LLC P.O Box 2472 Burleson, TX 76097 817-726-5456 bkhinspection(a),email.com www.bkh i nspectionservices.com C REPORT OF ULTRASONIC INSPECTION Client: Fargo Consultants, Inc. Report No.: UT13062 Project No.: M16-4962 Project: Grapevine Bluffs Date of Service: 05-31-2017 Purchase Order No.: 3501 Services: Thickness Reading TestinE Page 1 of 1 Instrument/SN: Positector 6000-FKS3K87022 Long. Freq. /Size: FKS1275655 Certification Date: 05-16-2016 Shear Freq. /Size: N/A Purpose of Test: Coating Thickness Readings Calibration: Defelsko Precision Standards. Specification: Contract Documents Couplant: N/A Scan Sensitivity: Magnetic Induction Discrepancies/Comments: BKH Inspection Services arrived at the above location to perform a ultrasonic inspection with the results listed below: Item Quantity Description Results 1 20 20 I -Beam at the Leasin Office structural steel appear to have been coated Acce t with an acceptable amount of intumescent: 2 26 26 tube steel columns at the Leasing Office structural steel appear to have been Accept coated with an acceptable amount of intumescent paint. Level II Technician CWI #97041661 BKH Inspection Services, LLC Limitations: The test results herein were prepared based upon the specific samples provided For testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, this document is not a warranty or guaranty of the components inspected, it is intended to provide information as to the components inspected.