Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Fargo Consultants, Inc. - 4/28/2017 (3)
r ARGO QOiRSULTANTS, INC 0-140, .1c 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: R-129 Location: Floor Slab Building 13 (Type VI) Pour 1 Report Date: 4/28/2017 Stressed Date: 4/28/2017 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure PSI T84 70 5.50 4.95 6.05 5.6 5.6 2 5500 T85 70 5.50 4.95 6.05 5.5 5.5 1 0 5500 T86 70 5.50 4.95 6.05 5.5 5.5 0 5500 T87 70 5.50 4.95 6.05 5.3 5.3 -4 5500 T88 70 5.50 4.95 6.05 5.8 5.8 5 5500 T89 72 5.75 5.18 6.33 5.8 5.8 1 5500 T90 72 5.75 5.18 6.33 6.0 6.0 4 5500 T91 70 5.50 4.95 6.05 6.0 6.0 9 5500 T92 70 5.50 4.95 6.05 5.6 5.6 2 5500 T93 70 5.50 4.95 6.05 5.6 5.6 2 5500 T94 70 5.50 4.95 1 6.05 5.7 5.7 4 5500 T95 70 5.50 4.95 6.05 5.2 5.2 -5 5500 T96 70 5.50 4.95 6.05 5.4 5.4 -2 5500 T97 72 5.75 5.18 6.33 5.6 5.6 -3 5500 T98 72 5.75 5.18 1 6.33 5.9 5.9 3 5500 T99 68 5.38 4.84 5.92 5.6 5.6 4 5500 T100 70 5.50 4.95 6.05 5.2 5.2 -5 5500 T101 1 70 5.50 4.95 6.05 5.6 5.6 1 2 5500 T102 69 5.50 4.95 1 6.05 5.2 5.2 -5 5500 T103 69 5.50 4.95 6.05 5.3 5.3 -4 5500 T104 70 5.50 4.95 6.05 5.4 5.4 -2 5500 T105 67 5.38 4.84 5.92 5.7 5.7 6 5500 T106 67 5.38 4.84 5.92 5.5 5.5 2 5500 T107 68 5.38 4.84 5.92 5.4 5.4 0 5500 T108 68 5.38 4.84 5.92 5.6 5.6 4 5500 T109 66 5.25 4.73 1 5.78 5.6 5.6 1 7 5500 T110 66 5.25 4.73 1 5.78 5.6 5.6 7 5500 Page 1 of 5 www.dallasfargo.com Checked Qy: " r' AiLC#� QbN�i]L7.'�LNTB, TLC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: R-129 Location: Floor Slab Building 13 (Type VI) Pour 1 Report Date: 4/28/2017 Stressed Date: 4/28/2017 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T111 66 5.25 4.73 5.78 5.5 5.5 5 5500 T112 102 8.13 7.32 8.94 8.5 8.5 5 5500 T113 102 8.13 7.32 8.94 8.3 8.3 2 5500 T114 102 8.10 7.29 8.91 8.3 8.3 2 5500 T115 102 8.13 7.32 8.94 8.4 8.4 3 5500 T116 102 8.13 7.32 8.94 8.3 8.3 2 5500 T117 102 8.13 7.32 8.94 7.9 7.9 -3 5500 T118 102 8.13 7.32 8.94 7.8 7.8 -4 5500 T119 102 8.13 7.32 8.94 8.3 8.3 2 5500 T120 106 8.38 7.54 9.22 7.9 7.9 -6 5500 T121 106 8.38 7.54 1 9.22 7.8 7.8 -7 5500 T122 105 8.38 7.54 9.22 7.9 7.9 -6 5500 T123 105 8.38 7.54 9.22 8.0 8.0 -5 5500 T124 105 8.38 7.54 9.22 7.8 7.8 -7 5500 T125 106 8.38 7.54 1 9.22 7.8 7.8 -7 5500 T126 106 8.38 7.54 9.22 8.1 8.1 -3 5500 T127 103 8.25 7.43 9.08 8.0 8.0 -3 5500 T128 103 8.25 7.43 9.08 8.0 8.0 -3 5500 T129 113 9.00 8.10 9.90 5.5 4.0 9.5 6 5500 T130 85 6.88 6.19 7.57 7.2 7.2 5 5500 T131 113 9.00 8.10 9.90 5.4 4.0 9.4 4 5500 T132 111 8.88 7.99 9.77 5.2 4.1 9.3 5 5500 T133 111 8.88 7.99 9.77 5.3 4.1 9.4 6 5500 T134 111 8.88 7.99 9.77 5.3 4.0 9.3 5 5500 T135 111 8.88 7.99 9.77 5.5 4.0 9.5 7 5500 T136 111 8.39 7.55 9.23 5.0 4.1 9.1 8 5500 T137 110 8.75 7.88 9.63 8.8 8.8 1 5500 Page 2 of 5 www.dallasfargo.com Checked By: " YL " ARliQ RQi�713ULTANT�ZNC.. 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: R-129 Location: Floor Slab Building 13 (Type VI) Pour 1 Report Date: 4/28/2017 Stressed Date: 4/28/2017 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in oho Elongation Final Pressure (PSI) T138 110 8.75 7.88 9.63 9.0 9.0 3 5500 T139 110 8.75 7.88 9.63 9.1 9.1 4 5500 T140 109 8.75 7.88 9.63 9.0 9.0 3 5500 T141 110 8.75 7.88 9.63 8.8 8.8 1 5500 T142 110 8.75 7.88 1 9.63 8.7 8.7 -1 5500 T143 110 8.75 7.88 9.63 8.9 8.9 2 5500 T144 110 8.75 7.88 9.63 8.9 8.9 2 5500 T145 110 8.75 7.88 9.63 8.9 8.9 2 5500 T146 70 5.50 4.95 1 6.05 5.6 5.6 2 5500 T147 70 5.50 4.95 6.05 5.4 5.4 -2 5500 T148 70 5.50 4.95 6.05 5.4 5.4 -2 5500 T149 34 2.63 2.37 2.89 2.7 2.7 3 5500 T150 34 2.63 2.37 2.89 2.6 2.6 -1 5500 T151 34 2.63 2.37 2.89 2.6 2.6 -1 5500 T152 34 2.63 2.37 2.89 2.6 2.6 -1 5500 T153 136 10.88 9.79 1 11.97 7.5 3.5 11.0 1 5500 T154 136 10.88 9.79 11.97 7.6 3.6 11.2 3 5500 T155 136 10.88 9.79 11.97 7.6 3.8 11.4 5 5500 T156 136 10.88 9.79 11.97 7.5 3.8 11.3 4 5500 T157 136 10.88 9.79 1 11.97 7.5 3.8 11.3 4 5500 T158 136 10.88 9.79 11.97 7.5 3.6 11.1 2 5500 T159 136 10.88 9.79 11.97 7.6 3.8 11.4 5 5500 T160 136 10.88 9.79 11.97 7.6 3.5 11.1 2 5500 T161 136 10.88 9.79 1 11.97 7.5 3.5 11.0 1 5500 T162 136 10.88 9.79 11.97 7.5 3.6 11.1 2 5500 T163 136 10.88 9.79 11.97 7.6 1 3.5 11.1 1 2 5500 T164 136 10.88 9.79 11.97 7.8 1 3.5 11.3 4 5500 Page 3 of 5 www.dallasfargo.com Checked i I ■ t' i d i FARfiO C�11'I'3�'UL�AN'T',�1, I1YC1 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: R-129 Location: Floor Slab Building 13 (Type VI) Pour 1 Report Date: 4/28/2017 Stressed Date: 4/28/2017 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T165 136 10.88 9.79 11.97 7.7 3.8 11.5 6 5500 T166 137 11.00 9.90 12.10 8.0 3.8 11.8 7 5500 T167 137 11.00 9.90 12.10 8.0 3.8 11.8 7 5500 T168 137 11.00 9.90 12.10 7.8 3.5 11.3 3 5500 T169 138 11.00 9.90 12.10 7.9 3.6 11.5 1 5 5500 T170 138 11.00 9.90 12.10 7.9 3.4 11.3 3 5500 T171 138 11.00 9.90 12.10 8.0 3.6 11.6 5 5500 T172 138 11.00 9.90 12.10 7.9 3.5 11.4 4 5500 T173 138 11.00 9.90 12.10 7.9 3.5 11.4 4 5500 T174 138 11.00 9.90 12.10 7.9 3.6 11.5 5 5500 T175 138 11.00 9.90 12.10 8.0 3.6 11.6 5 5500 T176 138 11.00 9.90 12.10 8.0 3.7 11.7 6 5500 T177 138 11.00 9.90 12.10 8.0 3.8 11.8 7 5500 T178 138 11.00 9.90 1 12.10 7.9 3.8 11.7 6 5500 T179 137 11.00 9.90 12.10 7.9 3.8 11.7 6 5500 T180 137 11.00 9.90 12.10 7.9 3.8 11.7 6 5500 T181 137 11.00 9.90 12.10 7.9 3.5 11.4 4 5500 T182 137 11.00 9.90 12.10 8.0 3.6 11.6 5 5500 T183 137 11.00 9.90 12.10 8.0 3.4 11.4 4 5500 T184 137 11.00 9.90 12.10 8.0 3.4 11.4 4 5500 T185 134 10.75 9.68 1 11.83 8.0 3.5 11.5 7 5500 T186 66 5.25 4.73 5.78 5.6 5.6 7 5500 T187 66 5.25 4.73 5.78 5.6 5.6 7 5500 T188 71 5.63 5.06 6.19 5.5 5.5 -2 5500 T189 71 5.63 5.06 6.19 5.5 5.5 -2 5500 T190 73 5.88 5.29 6.47 5.9 1 5.9 0 1 5500 T191 73 5.88 5.29 6.47 6.0 1 1 6.0 2 1 5500 Page 4 of 5 www.dallasfargo.com Checked By: ARGO CONSUI,TANTS,_TwiC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: R-129 Location: Floor Slab Building 13 (Type VI) Pour 1 Report Date: 4/28/2017 Stressed Date: 4/28/2017 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T192 73 5.88 5.29 6.47 6.0 6.0 2 5500 T193 73 5.88 5.29 6.47 6.1 6.1 4 5500 T194 76 6.13 5.52 6.74 6.2 6.2 1 5500 T195 76 6.13 5.52 6.74 6.1 6.1 0 5500 T196 73 5.88 5.29 6.47 6.1 6.1 4 5500 T197 72 5.75 5.18 6.33 6.0 6.0 4 5500 T198 72 5.75 5.18 6.33 6.0 6.0 4 5500 T199 72 5.75 5.18 6.33 5.6 5.6 -3 5500 T200 72 5.75 5.18 6.33 5.6 5.6 -3 5500 T201 72 5.75 5.18 6.33 5.7 5.7 -1 5500 T202 70 5.50 4.95 6.05 5.7 5.7 4 5500 T203 70 5.50 4.95 6.05 5.6 5.6 2 5500 T204 25 1.88 1.69 2.07 1.9 1.9 1 5500 T205 25 1.88 1.69 1 2.07 1.9 1.9 1 5500 T206 13 0.75 0.68 0.83 0.8 0.8 7 5500 T207 13 0.75 0.68 0.83 0.8 0.8 7 5500 T208 19 1.38 1.24 1.51 1.4 1.4 2 5500 T209 30 2.25 2.03 2.48 2.2 2.2 -2 5500 T210 46 3.63 3.26 1 3.99 3.5 3.5 -3 5500 T211 14 0.88 0.79 0.96 0.9 0.9 3 5500 T212 14 0.88 0.79 0.96 0.9 0.9 3 5500 T213 30 2.25 2.03 2.48 2.3 2.3 2 5500 T214 18 1.25 1.13 1.38 1.3 1.3 4 5500 T215 52 4.13 3.71 4.54 4.4 4.4 7 5500 T216 52 4.13 3.71 4.54 4.4 4.4 1 7 5500 Page 5 of 5 www.dallasfargo.com -4� Checked By: