Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 6/13/2017 (2)it rltnGO CONS TE.TANTs, IN61 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD ** Revised Report ** Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: 337463 Location: Floor Slab Building 14(Type III) Pour 1 Report Date: 6/13/2017 Stressed Date: 5/26/17-6/7/17 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T103 71 5.63 5.07 6.19 5.4 5.4 -5 5500 T104 71 5.63 5.07 6.19 5.5 5.5 1 -2 5500 T105 68 5.38 4.84 5.92 5.1 5.1 -5 5500 T106 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T107 68 5.38 4.84 5.92 5.1 5.1 -5 5500 T108 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T109 68 5.38 4.84 5.92 5.1 5.1 -5 5500 T110 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T111 68 5.38 4.84 5.92 5.4 5.4 0 5500 T112 68 5.38 4.84 1 5.92 5.1 5.1 -5 5500 T113 71 5.63 5.07 6.19 5.4 5.4 -5 5500 T114 71 5.63 5.07 6.19 5.4 5.4 -5 5500 T115 68 5.38 4.84 5.92 5.1 5.1 -5 5500 T116 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T117 68 5.38 4.84 5.92 5.4 5.4 0 5500 T118 71 5.63 5.07 6.19 5.5 5.5 -2 5500 T119 71 5.63 5.07 6.19 5.5 5.5 -2 5500 T120 67 5.38 4.84 5.92 5.1 5.1 -5 5500 T121 67 5.38 4.84 5.92 5.1 5.1 -5 5500 T122 67 5.38 4.84 1 5.92 5.3 5.3 -2 5500 T123 69 5.50 4.95 6.05 5.3 5.3 -5 5500 T124 69 5.50 4.95 6.05 5.3 5.3 -5 5500 T125 60 4.75 4.28 5.23 4.5 4.5 -5 5500 T126 60 4.75 4.28 5.23 4.5 4.5 -5 5500 T127 60 4.75 4.28 5.23 4.5 4.5 -5 5500 T128 1 71 5.63 5.07 6.19 5.5 5.5 -2 1 5500 T129 1 71 5.63 5.07 6.19 1 5.4 1 5.4 1 -4 1 5500 Page 1 of 4 www.dallasfargo.com Checked 6y: TJK I t. FARGO CONSULTANTS. ING, 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD "Revised Report ** Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: 337463 Location: Floor Slab Building 14(Type III) Pour 1 Report Date: 6/13/2017 Stressed Date: 5/26/17-6/7/17 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T130 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T131 68 5.38 4.84 5.92 5.1 5.1 -5 5500 T132 1 68 5.38 4.84 5.92 5.3 5.3 -2 5500 T133 68 5.38 4.84 5.92 5.8 5.8 7 5500 T134 74 6.00 5.40 6.60 5.9 5.9 -2 5500 T135 74 6.00 5.40 6.60 6.4 6.4 7 5500 T136 71 5.63 5.07 6.19 5.4 5.4 -5 5500 T137 71 5.63 5.07 6.19 5.5 5.5 -2 5500 T138 71 5.63 5.07 6.19 5.5 5.5 -2 5500 T139 71 5.63 5.07 6.19 5.5 5.5 -2 5500 *T140 71 5.63 5.07 6.19 6.0 6.0 7 5500 T141 73 5.88 5.29 6.47 5.8 5.8 -2 5500 T142 73 5.80 5.22 6.38 5.8 5.8 -1 5500 T143 47 3.75 3.38 4.13 1 3.7 1 3.7 -1 5500 T144 47 3.75 3.38 4.13 3.6 3.6 -3 5500 T145 1 50 4.00 3.60 4.40 4.0 4.0 0 5500 T145-1 50 4.00 3.60 4.40 3.9 3.9 -3 5500 T146 30 2.25 2.03 2.48 2.4 2.4 6 5500 T147 30 2.25 2.03 1 2.48 2.4 2.4 6 5500 *T148 1 89 7.13 6.42 7.84 7.5 7.5 5 5500 T149 89 7.13 6.42 7.84 7.0 7.0 -2 5500 T150 89 7.13 6.42 7.84 7.0 7.0 -2 5500 T151 89 7.13 6.42 1 7.84 6.8 6.8 -5 5500 T152 89 7.13 6.42 7.84 6.8 6.8 -5 5500 T153 89 7.13 6.42 7.84 6.9 6.9 -4 5500 T154 89 1 7.13 6.42 7.84 1 6.9 1 .9 -4 5500 T155 89 1 7.13 1 6.42 1 7.84 1 7.0 1 J 7.0 1 -2 5500 Page 2 of 4 www.dallasfargo.com Checked By: PA QnGO CONSUFT,TAXTS, INC. 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD ** Revised Report ** Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: 337463 Location: Floor Slab Building 14(Type III) Pour 1 Report Date: 6/13/2017 Stressed Date: 5/26/17-6/7/17 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch) Second Elongation (Inch) Total Elongation (Inch) Variation in % Elongation Final Pressure (PSI) T156 89 7.13 6.42 7.84 7.1 7.1 0 5500 T157 92 7.38 6.64 8.12 7.1 7.1 1 -3 5500 T158 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T159 92 7.38 6.64 8.12 7.1 7.1 -3 5500 T160 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T161 92 7.38 6.64 8.12 7.1 7.1 -3 5500 T162 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T163 92 7.38 6.64 1 8.12 7.1 7.1 -3 5500 T164 1 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T165 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T166 92 7.38 6.64 8.12 7.1 7.1 -3 5500 T167 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T168 92 7.38 6.64 8.12 7.1 7.1 1 -3 5500 T169 92 7.38 6.64 8.12 7.0 7.0 -5 5500 T170 94 7.50 6.75 8.25 7.5 7.5 0 5500 T171 94 7.50 6.75 8.25 7.4 7.4 -2 5500 T172 94 7.50 6.75 8.25 7.4 7.4 -2 5500 T173 94 7.50 6.75 1 8.25 7.4 7.4 -2 5500 T174 1 94 7.50 6.75 8.25 7.3 7.3 -3 5500 T175 94 7.50 6.75 8.25 7.1 7.1 -5 5500 T176 94 7.50 6.75 8.25 7.1 7.1 -5 5500 T177 94 7.50 6.75 8.25 7.1 7.1 -5 5500 T178 1 35 2.63 2.37 2.89 2.5 2.5 1 -5 5500 T179 35 2.63 2.37 2.89 2.5 2.5 -5 5500 T180 35 2.63 2.37 2.89 2.5 2.5 -5 5500 T181 21 1.50 1.35 1.65 1 1.5 1 1 1.5 0 5500 T182 1 21 1.50 1.35 1.65 1 1.5 1 1 1.5 0 1 5500 Page 3 of 4 www.dallasfargo.com Checked By: e� _AAGQ 00US[1I.TANTS, INC 2324 Fabens Rd., Dallas, TX 75229 Tel. (214) 352-4100 Fax. (214) 352-4811 FIELD POST TENSION STRESSING RECORD "Revised Report ** Client: JLB Partners, LP Project Name: Grapevine Bluff Apartments Grapevine, Texas Equipment ID: Ram No.: PSL -3543 Gauge No.: 337463 Location: Floor Slab Building 14(Type III) Pour 1 Report Date: 6/13/2017 Stressed Date: 5/26/17-6/7/17 Project No: M16-4962 Calibration Date: 4/3/2017 Pump No.: 337463 Tolerance: ± 10% Cable ID Strand Mark Required Elongation (Inch) Minimum Elongation (Inch) Maximum Elongation (Inch) First Elongation (Inch Second Elongation (Inch) Total Elongation (Inch) variation in % Elon ation Final Pressure (PSI) T183 21 1.50 1.35 1.65 1.6 1.6 8 5500 T184 21 1.50 1.35 1.65 1.5 1.5 1 0 5500 T185 18 1.25 1.13 1.38 1.3 1.3 4 5500 T186 50 4.00 3.60 4.40 3.9 3.9 -3 5500 T187 1 50 1 4.00 3.60 4.40 3.8 3.8 -6 5500 T188 50 4.00 3.60 4.40 3.8 3.8 -6 5500 Revised report reflecting the correct Pour NoX 1 & elongations recorded on 6/7/17 for the * Repaired Cables. Page 4 of 4 www.dallasfargo.com Checked B Y