Loading...
HomeMy WebLinkAboutFargo Consultants, Inc. - 3/30/2017 (3)2324 Fabens Rd. Dallas, Texas 75225 FAROO aarrxur..TArrxs, INC Tel. 214-352-4100 Pax. 214-352-4811 REPORT OF FIELD COMPACTION Page 1 oft Tested For: JLB Partners, LP Date Performed: 3/30/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Gra evine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www.dallasfarpo.com Moisture -Density Relations Proctor No. Material Description Opt. MC(01o) Max DD (pcfi DD Range (%) MC Range 1 Light Gray SANDY CLAY 18.9 105.5 93 to 98 at least +4 3 Light Gray and Tan and Brown SANDY CLAY (mix) 19.3 103.1 93 to 98 at least +4 4 Dark Brown and Tan and reddish Brown CLAY (mix) 22.4 96.8 93 to 98 at least +4 5 Reddish Brown SANDY CLAY with Brown and Tan CLAY (mix) 16.8 106.1 93 to 98 at least +4 Field Test Results Test Elevation Proctor DryDensity Percent Percent No. /Lift Location No (pcfi Moisture Density 1754 12TH BLDG. PAD 8 GRID POINT P.4-50 (N. SITE GRID) 5 99.4 21.9 93.7 1755 13TH BLDG. PAD 8 GRID POINT P.5-50.1 (N. SITE GRID) 5 100.1 21.6 94.3 1756 SG BLDG. PAD 8 GRID POINT R.1-51 (N. SITE GRID) 1 98.8 23.1 93.6 1757 1ST BLDG. PAD 8 GRID POINT R.6-51.1 (N. SITE GRID) 3 96.1 24 93.2 1758 2ND BLDG. PAD 8 GRID POINT R.1-51.1 (N. SITE GRID) 5 99.4 22.8 93.7 1759 3RD BLDG, PAD 8 GRID POINT R.4-51.4 (N. SITE GRID) 5 100.2 21.6 94.4 1760 4TH BLDG. PAD 8 GRID POINT R-51.7 (N. SITE GRID) 5 98.9 21.1 93.2 1761 5TH BLDG. PAD 8 GRID POINT R.6-51.3 (N. SITE GRID) 5 99.3 21.8 93.6 1762 6TH BLDG. PAD 8 GRID POINT R.2-51.7 (N. SITE GRID) 5 98.7 22.2 93 1763 7TH BLDG. PAD 8 GRID POINT R.7-51.6 (N. SITE GRID) 3 96 23.9 93.1 1764 SG BLDG. PAD 16 GRID POINT Y.6-19.4 (S. SITE GRID) 4 92.7 26.6 95.8 1765 IST BLDG. PAD 16 GRID POINTY -19.2 (S. SITE GRID) 3 96.8 25.1 93.9 1766 2ND BLDG. PAD 16 GRID POINT Y.1-19.6 (S. SITE GRID) 3 97.3 24.4 94.4 1767 3RD BLDG. PAD 16 GRID POINT Y.6-19.7 (S. SITE GRID) 3 98.1 24.8 95.2 1768 4TH BLDG. PAD 16 GRID POINT Y.7-19.2 (S. SITE GRID) 3 98.4 24.2 95.4 1769 5TH BLDG. PAD 16 GRID POINT Y.2-19 (S. SITE GRID) 3 96,2 25 93.3 1770 6TH BLDG. PAD 16 GRID POINT Y.1-19.7 (S. SITE GRID) 4 92.6 26.5 95.7 The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Servicer www.dallasfarpo.com F0 2324 Fabens Rd. • Dallas Texas 7522: snnan a 444 Tel. 214-352-4100 Fax. 214-352-4811 REPORT OF FIELD COMPACTION Page 2 of 2 Tested For: JLB Partners, LP Date Performed: 3/30/2017 Project Name: Grapevine Bluff Apartments Fargo Job No. M16-4962 Grapevine, Texas Density and Moisture: Per ASTM D-6938 Gauge Manufacturer: Humboldt Test Mode: Direct Transmission Gauge Model: HS-5001EZ Probe Depth: 8 Inches Test Elevation Proctor DryDensity Percent Percent No. ILift Location No. (pcfi Moisture Density 1771 7TH BLDG. PAD 16 GRID POINT Y.6-19.4 (S. SITE GRID) 4 91.9 26.8 94.9 1772 8TH BLDG. PAD 16 GRID POINT Y-19.2 (S. SITE GRID) 3 97.1 23.9 94.2 1773 9TH BLDG. PAD 16 GRID POINT Y.1-19.9 (S. SITE GRID) 3 98.5 23.4 95.5 1774 10TH BLDG. PAD 16 GRID POINT Y.6-19.6 (S. SITE GRID) 3 97.2 24.5 94.3 1775 11TH BLDG. PAD 16 GRID POINT Y.7-19 (S. SITE GRID) 3 97.7 24 94.8 1776 12TH BLDG. PAD 16 GRID POINT Y.3-19.7 (S. SITE GRID) 1 100.3 23.5 95.1 1777 13TH BLDG. PAD 16 GRID POINT Y.4-19.1 (S. SITE GRID) 1 99.8 23.2 94.6 Source of Compaction Requirements: Geotechnical Report Respectfully Submitted, Fargo 5COsultants, Inc. Test result with asterisk (*), if any, indicates non-compliance to provided guidelines - Test locations are referenced using an in-house system and are approximate. Moore, CET aterials Testing Division The information and results shown on this report are for the exclusive use of the client and the client's designated recipients on file in our office. Test results are based on data obtained from specific samples tested at particular locations noted and are not indicative of the qualities of apparently identical or similar specimens, composition, performance, etc. The use of our name and test results must receive our written approval. Reports must be reproduced in their entirety. Geotechnical Engineering • Construction Materials Testing •Environmental Services www. dallasfareo. com