Loading...
HomeMy WebLinkAboutTerracon - 8/9/2018 (4)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0399 Service Date: 08/09/18 2501 E Loop 820 N Report Date: 10/04/18 Revision 2 - 56 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9041 Supplier: Argos Batch Time: 0710 Truck No.: 1031 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Plant: 104 Ticket No.: 11121792 Result Specification 7 6-9 5.9 3-6 93 50-95 80 Pump 145.2 0 Sample Date: 08/09/18 Sample Time: 0842 Sampled By: Christopher Thompson Weather Conditions: Clear Accumulative Yards: 35/342 Batch Size (cy): 9 Placement Method: Pump Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Grid Line B.8/13.4 Placement Location: Garage, Level 2, 2nd Tier, Pour 4, Received Grid Line B.8 -B.12/13-18 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 08/10/18 08/13/18 4 60,870 4,840 4 1 B 4.00 12.57 08/10/18 08/16/18 7 61,040 4,860 4 1 C 4.00 12.57 08/10/18 09/06/18 28 79,140 6,300 3 1 D 4.00 12.57 08/10/18 09/06/18 28 80,450 6,400 5 1 E 4.00 12.57 08/10/18 09/06/18 28 76,800 6,110 4 Average (28 days) 6,270 1 F 08/10/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Thompson Reported To: Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0399 Service Date: 08/09/18 2501 E Loop 820 N Report Date: 10/04/18 Revision 2 - 56 -day results Fort Worth, TX 76118-6978 Task: Parkine Garaue 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 08/09/18 Sample Time: 0943 Sampled By: Christopher Thompson Mix ID: 9041 Weather Conditions: Clear Supplier: Argos Accumulative Yards: 116/342 Batch Size (cy): 9 Batch Time: 0832 Plant: 104 Placement Method: Pump Truck No.: 5089 Ticket No.: 10439643 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Grid Line B.9/14.3 Test Result Specification Placement Location: Garage, Level 2, 2nd Tier, Pour 4, Slump (in): 7 6-9 Grid Line B.8 -B.12/13-18 Air Content (%): 6.0 3-6 Concrete Temp. (F): 94 50-95 Ambient Temp. (F): 83 Plastic Unit Wt. (pcf): 142.0 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 2 A 4.00 12.57 08/10/18 08/13/18 4 51,870 4,130 5 2 B 4.00 12.57 08/10/18 08/16/18 7 55,600 4,420 3 2 C 4.00 12.57 08/10/18 09/06/18 28 64,020 5,090 3 2 D 4.00 12.57 08/10/18 09/06/18 28 68,550 5,460 4 2 E 4.00 12.57 08/10/18 09/06/18 28 67,590 5,380 5 Average (28 days) 5,310 2 F 08/10/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Thompson Reported To: Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0399 Service Date: 08/09/18 2501 E Loop 820 N Report Date: 10/04/18 Revision 2 - 56 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 08/09/18 Sample Time: 1137 Sampled By: Christopher Thompson Mix ID: 9041 Weather Conditions: Clear Supplier: Argos Accumulative Yards: 250/342 Batch Size (cy): 9 Batch Time: 1041 Plant: 104 Placement Method: Pump Truck No.: 5058 Ticket No.: 10439662 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Grid Line B.10/ 17.5 Test Result Specification Placement Location: Garage, Level 2, 2nd Tier, Pour 4, Slump (in): 8 6-9 Grid Line B.8 -B.12/13-18 Air Content (%): 4.4 3-6 Concrete Temp. (F): 95 50-95 Ambient Temp. (F): 87 Plastic Unit Wt. (pcf): 139.6 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 3 A 4.00 12.57 08/10/18 08/13/18 4 43,930 3,500 3 3 B 4.00 12.57 08/10/18 08/16/18 7 49,060 3,900 5 3 C 4.00 12.57 08/10/18 09/06/18 28 58,630 4,670 3 3 D 4.00 12.57 08/10/18 09/06/18 28 59,290 4,720 4 3 E 4.00 12.57 08/10/18 09/06/18 28 59,010 4,700 4 Average (28 days) 4,690 3 F 4.00 12.57 08/10/18 10/04/18 56 64,370 5,120 4 Initial Cure: Outside Final Cure: Moist Room Comments: Compressive strength of 56 day cylinders complies with the specified strength. Set 3 did not meet the required 28 day compressive strength of 5,000 psi. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Thompson Reported To: Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0399 Service Date: 08/09/18 2501 E Loop 820 N Report Date: 10/04/18 Revision 2 - 56 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 08/09/18 Sample Time: 1212 Sampled By: Christopher Thompson Mix ID: 9041 Weather Conditions: Clear Supplier: Argos Accumulative Yards: 322/340 Batch Size (cy): 9 Batch Time: 1113 Plant: 104 Placement Method: Pump Truck No.: 5100 Ticket No.: 10439667 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Grid Line B.11/17.8 Test Result Specification Placement Location: Garage, Level 2, 2nd Tier, Pour 4, Slump (in): 7 6-9 Grid Line B.8 -B.12/13-18 Air Content (%): 5.1 3-6 Concrete Temp. (F): 95 50-95 Ambient Temp. (F): 90 Plastic Unit Wt. (pcf): 144.4 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 4 A 4.00 12.57 08/10/18 08/13/18 4 51,010 4,060 4 4 B 4.00 12.57 08/10/18 08/16/18 7 53,750 4,280 4 4 C 4.00 12.57 08/10/18 09/06/18 28 68,460 5,450 5 4 D 4.00 12.57 08/10/18 09/06/18 28 68,940 5,490 4 4 E 4.00 12.57 08/10/18 09/06/18 28 70,240 5,590 3 Average (28 days) 5,510 4 F 08/10/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Thompson Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 4 of 4 Distribution Page Irerracon Report Number: 95181011.0399 Service Date: 08/09/18 2501 E Loop 820 N Report Date: 10/04/18 Revision 2 - 56 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Brad Scheckelhoff (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Jaehyung Ahn (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva