Loading...
HomeMy WebLinkAboutTerracon - 9/13/2018 (2)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0453A Service Date: 09/13/18 2501 E Loop 820 N Report Date: 10/26/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 5,000 psi @ Mix ID: 9727 Supplier: ARGOS Batch Time: 1344 Truck No.: 9007 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information 28 days Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Plant: 123 Ticket No.: 12332522 Result Specification 7 5-7 4.2 3-6 91 86 147.6 Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 4.00 12.57 1 B 4.00 12.57 1 C 4.00 12.57 1 D 4.00 12.57 Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 09/20/18 7 52,450 10/11/18 28 66,470 10/11/18 28 64,070 10/11/18 28 66,090 Average (28 days) 09/13/18 Sample Time: 1440 Kristopher McGarry Clear, low wind 7/14 Batch Size (cy): 7 Bucket & lift 0 0 Column between 3rd and 4th level parking @ P10/16 Columns between 3rd and 4th level of parking @ P10/16, P11/16, P12/16, P10/17, P12/17, P11/17 and walls on 3rd level parking from P 11-P 12 & P5 -P6 on lone 18, P11 -P13 on line 15 Compressive Strength Fracture Tested (psi) Type By 4,170 4 5,290 2 5,100 4 5,260 3 5,220 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Kristopher McGarry Reported To: David Saiter w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0453A Service Date: 09/13/18 2501 E Loop 820 N Report Date: 10/26/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Jaehyung Ahn (1) Manhattan Construction Co, Klint Robertson (1) Manhattan Construction Co, Matthew Powell (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva