Loading...
HomeMy WebLinkAboutTerracon - 10/8/2018 (3)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0486 Service Date: 10/08/18 2501 E Loop 820 N Report Date: 10/26/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9041 Supplier: Argos Batch Time: 0800 Plant: 104 Truck No.: 5092 Ticket No.: 10442465 Field Test Data Test Result Specification Slump (in): 8 6-9 Air Content (%): 4.1 3-6 Concrete Temp. (F): 91 50-104 Ambient Temp. (F): 77 10 Plastic Unit Wt. (pcf): 145.6 Sample Location: Yield (Cu. Yds.): Placement Location: SOG: Lvl 4 ramp. P8 -P12/16-17. see Laboratory Test Data attachments. D Set Specimen Avg Diam. Area Date Date No. ID (in) (sq in) Received Tested Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information A Sample Date: 10/08/18 Sample Time: 0820 Sampled By: Norman Noel Weather Conditions: Cloudy/windy Accumulative Yards: 45/126 Batch Size (cy): 9 Placement Method: Pump Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: SOG: P8.4/16.6. Sample 1. Placement Location: SOG: Lvl 4 ramp. P8 -P12/16-17. see 28 attachments. Age at Maximum Compressive Test Load Strength Fracture Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 10/09/18 10/10/18 2 68,120 5,420 4 1 B 4.00 12.57 10/09/18 10/15/18 7 84,620 6,730 5 1 C 4.00 12.57 10/09/18 11/05/18 28 1 D 4.00 12.57 10/09/18 11/05/18 28 1 E 4.00 12.57 10/09/18 11/05/18 28 1 F 10/09/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Norman Noel Reported To: David Saiter w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0486 Service Date: 10/08/18 2501 E Loop 820 N Report Date: 10/26/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9041 Supplier: Argos Batch Time: 0948 Plant: 104 Truck No.: 5097 Ticket No.: 10442480 Field Test Data Test Result Specification Slump (in): 8 1/2 6-9 Air Content (%): 4.1 3-6 Concrete Temp. (F): 96 50-104 Ambient Temp. (F): 76 10 Plastic Unit Wt. (pcf): 144.8 Sample Location: Yield (Cu. Yds.): Placement Location: SOG: Lvl 4 ramp. P8 -P12/16-17. see Laboratory Test Data attachments. D Set Specimen Avg Diam. Area Date Date No. ID (in) (sq in) Received Tested Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information A Sample Date: 10/08/18 Sample Time: 1030 Sampled By: Norman Noel Weather Conditions: Cloudy/sprinkling Accumulative Yards: 126/126 Batch Size (cy): 9 Placement Method: Pump Water Added Before (gal): 10 Water Added After (gal): 0 Sample Location: SOG: P10.2/16.2. Smaple 2. Placement Location: SOG: Lvl 4 ramp. P8 -P12/16-17. see 28 attachments. Age at Maximum Compressive Test Load Strength Fracture Tested (days) (lbs) (psi) Type By 2 A 4.00 12.57 10/09/18 10/10/18 2 68,980 5,490 2 2 B 4.00 12.57 10/09/18 10/15/18 7 82,430 6,560 4 2 C 4.00 12.57 10/09/18 11/05/18 28 2 D 4.00 12.57 10/09/18 11/05/18 28 2 E 4.00 12.57 10/09/18 11/05/18 28 2 F 10/09/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Norman Noel Reported To: David Saiter w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 2 of 2 Grapevine Main Phase 1 Site Plan: Report Number: 95181011.0486 1rerracon 815 South Main Street Technician: Norman Noel 2501 E Loop 820 N Grapevine, TX 76051 Date: 10/08/18 Fort Worth, TX 76118-6978 Scale: Not to Scale 817-268-8600 Reg No: F-3272 BDOOOP, 08-24-13, Rev.O Distribution Page Irerracon Report Number: 95181011.0486 Service Date: 10/08/18 2501 E Loop 820 N Report Date: 10/26/18 Revision 1 - 7 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Jaehyung Ahn (1) Manhattan Construction Co, Klint Robertson (1) Manhattan Construction Co, Matthew Powell (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva