Loading...
HomeMy WebLinkAboutTerracon - 10/11/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0491 Service Date: 10/11/18 2501 E Loop 820 N Report Date: 10/26/18 Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 10/11/18 Sample Time: 1550 Sampled By: Kristopher McGarry Mix ID: 9041 Weather Conditions: Clear, low wind Supplier: ARGOS Accumulative Yards: 9/34 Batch Size (cy): 9 Batch Time: 1450 Plant: 123 Placement Method: Bucket & lift Truck No.: 6288 Ticket No.: 12333343 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Beam on level 4 of parking @ P13/16 Test Result Specification Placement Location: Beams on level 4 parking, line P 13 Slump (in): 9 5-9 from 15-18 and line 18 from P12 -P13 Air Content (%): 3.0 3-6 Concrete Temp. (F): 73 Ambient Temp. (F): 68 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 10/15/18 4 66,500 5,290 4 1 B 4.00 12.57 10/18/18 7 73,090 5,820 3 1 C 4.00 12.57 11/08/18 28 1 D 4.00 12.57 11/08/18 28 1 E 4.00 12.57 11/08/18 28 Initial Cure: Outside Final Cure: Moist Room Comments: Not tested for plastic unit weight. 3 day break requested after testing and samples made. One 3 day break, one 7 day break, three 28 day breaks requested by David with Manhattan. Samples Made By: Terracon Services: Terracon Rep.: Kristopher McGarry Reported To: David w/ Manhattan Contractor: Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0491 Service Date: 10/11/18 2501 E Loop 820 N Report Date: 10/26/18 Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Jaehyung Ahn (1) Manhattan Construction Co, Klint Robertson (1) Manhattan Construction Co, Matthew Powell (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva