HomeMy WebLinkAboutTerracon - 10/18/2018 (3)POST -TENSION OBSERVATIONS REPORT
Report Number: 95181011.0496
Irerracon
Service Date: 10/18/18 2501 E Loop 820 N
Report Date: 11/01/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: Shop drawings R05-lA,1B,1C,1D,lE,1F,1G,1H,1K,1L,1M,1N,1R/ Various Details/ 5-30-18; Post
Tension drawings PT 19,20,21,22,23/ Various Details/ 8-8-18
Locations/Items Observed: Slab on Deck Parking Garage Level 5 (P1 -P5/17-18, P1 -P6/16-17, P1 -P4/15-16)
Test Method: Visual Observation
10:4201 A 9101 Z111111:144 ZIMIN 1161101
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Length and Shape
X
Column Tie Spacing &
Type
X
Bar and Cable Size
X
Proper Placement
X
Stirrup Spacing & Type
X
Bar and Cable Grade
X
Properly Tied
X
Cables Properly Wrapped
X
Rebar and Cables Clean
X
Dowel Bars in Place
X
Mechanical Splices
N/A
Trash & Debris Removed
X
Proper Supports
X
Lapped Splices
X
Number of Bars and
Cables
X
Proper Cover/Clearance
X
Proper Drape of Cables
X
Discrepancies/Comments:
Any discrepancies found were corrected prior to completion of this observation.
1. Clearance issues at forms along upturn beam at P1 -P4/18
2. Clearance issues around various columns
3. Detail of upturn beam at stair well P1 -P2.2/15 was different than what was installed, when mentioned to David with Manhattan, it
was verbally told to Terracon that the detail may have changed and the drawings being used are not most recent.
4. Trash and debris was observed in the forms and was in the process of being cleaned up but was not completely done by end of
observation.
5. Missing rebar around stair well area, installed.
6. Missing #9 bar at beam at P1/17, installed.
7. Missing #8 rebar at beam P3/16-17, installed.
8. Adjusted chairs throughout area for proper drape.
Services:
Terracon Rep.: Daniel Wright
Reported To: David w/ Manhattan, Omar w/ Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 1 of 2
POST -TENSION OBSERVATIONS REPORT
Report Number: 95181011.0496
Irerracon
Service Date: 10/18/18 2501 E Loop 820 N
Report Date: 11/01/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Proiect Number: 95181011
9. Any exposed cables where taped up.
There were dowel bars at the construction joint P4/15-16, that were not installed prior to end of observation. Rebar was stored below, and
the crane was occupied with other needs.
Services:
Terracon Rep.: Daniel Wright
Reported To: David w/ Manhattan, Omar w/ Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 2 of 2
Distribution Paae
Report Number: 95181011.0496
Service Date: 10/18/18
Report Date: 11/01/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Jaehyung Ahn
(1) Manhattan Construction Co, Klint Robertson
(1) Manhattan Construction Co, Matthew Powell
(1) Manhattan Construction Co, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600