Loading...
HomeMy WebLinkAboutTerracon - 11/1/2018POST -TENSION STRESSING REPORT Report Number: 95181011.0514 Irerracon Service Date: 11/01/18 2501 E Loop 820 N Report Date: 11/04/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension Stressing Operations on Level 5 Upturn Beams. Please note that tendons highlighted in yellow are outside of the tolerance of +/-7%. See attached sheets for recorded data. Services: Terracon Rep.: Adam Wood Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION CALC TENDON ELONG End 1 End 2 MARK (in.) (in.) (in.) -7% Total Recorded (in.) 7% Restress (psi or kips) TOTAL (in.) % (+/-) REMARKS M007A 13 13.75 12.09 13.75 13.91 13.75 6% M007B 13 14 12.09 14.00 13.91 14 8% M007C 13 13.875 12.09 13.88 13.91 13.875 7% M007D 13 13.75 12.09 13.75 13.91 13.75 6% M007E 13 13.875 12.09 13.88 13.91 13.875 7% M007F 13 13.875 12.09 13.88 13.91 13.875 7% SHEETTITLE: ELONGATION RECORDS Jack #1:MR314 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Manhattan Jack #1 PSI: 7000 LEVEL/POUR: Level 5 Upturn Beams Jack #2 PSI: DATE: 11/1/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 1 OF 1