HomeMy WebLinkAboutTerracon - 10/26/2018GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
On October 261, 2018, a representative of Terracon was present to observe the repairs of the concrete in the parking garage. Upon arrival
the following areas were being prepared/or already prepared:
1.) Underside of beam at gridlines P5/16-17
2.) Bottom of elevated slab at gridlines P8 -P9/15-15.5
3.) Bottom of beam at the corner of column P2/16
4.) Bottom of elevated slab at gridlines P3.5/15.5
5.) Bottom of elevated slab at gridlines P6 -P7/16-17
6.) Bottom of elevated slab at gridlines P5 -P6/16.7-17
7.) Bottom of elevated slab at gridlines P5 -P6/16-16.5
8.) Bottom of beam at gridlines P6/16.4-16.7
The means of preparing these areas included an angle grinder and a demolition hammer. At the time of this observation tapcon screws as
required by the field report from Walker Consultants were not yet installed. Attached, are a few pictures of the areas being prepared for
upcoming repairs. All pictures are taken from the ground level looking up to the bottom of the second level. The numbers refer to the list
above.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 1 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 2 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 3 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sc000i, 10-16-13, Rev.lo Page 4 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sc0001,10-16-13, Rev.10 Page 5 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 6 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine, TX 76051
Project Number: 95181011
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 7 of 8
GENERAL OBSERVATION REPORT
Report Number: 95181011.0507
Irerracon
Service Date: 10/26/18 2501 E Loop 820 N
Report Date: 11/04/18 Fort Worth, TX 76118-6978
817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
Services: Travel to the project site to perform testing/observation services as requested.
Terracon Rep.: Taylor Henson
Reported To: Matt w/ Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�,Tuipa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
sC0001, 10-16-13, Rev.10 Page 8 of 8
Distribution Paae
Report Number: 95181011.0507
Service Date: 10/26/18
Report Date: 11/04/18
Task:
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Jaehyung Ahn
(1) Manhattan Construction Co, Klint Robertson
(1) Manhattan Construction Co, Matthew Powell
(1) Manhattan Construction Co, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600