HomeMy WebLinkAboutTerracon - 10/31/2018POST -TENSION OBSERVATIONS REPORT
Irerracon
Report Number: 95181011.0512
Service Date: 10/31/18 2501 E Loop 820 N
Report Date: 11/05/18 Fort Worth, TX 76118-6978
Task: Parking Garage 817-268-8600 Reg No: F-3272
Client Project
Coury Hospitality Grapevine Main Phase 1
Attn: Mark Brooks 815 South Main Street
7134 S Yale, Ste 400 Grapevine, TX 76051
Tulsa, OK 74136
Project Number: 95181011
PROJECT DATA
Drawings Utilized: PT19 through PT23, R05 -1A, R05 -1B, R05 -1C, R05 -1D, R05 -1E, R05 -1F, R05 -1H, R05 -1J, R05 -
1P
Locations/Items Observed: Level 5 Pour 18
Test Method: Visual Observation
IN4101A9101Z111111 194:1%r1C6LJ
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
ITEMS OBSERVED
CORRECT
INCORRECT
Placing Drawings
Approved
X
Length and Shape
X
Column Tie Spacing &
Type
Bar and Cable Size
X
Proper Placement
X
Stirrup Spacing & Type
X
Bar and Cable Grade
X
Properly Tied
X
Cables Properly Wrapped
X
Rebar and Cables Clean
X
Dowel Bars in Place
X
Mechanical Splices
Trash & Debris Removed
X
Proper Supports
X
Lapped Splices
X
Number of Bars and
Cables
X
Proper Cover/Clearance
X
Proper Drape of Cables
X
Discrepancies/Comments:
The following discrepancies were corrected prior to concrete placement. Discrepancies are to be corrected prior to concrete placement.
-Missing Rebar
-Spacing of Rebar
-Not properly tied
Services:
Terracon Rep.: Adam Wood
Reported To: David Saiter w/ Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list.
Reviewed By:
�njupa
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940004, 07-01-12, Rev.0 Page 1 of 1
Distribution Page Irerracon
Report Number: 95181011.0512
Service Date: 10/31/18 2501 E Loop 820 N
Report Date: 11/05/18 Fort Worth, TX 76118-6978
Task: Parking Garage 817-268-8600
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) Construction Management Group of Fair Oaks CA, Blake Cearley
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Co, Ben Jensen
(1) Manhattan Construction Co, Chase Pritchard
(1) Manhattan Construction Co, Daniel Rideau
(1) Manhattan Construction Co, David Saiter
(1) Manhattan Construction Co, Frederick Moore
(1) Manhattan Construction Co, Jaehyung Ahn
(1) Manhattan Construction Co, Klint Robertson
(1) Manhattan Construction Co, Matthew Powell
(1) Manhattan Construction Co, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva