Loading...
HomeMy WebLinkAboutTerracon - 11/9/2018 (4)POST -TENSION STRESSING REPORT Report Number: 95181011.0536 Irerracon Service Date: 11/08/18 2501 E Loop 820 N Report Date: 11/09/18 Fort Worth, TX 76118-6978 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension Stressing Operations on Level 5 Upturn Beams. Please note that tendons highlighted in yellow are outside of the tolerance of +/-7%. See attached sheets for recorded data. Services: Terracon Rep.: Adam Wood Reported To: David Saiter w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. sC0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION CALC TENDON ELONG MARK (in.) End 1 End 2 (in.) (in.) -7% Total Recorded (in.) Restress (psi or 7% kips) TOTAL (in.) % (+/-) REMARKS M102A 3 2.5 2.79 2.50 3.21 2.5 -17% See below M102B 3 2.75 2.79 2.75 3.21 2.75 -8% See below M102C 3 2.75 2.79 2.75 3.21 2.75 -8% See below M102D 3 2.75 2.79 2.75 3.21 2.75 -8% See below M102E 3 3.125 2.79 3.13 3.21 3.125 4% M102F 3 3 2.79 3.00 3.21 3 0% M102G 3 2.75 2.79 2.75 3.21 2.75 -8% See below M104A 1.5 1.25 1.40 1.25 1.61 1.25 -17% See below M104B 1.5 1.375 1.40 1.38 1.61 1.375 -8% See below M104C 1.5 1.25 1.40 1.25 1.61 1.25 -17% See below M104D 1.5 1.375 1.40 1.38 1.61 1.375 -8% See below M104E 1.5 1.375 1.40 1.38 1.61 1.375 -8% See below M104F 1.5 1.375 1.40 1.38 1.61 1.375 -8% See below M104G 1.5 1.5 1.40 1.50 1.61 1.5 0% Tendons highlighted in yellow were observed to be outside the tolerance of +/-7%. SHEETTITLE: ELONGATION RECORDS Jack #1:MR567 JOB/LOCATION: Grapevine Main Phase I Jack#2: CONTRACTOR: Manhattan Jack #1 PSI: 7000 LEVEL/POUR: Level 5 Upturn Beams Jack #2 PSI: DATE: 11/8/18 1 STRESS BY: K & A Rebar IVERIFIED BY: Adam Wood PAGE 1 OF 1 Distribution Paae Report Number: 95181011.0536 Service Date: 11/08/18 Report Date: 11/09/18 Task: Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) Construction Management Group of Fair Oaks CA, Blake Cearley (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Jaehyung Ahn (1) Manhattan Construction Co, Klint Robertson (1) Manhattan Construction Co, Matthew Powell (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600