Loading...
HomeMy WebLinkAboutTerracon - 11/14/2018DRILLED SHAFT OBSERVATION REPORT Report Number: 95181011.0526 Service Date: 11/07/18 Irerracon MM 2501 E Loop 820 N Report Date: 11/14/18 Fort Worth, TX 76118-6978 Task: Hotel 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine, TX 76051 Project Number: 95181011 On 11/7/18, a Terracon representative was present at the above referenced project to observe the installation of the drilled straight shaft piers. Information regarding pier location and size of shaft diameter, depth of penetration, and length and size of the reinforcing steel were also recorded. Additionally, samples of the fresh concrete placed for the piers were also sampled and are covered under Terracon Report 95181011.0527. The results of the pier observations are attached. NOTE: Elevation data provided by others or taken from plans. Services: Terracon Rep.: Daniel Blocker Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. se0001, 10-16-13, Rev.10 Page 1 of 1 DRILLED PIER OBSERVATION Report Number: 95181011.0526 Service Date: November 7, 2018 Client: Brooks Hospitality Consulting Corp Attn: Mark Brooks 206 Oldenwood Ct Colleyville, TX 76034 Driller: CMG 1 rerracon 2501 E. Loop 820 North Fort Worth, Texas 76118 817-268-8600 Reg No: F-3272 Project: Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project No.: 95181011 Technician: Dan Blocker Pier Identification B.7/9.5 B.7/10.2 B.7/10.8 B.7/11.5 Pier Diameter (in.) 30 30 30 30 Top of Ground Elevation (ft.) 634.76 634.64 634.91 635.08 Top of Pier Elevation (ft.) 632.59 632.59 632.59 632.59 Depth to Bearing Stratum from Ground (ft.) 30.0 31.0 30.0 30.0 Depth of Pier from Ground (ft.) 41.0 41.0 40.3 40.2 Required Penetration (ft.) 10.0 10.0 10.0 10.0 Actual Penetration (ft.) 11.0 10.0 10.3 10.2 Depth from Top of Concrete (ft.) 38.83 39.05 37.98 37.71 Condition of Bottom (wet or dry) Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Casing Diameter (in.) 32 32 32 32 Cased Depth (ft.) 30.0 31.0 30.0 30.0 Number of Vertical Bars (ea.) 8 8 8 8 Reinforcing Bar Size (#) 7 7 7 7 Length of Vertical Bars (ft.) 38.33 38.60 37.48 37.16 Time Drilling was Completed 9:30 AM 10:30 AM 1:15 PM 3:00 PM Time Concrete was Placed 12:15 PM 1:30 PM 4:00 PM 4:45 PM Page 1 of 1 Distribution Paae Report Number: 95181011.0526 Service Date: 11/07/18 Report Date: 11/14/18 Task: Hotel Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Co, Ben Jensen (1) Manhattan Construction Co, Chase Pritchard (1) Manhattan Construction Co, Daniel Rideau (1) Manhattan Construction Co, David Saiter (1) Manhattan Construction Co, Frederick Moore (1) Manhattan Construction Co, Klint Robertson (1) Manhattan Construction Co, Matthew Powell (1) Manhattan Construction Co, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva Irerracon 2501 E Loop 820 N Fort Worth, TX 76118-6978 817-268-8600