Loading...
HomeMy WebLinkAboutTerracon - 11/19/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0495 Service Date: 10/17/18 2501 E Loop 820 N Report Date: 11/19/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Material Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9727 Supplier: Argos Batch Time: 1130 Plant: 104 Truck No.: 5064 Ticket No.: 10442700 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 7 5-7 3.0 3-6 78 50-95 60 A 146.5 12.57 Laboratory Test Data Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 4.00 12.57 1 B 4.00 12.57 1 C 4.00 12.57 1 D 4.00 12.57 Project Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 10/24/18 7 69,960 11/14/18 28 82,990 11/14/18 28 80,010 11/14/18 28 82,620 Average (28 days) 10/17/18 Sample Time: 1200 Jeremy Washington clear 10/10 Batch Size (cy): 10 Bucket & lift 0 0 Column P13/ 16.7 Columns 4th -5th level P13/15.3 P13/15.7 P13/16, P13/16.4, P13/16.7 Compressive Strength Fracture Tested (psi) Type By 5,570 3 6,600 4 6,370 3 6,570 2 6,520 1 E Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jeremy Washington Reported To: David w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0495 Service Date: 10/17/18 2501 E Loop 820 N Report Date: 11/19/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva