HomeMy WebLinkAboutTerracon - 11/26/2018CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon
Report Number: 95181011.0505
Service Date: 10/25/18 2501 E Loop 820 N
Report Date: 11/26/18 Revision 2 - 28 -day results Fort Worth, TX 76118-6978
Task: Hotel 817-268-8600 Ree No: F-3272
Client Project
Coury Hospitality
Attn: Mark Brooks
7134 S Yale, Ste 400
Tulsa, OK 74136
Grapevine Main Phase 1
815 South Main Street
Grapevine, TX 76051
Project Number: 95181011
Material Information Sample Information
Specified Strength: 7,000 psi @ 28 days
Mix ID:
9908
Supplier:
Argos
Batch Time:
1218
Truck No.:
5120
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Plant: 123
Ticket No.: 12333580
Result
Specification
5
3-5
1.9
0-3
75
50-95
60
Pump
151.0
0
Sample Date:
10/25/18 Sample Time: 1315
Sampled By:
Jeremy Washington
Weather Conditions:
Clear
Accumulative Yards:
9/70 Batch Size (cy): 9
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Grid Line 9.8/G.6 going East
Placement Location:
Hotel, Northside, Grade Beams, Grid
Received
Line 7.6 -9.8/C.5 -G.6
Laboratory Test Data
Strength
Fracture Tested
Age at
Maximum
Set
Specimen
Avg Diam.
Area
Date
Date
Test
Load
No.
ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
1
A
4.00
12.57
10/26/18
10/26/18
1
50,030
1
B
4.00
12.57
10/26/18
10/29/18
4
99,890
1
C
4.00
12.57
10/26/18
11/01/18
7
108,260
1
D
4.00
12.57
10/26/18
11/22/18
28
131,460
1
E
4.00
12.57
10/26/18
11/22/18
28
138,950
1
F
4.00
12.57
10/26/18
11/22/18
28
137,700
Average
(28 days)
1
G
10/26/18
Hold
Initial
Cure: Outside
Final Cure: Moist Room
Compressive
Strength
Fracture Tested
(psi)
Type By
3,980
4
7,950
3
8,620
4
10,460
2
11,060
4
10,960
2
10,830
Comments: Average compressive strength of 28 day cylinders complies with the specified strength.
Samples Made By: Terracon
Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength
samples.
Terracon Rep.: Jeremy Washington
Reported To: David with Manhattan
Contractor: Manhattan
Report Distribution:
See attached distribution list. Reviewed By:
Senior Project Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Paae
Report Number: 95181011.0505
Service Date: 10/25/18
Report Date: 11/26/18 Revision 2 - 28 -day results
Task: Hotel
Distribution List
(1) Coury Hospitality, Mark Brooks
(1) AECC Inc, Lee Ledet
(1) ArchiTexas, Michael Karnowski
(1) City of Grapevine TX, Curtis A Bergthold
(1) City of Grapevine TX, Hans Strayer
(1) City of Grapevine TX, Paul M Lee
(1) City of Grapevine TX, Scott Williams
(1) City of Grapevine TX, sbatte@grapevinetexas.gov
(1) JQ Engineering, Mike Oler
(1) Manhattan Construction Company, Ben Jensen
(1) Manhattan Construction Company, Chase Pritchard
(1) Manhattan Construction Company, Daniel Rideau
(1) Manhattan Construction Company, David Saiter
(1) Manhattan Construction Company, Frederick Moore
(1) Manhattan Construction Company, Klint Robertson
(1) Manhattan Construction Company, Matthew Powell
(1) Manhattan Construction Company, Robert Montgomery
(1) Walker Consultants, Martha M. Villanueva
Irerracon
2501 E Loop 820 N
Fort Worth, TX 76118-6978
817-268-8600