Loading...
HomeMy WebLinkAboutTerracon - 11/28/2018 (12)POST -TENSION OBSERVATIONS REPORT Irerracon Report Number: 95181011.0555 Service Date: 11/17/18 2501 E Loop 820 N Report Date: 11/28/18 Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Project Number: 95181011 PROJECT DATA Drawings Utilized: Shop drawings R06-lA,1B,1C,1D,lE,1F,1G,1H,1J,1K,1L,1M,1N,1P,1Q/ Various Details/ 5-30-18; PT drawings PT, 24,24.1,25,26,27,28/ Various Details/ 7-31-18 Locations/Items Observed: Slab on Deck, Section 20, Level 6 Parking Garage P4 -P10.5/ 15-16; P5 -P10.5/ 17-18 Test Method: Visual Observation 10:4201A9101Z111111 194:1%r1[6LJ ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type N/A Bar and Cable Size X Proper Placement X Stirrup Spacing & Type X Bar and Cable Grade X Properly Tied X Cables Properly Wrapped X Rebar and Cables Clean X Dowel Bars in Place X Mechanical Splices N/A Trash & Debris Removed X Proper Supports X Lapped Splices X Number of Bars and Cables X Proper Cover/Clearance X Proper Drape of Cables X Discrepancies/Comments: Any discrepancies found were not corrected prior to completion of this observation. 1. In both areas, the 2#5 bars at the diaphragm chord were not installed. 2. At CJ P10.5/17-18, breaking bar supports at post tension anchors were not installed. 3. Form work along P5 -P10.5/ 17 was not finished being installed. Cable ends along here have not been nailed into place and some cables are not laid out properly across. Services: Terracon Rep.: Daniel Wright Reported To: Klint w/ Manhattan Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �njupa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940004, 07-01-12, Rev.0 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0555 Service Date: 11/17/18 2501 E Loop 820 N Report Date: 11/28/18 Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva