Loading...
HomeMy WebLinkAboutTerracon - 12/11/2018 (23)POST -TENSION STRESSING REPORT Irerracon Report Number: 95181011.0579 Service Date: 12/08/18 2501 E Loop 820 N Report Date: 12/11/18 Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Reg No: F-3272 Client Project Coury Hospitality Grapevine Main Phase 1 Attn: Mark Brooks 815 South Main Street 7134 S Yale, Ste 400 Grapevine, TX 76051 Tulsa, OK 74136 Proiect Number: 95181011 On this date, a representative of Terracon arrived at the above referenced jobsite as scheduled to observe Post Tension Stressing Operations on Level 6 Upturn Beams. Please note that tendons highlighted in yellow are outside of the tolerance of +/-7%. See attached sheets for recorded data. Services: Terracon Rep.: Adam Wood Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: �,Tuipa Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. se0001, 10-16-13, Rev.10 Page 1 of 1 MEASURED ELONGATION TENDON MARK Req Force ELONG (psi or End 1 (in.) Kips) (in.) End 2 (in.) Total Recorded -7% (in.) 7% Restress (psi or TOTAL kips) (in.) % (+/-) REMARKS M022A 13 14 121/8 14 137/8 14 8% M022B 13 137/8 121/8 137/8 137/8 137/8 7% M022C 13 137/8 121/8 137/8 137/8 137/8 7% M022D 13 141/2 121/8 144/8 137/8 141/2 12% M022E 13 14 121/8 14 137/8 14 8% M022F 13 141/8 121/8 141/8 137/8 141/8 9% M107A 13/4 15/8 15/8 15/8 17/8 15/8 -7% M107B 13/4 15/8 15/8 15/8 17/8 15/8 -7% M107C 13/4 15/8 15/8 15/8 17/8 15/8 -7% M107D 13/4 15/8 15/8 15/8 17/8 15/8 -7% M107E 13/4 13/4 15/8 16/8 17/8 13/4 0% M107F 13/4 11/2 15/8 14/8 17/8 11/2 -14% M107G 13/4 15/8 15/8 15/8 17/8 15/8 -7% SHEETTITLE: ELONGATION RECORDS Jack#1: MR314 JOB/LOCATION: Grapevine Main Phase I Jack #2: CONTRACTOR: Manhattan Jack #1 PSI: 7000 LEVEL/POUR: Level 6 Upturn Beams Jack #2 PSI: DATE: 12/8/18 1 ISTRESS BY: K&A Rebar IVERIFIED BY: Adam Wood PAGE 1 of 1 Distribution Page Irerracon Report Number: 95181011.0579 Service Date: 12/08/18 2501 E Loop 820 N Report Date: 12/11/18 Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva