Loading...
HomeMy WebLinkAboutTerracon - 12/28/2018 (2)CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0563 Service Date: 11/28/18 2501 E Loop 820 N Report Date: 12/28/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 9727 Supplier: Argos Batch Time: 1525 Plant: 123 Truck No.: 6284 Ticket No.: 12334704 Field Test Data Test Result Specification Slump (in): 61/2 5-7 Air Content (%): 9.0 * 3-6 Concrete Temp. (F): 64 50-95 Ambient Temp. (F): 1 C Plastic Unit Wt. (pcf): 140.0 Garage Columns, 6th Level, Grid Yield (Cu. Yds.): 42.4 * = Field Test Results do not meet project specifications. Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 A 4.00 1 B 4.00 1 C 4.00 Initial Cure: Outside Area Date (sq in) Received 12.57 11/29/18 12.57 11/29/18 12.57 11/29/18 Sample Date: 11/28/18 Sample Time: 1600 Sampled By: Daniel Blocker Weather Conditions: Clear Accumulative Yards: 8 Batch Size (cy): 8 Placement Method: Pump Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Upturn Beam, Grid Line P9 -P11/15 Placement Location: Garage Columns, 6th Level, Grid Line P1/15, P1/17.6, P7/15, P8/15; Upturn Beam, Grid Line P9 -P11/15; Bumper Wall, Grid Line P3 -P4/18 Age at Maximum Date Test Load Tested (days) (lbs) 12/05/18 7 66,240 12/26/18 28 77,000 12/26/18 28 77,440 Final Cure: Moist Room Average (28 days) Compressive Strength Fracture Tested (psi) Type By 5,270 5 6,130 3 6,160 5 6,140 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. High air was sampled and placed. One bag air minus was added and resample same truck. Notified David Saiter @ 1610 by text and phone call. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Pagel of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0563 Service Date: 11/28/18 2501 E Loop 820 N Report Date: 12/28/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: Age at Maximum Set Sampled By: Mix ID: 9727 Area Date Weather Conditions: Supplier: Argos Load No. Accumulative Yards: Batch Time: 1525 Plant: 123 Placement Method: Truck No.: 6284 Ticket No.: 12334704 Water Added Before (gal): Field Test Data 12.57 11/29/18 Water Added After (gal): 5 63,340 2 Sample Location: Test Result Specification Placement Location: Slump (in): 61/2 5-7 C Air Content (%): 8.0 * 3-6 12/26/18 Concrete Temp. (F): 64 50-95 D Ambient Temp. (F): 12.57 11/29/18 12/26/18 Plastic Unit Wt. (pcf): 140.0 2 E Yield (Cu. Yds.): 42.4 11/29/18 12/26/18 * = Field Test Results do not meet project specifications. Laboratory Test Data Strength Fracture Tested Age at Maximum Set Specimen Avg Diam. Area Date Date Test Load No. ID (in) (sq in) Received Tested (days) (lbs) 2 A 4.00 12.57 11/29/18 12/03/18 5 63,340 2 B 4.00 12.57 11/29/18 12/05/18 7 65,340 2 C 4.00 12.57 11/29/18 12/26/18 28 86,060 2 D 4.00 12.57 11/29/18 12/26/18 28 83,060 2 E 4.00 12.57 11/29/18 12/26/18 28 83,500 Average (28 days) 2 F 11/29/18 Hold Initial Cure: Outside Final Cure: Moist Room 11/28/18 Sample Time: 1630 Daniel Blocker Clear 8 Batch Size (cy): 8 bucket Same as Sample 1 Garage Columns, 6th Level, Grid Line P1/15, P1/17.6, P7/15, P8/15; Upturn Beam, Grid Line P9 -P11/15; Bumper Wall, Grid Line P3 -P4/18 Compressive Strength Fracture Tested (psi) Type By 5,040 3 5,200 4 6,850 2 6,610 4 6,640 5 6,700 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0563 Service Date: 11/28/18 2501 E Loop 820 N Report Date: 12/28/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Maximum Material Information Set Specimen Avg Diam. Sample Information Date Date Specified Strength: 5,000 psi @ 28 days Sample Date: 11/28/18 Sample Time: 1730 (sq in) Received Tested (days) Sampled By: Daniel Blocker Mix ID: 9727 3 A 4.00 12.57 Weather Conditions: Clear Supplier: Argos 5,230 4 Accumulative Yards: 17 Batch Size (cy): 8 Batch Time: 1630 Plant: 123 Placement Method: bucket Truck No.: 5114 Ticket No.: 12334710 Water Added Before (gal): 86,330 Field Test Data 2 3 D 4.00 Water Added After (gal): 12/26/18 28 83,380 6,640 Sample Location: Bumper Wall Test Result Specification Placement Location: Garage Columns, 6th Level, Grid Slump (in): 7 5-7 Line P1/15, P1/17.6, P7/15, P8/15; Air Content (%): 7.0 * 3-6 3 F Upturn Beam, Grid Line P9 -P11/15; Concrete Temp. (F): 65 50-95 Bumper Wall, Grid Line P3 -P4/18 Ambient Temp. (F): Final Cure: Moist Room Plastic Unit Wt. (pcf): 140.8 Yield (Cu. Yds.): 42.6 * = Field Test Results do not meet project specifications. Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 3 A 4.00 12.57 12/03/18 5 65,720 5,230 4 3 B 4.00 12.57 12/05/18 7 69,380 5,520 2 3 C 4.00 12.57 12/26/18 28 86,330 6,870 2 3 D 4.00 12.57 12/26/18 28 83,380 6,640 4 3 E 4.00 12.57 12/26/18 28 83,370 6,630 3 Average (28 days) 6,710 3 F Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Daniel Blocker Reported To: Contractor: Report Distribution: See attached distribution list. Reviewed By: John, T pa Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 3 of 3 Distribution Page Irerracon Report Number: 95181011.0563 Service Date: 11/28/18 2501 E Loop 820 N Report Date: 12/28/18 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva