Loading...
HomeMy WebLinkAboutTerracon - 1/2/2019CONCRETE COMPRESSIVE STRENGTH TEST REPORT Irerracon Report Number: 95181011.0573 Service Date: 12/04/18 2501 E Loop 820 N Report Date: 01/02/19 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parkine Garace 817-268-8600 Ree No: F-3272 Client Project Coury Hospitality Attn: Mark Brooks 7134 S Yale, Ste 400 Tulsa, OK 74136 Grapevine Main Phase 1 815 South Main Street Grapevine, TX 76051 Project Number: 95181011 Material Information Maximum Sample Information Specified Strength: 5,000 psi @ 28 days Sample Date: 12/04/18 Sample Time: 1437 Test Load Sampled By: Christopher Thompson Mix ID: 9727 (sq in) Weather Conditions: Clear Supplier: Argos (lbs) Accumulative Yards: 5/5 Batch Size (cy): 5 Batch Time: 1405 Plant: 123 Placement Method: Direct Discharge Truck No.: 7092 Ticket No.: 12335011 Water Added Before (gal): 3 Field Test Data 12.57 Water Added After (gal): 01/01/19 28 96,790 Sample Location: Level 1, Garage Bumper Wall Test Result Specification Placement Location: Level 1, Garage Bumper Walls at Slump (in): 6 5-7 7,470 Handicap Ramp Air Content (%): 4.1 3-6 12/05/18 01/01/19 Concrete Temp. (F): 63 7,890 2 Ambient Temp. (F): 47 Plastic Unit Wt. (pcf): 145.6 7,690 Yield (Cu. Yds.): 12/05/18 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 12/05/18 12/11/18 7 78,620 6,260 3 1 B 4.00 12.57 12/05/18 01/01/19 28 96,790 7,700 4 1 C 4.00 12.57 12/05/18 01/01/19 28 93,870 7,470 5 1 D 4.00 12.57 12/05/18 01/01/19 28 99,140 7,890 2 Average (28 days) 7,690 1 E 12/05/18 Hold Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. First truck was almost 2 hours late. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Christopher Thompson Reported To: Contractor: Manhattan Report Distribution: See attached distribution list. Reviewed By: John, T pa Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Cx000t, 11-16-12, xev.6 Page 1 of 1 Distribution Page Irerracon Report Number: 95181011.0573 Service Date: 12/04/18 2501 E Loop 820 N Report Date: 01/02/19 Revision 1 - 28 -day results Fort Worth, TX 76118-6978 Task: Parking Garage 817-268-8600 Distribution List (1) Coury Hospitality, Mark Brooks (1) AECC Inc, Lee Ledet (1) ArchiTexas, Michael Karnowski (1) City of Grapevine TX, Curtis A Bergthold (1) City of Grapevine TX, Hans Strayer (1) City of Grapevine TX, Paul M Lee (1) City of Grapevine TX, Scott Williams (1) City of Grapevine TX, sbatte@grapevinetexas.gov (1) JQ Engineering, Mike Oler (1) Manhattan Construction Company, Ben Jensen (1) Manhattan Construction Company, Chase Pritchard (1) Manhattan Construction Company, Daniel Rideau (1) Manhattan Construction Company, David Saiter (1) Manhattan Construction Company, Frederick Moore (1) Manhattan Construction Company, Klint Robertson (1) Manhattan Construction Company, Matthew Powell (1) Manhattan Construction Company, Robert Montgomery (1) Walker Consultants, Martha M. Villanueva